Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.
// request.cf · coarse context
A page that knows where it met you.
Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.
You can help expand this article with text translated from the corresponding article in German. (April 2026) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must follow the LLM translation guideline, revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Pyhrn Autobahn]]; see its history for attribution.
You may also add the template {{Translated|de|Pyhrn Autobahn}} to the talk page.
The Pyhrn Autobahn (A9) (Pyhrn motorway) is an Autobahn (motorway) in Austria.[1] It runs through the Alps by two two-lane tunnels, the 5,400-metre-long (17,700ft) Bosrucktunnel and the 8,320-metre-long (27,300ft)Gleinalmtunnel. The longest tunnel on the motorway is the 10-kilometre-long (6.2mi)Plabutschtunnel under Graz and its outskirts. The last section of the highway was completed in 2004.
While in 2016 some sections still remain single carriageway, including some tunnels, work is progressing to make the Phyrn Autobahn fully dual carriageway. The second carriageway of the Bosruckstunnel was opened on 19 October 2015. The Tunnelkette Klaus (8 km) and the Gleinalmtunnel (8.3 km — the last sections with a single carriageway — were planned to receive a second carriageway in late 2018 and 2019, respectively.