Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2367a67681490c0

Jump to content

Prospective cost

From Wikipedia, the free encyclopedia

A prospective cost is a cost that may be incurred or changed if an action is taken: Whether or not the cost is paid depends on some action. Prospective costs can lead to unintended loss and positive or negative results for the stakeholders,[1] and can be contrasted with sunk costs, which are costs that have already been incurred.

Use in decision-making

[edit]

Prospective costs are relevant to decision-making when they are expected to change as a result of a proposed action. In management accounting, relevant costs are future cash flows that arise because of a decision, while costs that will not change between alternatives are generally excluded from the analysis.[2]

This distinguishes prospective costs from sunk costs, which have already been incurred and cannot be changed by a future decision. Relevant cash flows should arise in the future, while costs that occurred in the past are treated as sunk costs and excluded from relevant-cost analysis.[3]

References

[edit]
  1. Eltinge, J. L. (2007). Evaluation of prospective benefits, costs and risks of standards for statistical programs. Section on Survey Research Methods.
  2. "Relevant costs". Association of Chartered Certified Accountants. Retrieved 25 June 2026.
  3. "Relevant cash flows". Association of Chartered Certified Accountants. Retrieved 25 June 2026.