Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a4241fd19e7fee28

Jump to content

Prospective cost

From Wikipedia, the free encyclopedia

A prospective cost is a cost that may be incurred or changed if an action is taken: Whether or not the cost is paid depends on some action. Prospective costs can lead to unintended loss and positive or negative results for the stakeholders,[1] and can be contrasted with sunk costs, which are costs that have already been incurred.

Use in decision-making

[edit]

Prospective costs are relevant to decision-making when they are expected to change as a result of a proposed action. In management accounting, relevant costs are future cash flows that arise because of a decision, while costs that will not change between alternatives are generally excluded from the analysis.[2]

This distinguishes prospective costs from sunk costs, which have already been incurred and cannot be changed by a future decision. Relevant cash flows should arise in the future, while costs that occurred in the past are treated as sunk costs and excluded from relevant-cost analysis.[3]

References

[edit]
  1. ↑ Eltinge, J. L. (2007). Evaluation of prospective benefits, costs and risks of standards for statistical programs. Section on Survey Research Methods.
  2. ↑ "Relevant costs". Association of Chartered Certified Accountants. Retrieved 25 June 2026.
  3. ↑ "Relevant cash flows". Association of Chartered Certified Accountants. Retrieved 25 June 2026.