Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
ORD
Connection
HTTP/2
Language
Not provided

Ray ID: a46c4b234fc4b6b1

Jump to content

// Workers AI · dad joke modeWhat did postmortem documentation say to the dead file? You're closed.

From Wikipedia, the free encyclopedia
(Redirected from Post mortem analysis)

A project post-mortem is a process used to identify the causes of a project failure (or significant business-impairing downtime), and how to prevent them in the future. This is different from a Retrospective, in which both positive and negative things are reviewed for a project.

The Project Management Body of Knowledge (PMBOK) refers to the process as lessons learned.[1] Project post-mortems are intended to inform process improvements which mitigate future risks and to promote iterative best practices. Post-mortems are often considered a key component of, and ongoing precursor to, effective risk management.[2]

Elements of a project post-mortem

[edit]

Post-mortems can encompass both quantitative data and qualitative data. Quantitative data include the variance between the hours estimated for a project and the actual hours incurred. Qualitative data will often include stakeholder satisfaction, end-user satisfaction, team satisfaction, potential reusability and perceived quality of end-deliverables.

Role of time tracking

[edit]

Successful analysis of project estimate variance is dependent on accurate time tracking. The greater the granularity with which time is tracked, the more detailed an analysis can be performed during the project post-mortem.

See also

[edit]

References

[edit]
  1. ↑ Lessons Learned on the website of the Center for Disease Control, read 3. September 2015.
  2. ↑ IEEE: A defined process for project post mortem review
[edit]