Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a4114d73e8018cc1

Jump to content

// Workers AI · dad joke modeWhat did Port Vera say to the ship? "Sea you later".

Port Vera, or Vera Port Coal Terminal as it is colloquially known, is a coal terminal in Russia's Far East. It is located across the bay from Vladivostok.[1][2][3] It cost more than $1 billion in Rubles to build.[4] The terminal is to have a capacity of to 20 million tonnes per year.[5]

History

[edit]

Port Vera project began in 2014. It was subsidized by Rostec and designed by Rosengineering.[4]

In August 2022, the port was completed with a draft of 12.11 meters. The berth is 246 meters long.[5]

In 2023, the port was sold to the Sibanthracite Group. [6]

In February 2025, North American Company, Inc. made a purchase offer for Port Vera and its assets of $5 billion in Rubles. No other information is known about this offer.

References

[edit]
  1. ↑ "Glavgosexpertiza approves construction of coal terminal Port "Vera" in Primorye".
  2. ↑ https://en.topcor.ru/35271-morskoj-terminal-port-vera-operedivshij-sankcii.html. {{cite news}}: Missing or empty |title= (help)
  3. ↑ "Roing".
  4. 1 2 "Construction of coal port Vera to require $1 billion of investment".
  5. 1 2 "Construction of coal terminal Port Vera completed with positive conclusion obtained from ad hoc regulator". 26 August 2022.
  6. ↑ "The owner of Sibanthracite Group is to buy a port in Primorsky Krai | the Coal Hub". 29 June 2024.

42°57′27″N 132°17′37″E / 42.95750°N 132.29361°E / 42.95750; 132.29361