Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a225bf7228cb6bf7

Jump to content

Pieman River Power Development

From Wikipedia, the free encyclopedia

Pieman River Power Development was a major 1970s and 1980s hydroelectric development of the Pieman River and its tributaries on the west coast of Tasmania.

Development

[edit]

The Pieman River Power Development was approved by the Tasmanian government in 1971, construction began in 1974 and it was completed in 1987.[1]

The damming of the river was the subject of a struggle between conservation groups and Hydro Tasmania, similar to Lake Pedder . The struggle went relatively unnoticed[citation needed] on mainland Australia - and it was the proposed Franklin Dam issue that was to catch a much wider Australian audience, than the damming of the Pieman or King Rivers.

The development included three power stations and five dams:-

  • Murchison Dam  impounded the Murchison River to form Lake Murchison;
  • Tullabardine Dam and Mackintosh Dam  impounded the Mackintosh River to form Lake Mackintosh, for the generation of hydroelectricity at the Mackintosh Power Station that was commissioned in 1982;
  • Bastyan Dam  impounded the Pieman River to form Lake Rosebery, for the generation of hydroelectricity at the Bastyan Power Station that was commissioned in 1983;
  • Reece Dam  impounded the Pieman River to form Lake Pieman, for the generation of hydroelectricity at the Reece Power Station that was commissioned in 1986 and 1987.

Legacy

[edit]

It remains Hydro Tasmania's most successfully[citation needed] multi-dammed catchment on the West Coast, and it was developed after the Upper Gordon Scheme (Lake Pedder) and was being completed in the era of the Franklin Dam controversy. It could be seen as the last major Power Development Scheme undertaken by the Hydro during its stage as an expanding dam-making enterprise. The King River and Henty River developments that followed required specifically challenging engineering on the part of Hydro, but were smaller projects in duration.