Northern Access Link Expressway
| Northern Access Link Expressway | |
|---|---|
| NALEX | |
| Route information | |
| Maintained by SMC Northern Access Link Expressway Corporation | |
| Length | 136.4 km[1] (84.8 mi) Phase 1 – 19.4 km (12.1 mi) Phase 2 – 117 km (73 mi) |
| Status | Under construction |
| Restrictions | No motorcycles below 400cc |
| Major junctions | |
| South end | |
| North end | |
| Location | |
| Country | Philippines |
| Regions | Metro Manila, Central Luzon |
| Provinces | Bulacan, Pampanga, Tarlac |
| Major cities | Caloocan, Valenzuela, Malabon, Obando, Bulakan, Malolos, Tarlac City |
| Highway system | |
| |
The Northern Access Link Expressway (NALEX) is a 136.4 km (84.8 mi) under-construction controlled-access toll expressway in the Philippines.[1] It is designed to connect Metro Manila directly to the New Manila International Airport (NMIA) in Bulakan, Bulacan, and extend further north across Pampanga to terminate at Tarlac City.[2]
The tollway is being constructed under a 30-year Supplemental Toll Operation Agreement (STOA) granted by the Toll Regulatory Board (TRB) to San Miguel Corporation (SMC).[3] NALEX serves as Component 1 of SMC's Greater Capital Region Integrated Expressways Network.[1]
Route description
[edit source]NALEX combines elevated viaducts and at-grade expressways split across two main phases:
Phase 1
[edit source]Phase 1 spans 19.4 km (12.1 mi).[3] The expressway originates at the northern end of Skyway Stage 3 at the Balintawak Interchange in Caloocan via an elevated viaduct. It proceeds northwards through Valenzuela, Malabon, and Obando before leading directly into the New Manila International Airport complex in Bulakan, Bulacan.[1]
Phase 2
[edit source]Phase 2 spans 117 km (72.7 mi) as an extension from the airport site in Bulakan.[3] The alignment travels along coastal and inland areas of Bulacan and Pampanga (including Masantol) before heading north to connect with the Tarlac–Pangasinan–La Union Expressway (TPLEX) in Tarlac City.[2]
History
[edit source]On May 6, 2022, the Toll Regulatory Board (TRB) approved the Supplemental Toll Operation Agreement (STOA) for NALEX with an estimated project cost of ₱148.30 billion.[3] SMC Northern Access Link Expressway Corporation was designated as the concessionaire, while Skyway O&M Corporation was appointed as the tollway operator.
The Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate (ECC) for NALEX Phase 1. Final engineering designs (FED) were subsequently submitted by SMC to the TRB and the Department of Public Works and Highways (DPWH) for final technical review and notice to proceed.[2]
Exits
[edit source]Exits will be numbered by kilometer markers. Locations and final interchange designs for Phase 1 are based on the alignment published by SMC Infrastructure and the Toll Regulatory Board.
Phase 1, Section 1 (Balintawak to NMIA)
[edit source]| Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes | |
|---|---|---|---|---|---|---|---|---|
| Caloocan | Skyway Stage 3 / Balintawak Interchange | Southern terminus | ||||||
| Valenzuela | No major junctions | |||||||
| Malabon | No major junctions | |||||||
| Obando | No major junctions | |||||||
| Bulakan | NMIA Interchange | New Manila International Airport | Cloverleaf interchange; northern terminus for Phase 1, Section 1; starting point for Phase 1, Section 2 (to TPLEX) and Marilao Access Link Expressway | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Phase 1, Section 2 (NMIA to Tarlac City)
[edit source]Phase 1, Section 2 covers the main at-grade expressway entirely within Central Luzon, running from NMIA to TPLEX in Tarlac City and including the BTEX Tabang Link spur.
| Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Bulacan | Bulakan | NMIA / Bulakan Interchange | New Manila International Airport | Southern terminus for Phase 1, Section 2; junction with BTEX Tabang Link | |||
| Guiguinto | Tabang Interchange | Terminus of the BTEX Tabang Link spur; connects to NLEX (Sta. Rita Exit area) | |||||
| Pampanga | Masantol | Masantol Interchange | Local roads | Interchange along Phase 1, Section 2 main alignment; junction for proposed Phase 2 expansion | |||
| Guagua | Guagua Interchange | Local roads | Phase 1, Section 2 alignment | ||||
| Porac | Porac Interchange | Phase 1, Section 2 interchange with SCTEx | |||||
| Mabalacat | Mabalacat Interchange | Clark Freeport and Special Economic Zone | Phase 1, Section 2 alignment near Clark area | ||||
| Tarlac | Capas | Capas Interchange | New Clark City | Phase 1, Section 2 alignment | |||
| Tarlac City | TPLEX / Tarlac City Interchange | Northern terminus of Phase 1, Section 2 connecting to TPLEX | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
See also
[edit source]References
[edit source]- 1 2 3 4 "Northern Access Link Expressway". SMC Infrastructure. Retrieved August 6, 2026.
- 1 2 3 Jose, Ashley Erika O. (November 21, 2024). "TRB sees implementation of 3 SMC toll road projects next year". BusinessWorld. Retrieved August 6, 2026.
- 1 2 3 4 "SMC to proceed with full-blast NALEX construction by Q4". Daily Tribune. June 26, 2024. Retrieved August 6, 2026.