Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a270a72be8a3bde9

Jump to content

Northern Access Link Expressway

From Wikipedia, the free encyclopedia
Northern Access Link Expressway
NALEX
Route information
Maintained by SMC Northern Access Link Expressway Corporation
Length136.4 km[1] (84.8 mi)
Phase 1 – 19.4 km (12.1 mi)
Phase 2 – 117 km (73 mi)
StatusUnder construction
RestrictionsNo motorcycles below 400cc
Major junctions
South end E2 (Skyway Stage 3) at Balintawak in Caloocan
Major intersections
North end E1 (Tarlac–Pangasinan–La Union Expressway) in Tarlac City
Location
CountryPhilippines
RegionsMetro Manila, Central Luzon
ProvincesBulacan, Pampanga, Tarlac
Major citiesCaloocan, Valenzuela, Malabon, Obando, Bulakan, Malolos, Tarlac City
Highway system
  • Roads in the Philippines

The Northern Access Link Expressway (NALEX) is a 136.4 km (84.8 mi) under-construction controlled-access toll expressway in the Philippines.[1] It is designed to connect Metro Manila directly to the New Manila International Airport (NMIA) in Bulakan, Bulacan, and extend further north across Pampanga to terminate at Tarlac City.[2]

The tollway is being constructed under a 30-year Supplemental Toll Operation Agreement (STOA) granted by the Toll Regulatory Board (TRB) to San Miguel Corporation (SMC).[3] NALEX serves as Component 1 of SMC's Greater Capital Region Integrated Expressways Network.[1]

Route description

[edit source]

NALEX combines elevated viaducts and at-grade expressways split across two main phases:

Phase 1

[edit source]

Phase 1 spans 19.4 km (12.1 mi).[3] The expressway originates at the northern end of Skyway Stage 3 at the Balintawak Interchange in Caloocan via an elevated viaduct. It proceeds northwards through Valenzuela, Malabon, and Obando before leading directly into the New Manila International Airport complex in Bulakan, Bulacan.[1]

Phase 2

[edit source]

Phase 2 spans 117 km (72.7 mi) as an extension from the airport site in Bulakan.[3] The alignment travels along coastal and inland areas of Bulacan and Pampanga (including Masantol) before heading north to connect with the Tarlac–Pangasinan–La Union Expressway (TPLEX) in Tarlac City.[2]

History

[edit source]

On May 6, 2022, the Toll Regulatory Board (TRB) approved the Supplemental Toll Operation Agreement (STOA) for NALEX with an estimated project cost of ₱148.30 billion.[3] SMC Northern Access Link Expressway Corporation was designated as the concessionaire, while Skyway O&M Corporation was appointed as the tollway operator.

The Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate (ECC) for NALEX Phase 1. Final engineering designs (FED) were subsequently submitted by SMC to the TRB and the Department of Public Works and Highways (DPWH) for final technical review and notice to proceed.[2]

Exits will be numbered by kilometer markers. Locations and final interchange designs for Phase 1 are based on the alignment published by SMC Infrastructure and the Toll Regulatory Board.

Phase 1, Section 1 (Balintawak to NMIA)

[edit source]
ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
CaloocanSkyway Stage 3 / Balintawak Interchange E2 (Skyway Stage 3)Southern terminus
ValenzuelaNo major junctions
MalabonNo major junctions
ObandoNo major junctions
BulakanNMIA InterchangeNew Manila International AirportCloverleaf interchange; northern terminus for Phase 1, Section 1; starting point for Phase 1, Section 2 (to TPLEX) and Marilao Access Link Expressway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

Phase 1, Section 2 (NMIA to Tarlac City)

[edit source]

Phase 1, Section 2 covers the main at-grade expressway entirely within Central Luzon, running from NMIA to TPLEX in Tarlac City and including the BTEX Tabang Link spur. 

ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
BulacanBulakanNMIA / Bulakan InterchangeNew Manila International AirportSouthern terminus for Phase 1, Section 2; junction with BTEX Tabang Link
GuiguintoTabang InterchangeTerminus of the BTEX Tabang Link spur; connects to NLEX (Sta. Rita Exit area)
PampangaMasantolMasantol InterchangeLocal roadsInterchange along Phase 1, Section 2 main alignment; junction for proposed Phase 2 expansion
GuaguaGuagua InterchangeLocal roadsPhase 1, Section 2 alignment
PoracPorac Interchange E1 (Subic–Clark–Tarlac Expressway)Phase 1, Section 2 interchange with SCTEx
MabalacatMabalacat InterchangeClark Freeport and Special Economic ZonePhase 1, Section 2 alignment near Clark area
TarlacCapasCapas InterchangeNew Clark CityPhase 1, Section 2 alignment
Tarlac CityTPLEX / Tarlac City Interchange E1 (Tarlac–Pangasinan–La Union Expressway) BaguioNorthern terminus of Phase 1, Section 2 connecting to TPLEX
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

[edit source]

References

[edit source]
  1. 1 2 3 4 "Northern Access Link Expressway". SMC Infrastructure. Retrieved August 6, 2026.
  2. 1 2 3 Jose, Ashley Erika O. (November 21, 2024). "TRB sees implementation of 3 SMC toll road projects next year". BusinessWorld. Retrieved August 6, 2026.
  3. 1 2 3 4 "SMC to proceed with full-blast NALEX construction by Q4". Daily Tribune. June 26, 2024. Retrieved August 6, 2026.
[edit source]