Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2326df299aac69c

Jump to content

// Workers AI · dad joke modeWhat did the Nevada Subdivision say? "I'm divided.

From Wikipedia, the free encyclopedia

Nevada Subdivision
Winnemucca
Amtrak
Lovelock
rerouted c.1902
Fallon branch
Fernley
Wadsworth
rerouted c.1902
Innovation Park
rerouted c.1902
Sparks
Sparks Yard

The Nevada Subdivision is a railway line in Nevada owned by the Union Pacific Railroad, as part of the Overland Route.[1][2] It runs from Sparks to Weso, Nevada, east of Winnemucca. While part of the Overland Route, the line also serves to connect the Central Corridor to California via the Donner Pass route through the Sierra Nevada. The line was originally built as a segment of the first transcontinental railroad between June and November 1868.[3] While primarily utilized for freight since 1971, the route is used by the once-daily Amtrak California Zephyr. As of 2003 the line hosts 14 freight trains per day.[4]

References

[edit]
  1. "Oklahoma, Nevada on Union Pacific's to-do list". Railway Age. April 3, 2018. Retrieved August 15, 2021.
  2. Corona, Marcella (March 25, 2015). "UPDATE: Derailed Nevada train delays 33 others". Reno Gazette-Journal. Retrieved August 15, 2021.
  3. Sacramento to Ogden Original Construction Dates (Map). Union Pacific. Retrieved August 15, 2021.
  4. Union Pacific Tons per Train (PDF) (Map). Trains. 2003. Retrieved September 11, 2023.