Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23309a5d97af25b

Jump to content

NIGELEC

From Wikipedia, the free encyclopedia

NIGELEC (Société Nigérienne d'Electricité, Nigerien Electricity Society) is the Parastatal electric power generation and transmission utility in Niger. It is majority owned by the Government of Niger and was founded in 1968. In 2006 NIGELEC had 178964 subscribers and 300 electrified centers.[1] The NIGELEC management is overseen by the Ministry of Mines and Energy.

NIGELEC operates four power plants: Niamey I and Niamey II (in Niamey proper and the suburb of Goudel), the Malbaza Power Station (at Malbaza, near Tahoua) and the Zinder & Maradi Thermal Power Station (near Zinder).[2][3]

70% of Niger's electricity typically comes from Nigeria. In the aftermath of the 2023 Nigerien coup d'état, Nigeria stopped transmitting electricity to Niger, leading to large-scale power outages. The company started buying electricity from Nigeria in 2024 after the ban was removed.[4]

See also

[edit]

References

[edit]
  1. African Development Information Database: Société Nationale d'Electricité du Niger. Retrieved 2009-02-20
  2. African Development Information Database: Power Infrastructures in West Africa. Retrieved 2009-02-20
  3. NIGELEC: Dig Deeper: Plants Owned By This Company Archived 2023-06-05 at the Wayback Machine. Carbon Monitoring for Action (CARMA) Database, Center for Global Development. Retrieved 2009-02-20
  4. "Coup sanctions plunge Niamey into the dark". AFP. Retrieved 2023-08-07.
[edit]