Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a239af323eaeeddd

Jump to content

// Workers AI · dad joke modeWhy did MyHSR Corp go to therapy? It had track issues.

From Wikipedia, the free encyclopedia
MyHSR Corporation Sdn Bhd
TypeState-owned enterprise
IndustryDeveloper and asset owner of HSR project
Key people
ProductsKuala Lumpur–Singapore High Speed Rail Project
Websitehttp://www.myhsr.com.my/

MyHSR Corporation Sdn Bhd (MyHSR Corp) is a Malaysian company fully owned by the Ministry of Finance of Malaysia. It was set up to be the developer and asset owner of the terminated Kuala Lumpur–Singapore High Speed Rail project (HSR) at Malaysian side, under the government's move to improve connectivity between the two countries, as currently traffic congestion is acute and far exceeds the capacity of the Causeway at Johor Bahru, with the current infrastructure provisions.

The primary objective for the construction of the HSR is to reduce the travel time between Kuala Lumpur and Singapore to 90 minutes by strengthening the link between two of Southeast Asia's most vibrant and fast-growing economic engines. In addition, the HSR presented an opportunity to open up and rejuvenate smaller cities in Peninsular Malaysia by connecting them to the two major metropolises.[3]

HSR projects

[edit]

Chronology

[edit]
  • 9 April 2015 - MoF seeks RM10m for wholly owned unit MyHSR Corp.[4]
  • 13 April 2015 - RM38.4b high-speed rail project approved.[5]
  • 18 April 2015 - Cost-sharing likely for HSR.[6]
  • 20 April 2015 - MyHSR Corp to oversee high-speed project.[7]
  • 24 April 2015 - Malaysia approves US$10.6 billion high-speed rail project and the establishment of MyHSR Corp.[8]

See also

[edit]

References

[edit]
  1. "MyHSR Corp appoints Fauzi Abdul Rahman as chairman". The Star. 26 June 2023. Retrieved 12 July 2023.
  2. Priyatharisiny Vasu (11 July 2023). "MyHSR Corp seeks concept proposals to revive KL-Singapore HSR". The Edge Malaysia. Retrieved 12 July 2023.
  3. "High Speed Rail". spad.gov.my. Archived from the original on 2016-03-13.
  4. "MoF seeks RM10m for wholly-owned unit MyHSR Corp". theedgemarkets.com.
  5. "RM38.4b high speed rail project approved". themalaysianreserve.com. Archived from the original on 2015-05-18. Retrieved 2015-05-16.
  6. "Cost-sharing likely for HSR". thestar.com.my.
  7. "MyHSR Corp to oversee high speed project". railwaygazette.com.
  8. "Malaysia approves USD 10.6 billion high speed rail project and the establishment of MyHSR Corp". railwaypro.com.
[edit]
  • Wikimedia Commons logo Media related to High-speed rail at Wikimedia Commons
  • SPAD
  • Prasarana
  • MRT Corp