Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22e1a771a94227c

Jump to content

// Workers AI · dad joke modeWhat did the Mut Wind Farm say? "We're blown away

Mut Wind Farm
Map
Official nameMut Rüzgâr Enerji Santrali
CountryTurkey
LocationMt. Magras, Mut, Mersin Province
Coordinates36°44′N 33°15′E / 36.733°N 33.250°E / 36.733; 33.250
StatusOperational
Commission date2010; 16 years ago (2010)
Construction costUS$50 million
Wind farm
Typeonshore
Hub height80 m (262 ft)
Rotor diameter90 m (295 ft)
Site elevation1,370 m (4,495 ft)
Power generation
Units operational11
Nameplate capacity11 x 3 MW
Annual net output100 million MWh

Mut Wind Farm is a wind power plant consisting of eleven wind turbines situated on Mt. Magras in Özlü in the Mut district of Mersin Province in southern Turkey. The wind farm went into service in 2010.[1]

Geography

[edit]

The farm is constructed on Mount Magras, a part of Toros Mountains range to the north of Mut district in Mersin Province. Mount Magras is actually the top of a 1,370 m (4,490 ft) canyon to the south of Göksu River valley and the town of Göksu. The wind turbines are erected just to the northeast of the village Özlü and the farm is sometimes called the Özlü Wind Farm.

Technical details

[edit]

There are eleven turbines each 80 m (260 ft) high with rotor diameter of 90 m (300 ft). Maximum power output of each turbine is 3 MW and the total annual energy production is about 100 MWh.[2] The energy is fed to Gezende Dam situated about 25 km (16 mi) southwest of Mut wind farm.

Project

[edit]

The US$50 million project was carried out by Ağaoğlu Energy Group, and it is further planned to increase the number of turbines to 40.

See also