Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a252b4c46ce1c892

Jump to content

Moralane

Moralane
Water tank and pumping station
Moralane is located in Botswana
Moralane
Moralane
Location within Botswana
Coordinates: 22°04′29″S 27°38′34″E / 22.074783°S 27.642843°E / -22.074783; 27.642843
CountryBotswana
DistrictCentral District

Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone.

Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River.[1] A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase. The break pressure tank has the capacity of 4,500 cubic metres (160,000 cu ft) and the pumping station has the capacity of 1.51 cubic metres (53 cu ft) per second.[2]

Phase 2 of the NSC is due to start delivering water from the Dikgatlhong Dam on the Shashe River in 2014. The new pipeline from the Dikgatlhong Dam runs parallel to the existing pipeline along the section from the Letsibogo Dam to Moralane, causing concerns that blasting for the new pipeline may cause problems with the existing pipeline.[3] The pumping equipment at Moralane will be upgraded by introduction of a variable speed drive. Initially, the water from both dams will be delivered through the same pipeline from Moralane south to Palapye.[4]

An extension of the NSC is being considered to carry the Zambezi's water from Pandamatenga via Francistown to BPT1 at Moralane. A pre-feasibility study was delivered to the Department of Water Affairs in April 2010. This expansion would deliver another 100,000,000 cubic metres (3.5×109 cu ft) of water annually through the Moralane plant.[5]

References

[edit]

Citations

Sources

  • Modikwa, Onalenna (22 June 2012). "More delays in Dikgatlhong Dam pipeline". Mmegi. Retrieved 21 September 2012.
  • "North-South Carrier Water Project Field Survey" (PDF). Japan Bank of International Cooperation. July 2003. Retrieved 24 September 2012.
  • B. Paya; G.T. Matsiara; I.J. Bettesworth; M. van der Walt; P. du Plessis; B. Bosman; D. Stephenson; N. Mbayi; A. Keabetswe (2012). "BOTSWANA'S NORTH SOUTH CARRIER 2 WATER TRANSFER SCHEME" (PDF). WISA 2012 conference. Archived from the original (PDF) on 3 March 2016. Retrieved 22 September 2012.
  • WRC (August 2010). "Feasibility Design Study on the Utilization of the Water Resources of the Chobe/Zambezi River" (PDF). Ministry of Minerals, Energy and Water Resources, Department of Water Affairs. Retrieved 24 September 2012.