Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23e92c54f92f4d4

Jump to content

// Workers AI · dad joke modeWhat did the Matiltan Hydropower Project say? I'm generating interest.

From Wikipedia, the free encyclopedia

Matiltan Hydropower Project is a proposed run-of-the-river hydro-power generation project which is located in the Gorkin Matiltan region of Kalam valley, District Swat, Khyber Pakhtunkhwa province of Pakistan, on the left tributary of Suvastu River. The power station has a planned generating capacity of 84 MW.[1][2]

Construction

[edit]

In October 2020, the project was estimated to be 47 percent complete.[3]

References

[edit]
  1. "84 MW GORKIN-MATILTAN HYDROPOWER PROJECT". Barqaab. 2012-04-17. Retrieved 2022-09-04.
  2. "Energy & Power". www.kpkep.gov.pk. Archived from the original on 2015-05-26.
  3. Report, Bureau (2020-10-11). "CM orders timely completion of hydropower projects". DAWN.COM. Retrieved 2021-10-07. {{cite web}}: |first= has generic name (help)