Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23eef71d875b87b

Jump to content

MBIR

From Wikipedia, the free encyclopedia
MBIR
Reactor conceptFast-neutron reactor[1]
StatusUnder construction since 2015
LocationDimitrovgrad, Russia, Russia
Main parameters of the reactor core
Fuel (fissile material)vibropacked MOX fuel with plutonium content of 38%[1]
Neutron energy spectrumFast
Primary coolantsodium (Pb–Bi, gas)[1]
Reactor usage
Power (thermal)150 MW[2]
Power (electric)55 MW[2]

The MBIR (Russian: Многоцелевой Быстрый Исследовательский Реактор, romanized: Mnogotselevoy Bystryy Issledovatel'skiy Reaktor, lit. 'Multipurpose Fast Research Reactor') is a multi-loop research reactor capable of testing lead, lead-bismuth and gas coolants, and run on MOX fuel. MBIR intends to replace the old BOR-60 experimental fast reactor that started operations at RIAR's site in 1969. It will have a design life of 50 years.[3]

History

[edit]

Construction has started in 2015.[4] MBIR control assembly was installed in 2019.[5] Reactor vessel was installed in 2023.[6] Pilot fuel elements were produced in 2024. The MBIR is scheduled to begin operation in 2027.[3]

Estimated commissioning date is 2028.[2]

See also

[edit]

References

[edit]
  1. 1 2 3 "Fast Neutron Reactors". world-nuclear.org. Retrieved 31 August 2024.
  2. 1 2 3 "MBIR reactor".
  3. 1 2 "Pilot fuel elements produced for MBIR fast neutron research reactor".
  4. "Russia begins construction of MBIR". 16 September 2015.
  5. "Russia starts installing MBIR control assembly".
  6. "MBIR gets its reactor vessel".
[edit]