Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a227bc2acb192a9c

Jump to content

London Transit

From Wikipedia, the free encyclopedia
London Transit
A New Flyer XD40 in service on Route 94 in 2025
Founded1951 (1951) (from London Street Railway)
Headquarters450 Highbury Avenue N
Service areaLondon, Ontario
Service typePublic Transit
Routes
  • 28 regular
  • 6 express
  • 2 rapid transit (2027/2028)
  • 4 school
  • 6 community[1]
Fleet240 buses
Annual ridership
17.46 million (2025)[2]
OperatorCity of London
General Manager
Kelly S. Paleczny
Websitehttps://www.londontransit.ca
A retired GM Classic bus in the old colour scheme

The London Transit Commission (LTC) is the operator of the public transit system of London, Ontario, Canada. It operates transit bus service and para-transit service. In 2025, annual ridership totaled 17.46 million.[2] As of 2026, the LTC has 28 regular bus routes, six express routes, four university and college routes that run during the post-secondary school year, and six community bus routes that each run one day per week.[1]

Rapid Transit, formerly known as Shift, is a bus rapid transit (BRT) system under construction. The network consists of two corridors that converge at a central downtown hub. As of October 2024, the East London Link is scheduled for completion in 2026, with operations expected to begin in mid-2027 and a target opening in August 2027. The Wellington Gateway is expected to be completed by 2027, with operations slated to begin in summer 2028.[3]

History

[edit]

London Street Railway

[edit]

London Street Railway Company (LSR), a privately operated transit service, brought public transit to the city with the start of horse-drawn streetcar operations May 24, 1875, on Dundas Street.

Fleet

[edit]

Facilities

[edit]
  • Car barns at Dundas and Lyle Streets - since demolished[5]

Routes

[edit]
  • Dundas Street - Eva Street to Wharncliffe Road; north on Wharncliffe to Oxford Street; east on Oxford to Gunn Street
  • Adelaide Street - Dundas Street to Central Avenue; along Central to Clarence Street
  • Oxford Street - Clarence Street to Adelaide Street
  • Ridout Street - Garfield West to Horton Street; along Garfield to Wortley Road to Briscoe Street to Elmwood Avenue; Elmwood to Wharncliffe Highway; to Askin Street to Stanley Road; to Elmwood Avenue to Ridout
  • Hamilton Road - Egerton to Maitland Street and Horton Street; Horton Street from Maitland to Thames Street; north of Thames to Stanley Street; along Stanley to Wharncliffe Highway
  • Central Avenue - from Adelaide to Clarence Street
  • Richmond Street - Horton Street to St James Street; along St James to Wellington Street then Clarence Street to Regent; along Regent to Clarence and then north to Huron Street
  • Springbank Park
  • South Street - Hamilton Road to Horton Street to Richmond Street or Thames Street; either north to Stanley Street to Ridout north to Dundas Street or Richmond Street to Dundas Street

[4]

Ownership

[edit]

Privately owned from 1875 to 1920, the Ontario Railway and Municipal Board took over control of LSR in 1920.[4]

Demise

[edit]

The Springbank Park streetcar route ended in 1936, and all remaining streetcar routes ended by 1940. In later years, the city would assume operation of some routes. In 1951, the city assumed control over all routes and formed the London Transportation Commission to operate them.[4][6] Until 1940, streetcars provided the bulk of the service. The streetcar system was fully converted to buses in late November 1940 (originally planned for the end of 1940, but hastened by a blizzard that damaged trolley wires).

London Transit

[edit]
A a picture of a New Flyer Low Floor in service in 2007.
A New Flyer Low Floor in service in 2007

In 1974, the LTC adopted its present name, and greatly expanded its service area to cover the newly annexed area in Middlesex County.[4] The system has evolved to feature community bus routes, para-transit services and accessible low floor buses with the express lines as the backbone. In 2003, the LTC opened bus terminals at Argyle and Masonville malls.

2009 transit strike

[edit]

On November 16, 2009, Amalgamated Transit Union (ATU) Local 741 representing bus drivers and support workers went on strike, the first transit strike for London Transit since 1980. The strike affected all public routes; however, specialized transit services for the disabled continued to operate.

To lessen the inconvenience on university students, the University of Western Ontario (UWO) increased its shuttle bus service. As well, the University Students' Council (USC) secured rental vans driven by volunteers, looping around the city picking up students at key areas and dropping them off at the university. A community-based approach was taken by the USC including a flag-a-ride program and a shuttle service for groceries. David Empey, president of the UWO staff association, was against this volunteer service, calling it "scab labour". He said it was irresponsible to set up a system which replaced the job of striking workers. Despite this, pickets were set up at the university encouraging students to help their cause. "The strike is really inconveniencing people who are paid even less than the drivers," said a third-year Western student. "This shuttle is a good idea. I had hoped they'd put something like this together. We still have to pay for our transit pass [even if there's a strike]".[7]

On December 7, 2009, ATU turned down the LTC's "Final Offer" of 9.3% wage hike over three years. This offer was rejected by 78.5% (322 of 410) of the ATU membership.[8]

The strike ended on December 14, 2009.[9]

MagusCards

[edit]

In October 2021, London Transit partnered with MagusCards to help those with autism or other cognitive special needs. This is one of the key initiatives outlined in the LTC's five-year Accessibility Plan to make the city's transit system more accessible and easier to navigate.[10]

Fleet

[edit]
Year Manufacturer Model Fleet numbers Engine Transmission Photo
2013 New Flyer XD60 28-29 Cummins ISL9 (EPA10) Allison B500R
Bus 29 on Route 27
2014 New Flyer XD60 30-31 Cummins ISL9 (EPA10) Allison B500R
Bus 30 on Route 10
2015 New Flyer XD60 32 Cummins ISL9 (EPA10) Allison B500R
Bus 32 on Route 9
2016 New Flyer XD60 33 Cummins ISL9 (EPA10) Allison B500R
Bus 33 on Route 31
2017 New Flyer XD60 34 Cummins L9 (EPA10 GHG1) Allison B500R
Bus 34 on Route 31
2022 New Flyer XD60 35-36 Cummins L9 (EPA21 GHG2) Allison B500R
Bus 36 on Route 4A
2024 New Flyer XD60 37 Cummins L9 (EPA24) Allison B500R
Bus 37 on Route 15A
2025 New Flyer XD60 38-41 Cummins L9 (EPA24) Allison B500R
Bus 41 on Route 17A
2026 New Flyer XD60 42-43 Cummins L9 (EPA24) Allison B500R
Bus 42 on Route 31
2027 New Flyer XD60 44-52 (ON ORDER) Cummins X10 (EPA27) TBD
2009 New Flyer D40LF 148, 153 (inactive) Cummins ISL9 (EPA07) Allison B400R
2010 New Flyer D40LF 163, 166 (inactive) Cummins ISL9 (EPA07) Allison B400R
2012 New Flyer XD40 316, 320 Cummins ISL9 (EPA10) Allison B400R
Bus 313 on Route 35
2013 New Flyer XD40 321-323, 325, 327-332 Cummins ISL9 (EPA10) Allison B400R
Bus 329 on Route 10
2014 New Flyer XD40 333-347 Cummins ISL9 (EPA10) Allison B400R
Bus 339 on Route 10
2015 New Flyer XD40 348-364 Cummins ISL9 (EPA10) Allison B400R
Bus 355 on Route 94
2016 New Flyer XD40 365-378 Cummins ISL9 (EPA10) Allison B400R
Bus 365 on Route 2B
2017 New Flyer XD40 501-527 Cummins L9 (EPA10 GHG1) Allison B400R
Bus 525 to Route 94
2018 New Flyer XD40 528-546 Cummins L9 (EPA10 GHG1) Allison B400R
Bus 543 on Route 13A
2019 New Flyer XD40 547-555 Cummins L9 (EPA10 GHG1) Allison B400R
Bus 549 on Route 90
2020 New Flyer XD40 556-571 Cummins L9 (EPA10 GHG1) Allison B400R
Bus 558 on Route 13
2021 New Flyer XD40 572-590 Cummins L9 (EPA21 GHG2) Allison B400R
Bus 580 on Route 2A
2022 New Flyer XD40 591-610 Cummins L9 (EPA21 GHG2) Allison B400R
Bus 608 on Route 25
2024 New Flyer XD40 611-634 Cummins L9 (EPA24) Allison B400R
Bus 621 in Highbury Garage after Route 19
2025 New Flyer XD40 635-664 Cummins L9 (EPA24) Allison B400R
Bus 663 on Route 91
2026 New Flyer XD40 665-691 (665-675, 677 active) (678, 681, 686, 690 delivered) Cummins L9 (EPA24) Allison B400R
Bus 686 at Highbury Garage; not yet in service.
2027 New Flyer XD40 701-717 (ON ORDER) Cummins X10 (EPA27) TBD
2028 TBD Battery Electric 10 units TBD TBD

Bus rapid transit

[edit]
A picture of a bus lane along king street in London, Ontario
Bus lane along King Street

Rapid Transit, formerly known as Shift,[11] is a bus rapid transit (BRT) network under construction in London, Ontario, consisting of two corridors that converge at a central downtown hub. The project aims to improve traffic flow, enhance streetscapes, and replace aging underground infrastructure.

The rapid transit system features dedicated bus lanes, including curbside and centre-running lanes, and transit priority signals for smoother operations. Enhanced stations are being designed to accommodate large passenger loads, with seating areas, route information, security cameras, and tempered glass for safety and comfort. The project also includes the installation of new streetscape elements and urban design improvements, which will help ease traffic flow and improve the overall public transit experience in London.[12]

As of October 2024, the East London Link is scheduled for completion in 2026, with operations expected to begin in mid-2027. The route will run between downtown and Fanshawe College, with a target opening in August 2027. Similarly, the Wellington Gateway project is expected to be completed by 2027, with service slated to begin in mid-2028 and a summer 2028 opening for the segment between downtown and White Oaks Mall.[13][14]

Ridership

[edit]

After the public transit boom of the 1960s and 1970s, ridership began to slip. At that time, almost every transit route passed through London's downtown area. An attempted building of two downtown malls and the economic recession of the 1990s combined to force the downtown area into serious decline.[citation needed] An economic slump echoed in a parallel drop in ridership, made even worse by the traditional responses of service cuts and fare increases. Between 1987 and 1996, LTC ridership declined by almost 40 percent.[citation needed]

In 1994, the LTC began developing a comprehensive business plan to turn these trends around. Innovations included an overhauling of fare structure, re-thinking routes, bringing buses into mall areas (which would later become true terminal areas), and making standard public transit buses increasingly wheelchair-accessible. Post-secondary students attending the University of Western Ontario and Fanshawe College now receive a subsidized bus pass incorporated into their tuition.

In 2020, after a period of increasing ridership, ridership decreased due to the COVID-19 pandemic, cutting jobs for drivers and reducing service in areas with low ridership to match the decreased demand.[15][16] During the first months of the pandemic beginning in March 2020, passengers were required to board and exit from the rear door and the collection of fares was suspended as a result, though people with accessibility needs could still board and exit at the front of the bus.[17] Fare collection and boarding via the front door were resumed in August 2020.[18][19]

Between 2024 and 2025, yearly ridership dropped by 9% (1.77 million rides), owing in large part to the decrease in international students (who have university and college bus passes) due to a change in federal policy.[20] The LTC's 2025 annual report noted that rides per capita have continually decreased year over year, indicating that service growth has not kept pace with the city's population growth, which the report called "problematic", as many routes experience crowding.

Routes

[edit]

Regular routes

[edit]

Buses serving these routes stop at blue bus-stop signs. The bus destination signs display the route number "to" a destination "via" a street or neighbourhood. These routes are up to date as of April 11, 2026.

RouteTerminusTerminusViaServiceScheduleNotes
1ANKipps LaneSPond MillsWellington & DundasDailyRoute 1 Effective February 1 2026
1BNKipps LaneSKing EdwardWellington & DundasDailyRoute 1 Effective February 1 2026
2AWNatural ScienceETrafalgar HeightsHale & TrafalgarDailyRoute 2 Effective February 1 2026Route 2A is on detour until further notice due to BRT work on Dundas between Egerton and Highbury.
2BWNatural ScienceEBonaventureDundas StreetDailyRoute 2 Effective February 1 2026Route 2B is on detour until further notice due to BRT work on Dundas between Egerton and Highbury.
3WDowntownEArgyle MallHamilton RoadDailyRoute 3 Effective June 22 2025
4ANFanshawe CollegeSWhite Oaks MallDowntownDailyRoute 4 Effective November 23 2025Schedule adherence concerns due to construction impacts May 3 - September 6. Route 4A is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
4BNFanshawe CollegeSWhite Oaks MallDowntownDailyRoute 4 Effective November 23 2025Schedule adherence concerns due to construction impacts May 3 - September 6. Route 4A is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
5AWByronEArgyle MallSpringbank Drive/DowntownDailyRoute 5 Effective February 1 2026
5BWByronEArgyle MallGardenwood Drive/DowntownMonday - SaturdayRoute 5 Effective February 1 2026
6NUniversity HospitalSParkwood InstituteRichmond StreetDailyRoute 6 Effective June 25 2023
7WWestmount MallEArgyle MallDowntown/York StreetDailyRoute 7 Effective February 1 2026Route 7 is on detour until further notice due to road revitalization work on York between Colborne and Wellington.
9NFanshawe & WonderlandSDowntownLimberlostDailyRoute 9 Effective February 1 2026
10WMasonville MallEHuron & BarkerWonderland & HighburyDailyRoute 10 Effective November 23 2025Schedule adherence concerns due to construction impacts May 3 - September 6.
12SWharncliffe & WonderlandNDowntownWharncliffe RoadDailyRoute 12 Effective February 1 2026
13NMasonville MallSWhite Oaks MallRichmond & WellingtonDailyRoute 13 Effective February 1 2026Schedule adherence concerns due to construction impacts May 3 - September 6.
13ANMasonville MallSWhite Oaks MallWellington, Richmond & Westminster ParkDailyRoute 13 Effective February 1 2026Schedule adherence concerns due to construction impacts May 3 - September 6.
15AWDalhousieEHuron HeightsDowntownDailyRoute 15 Effective November 24 2024
15BWCranbrook & CommissionersEHuron HeightsDowntownDailyRoute 15 Effective November 24 2024
16NMasonville MallSPond MillsAdelaide StreetDailyRoute 16 Effective May 3 2026
17AWByronEArgyle MallOxford StreetDailyRoute 17 Effective August 31, 2025Schedule adherence concerns due to construction impacts May 3 - September 6. Route 17A is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
17BWRiverbendEArgyle MallOxford StreetMonday - Friday.Route 17 Effective August 31, 2025Schedule adherence concerns due to construction impacts May 3 - September 6. Route 17B is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
19SDowntownNStoney CreekHyde Park RoadDailyRoute 19 Effective June 22 2025
20WBeaverbrookEFanshawe CollegeDowntownDailyRoute 20 Effective February 1 2026Schedule adherence concerns due to construction impacts May 3 - September 6. Route 20 is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
24WTalbot VillageESummersideCommissioners RoadDailyRoute 24 Effective November 23 2025Schedule adherence concerns due to construction impacts May 3 - September 6.
25WMasonville MallEFanshawe CollegeFanshawe Park RoadDailyRoute 25 Effective April 27 2025Route 25 is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
27WCapulet LaneEFanshawe CollegeWestern UniversityDailyRoute 27 Effective May 3 2026Route 27 is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
28WLambethEWhite Oaks MallExeter RoadMonday - Friday, Peak Periods only.Route 28 Effective September 2 2025
30WWhite Oaks MallECheese Factory RoadNewbold & Wilton Grove RoadMonday - Friday, Peak Period & Late Evening service onlyRoute 30 Effective February 1 2026
31WHyde Park Power CentreEAlumni HallAldersbrook RoadDailyRoute 31 Effective June 23 2025
33WProudfootEAlumni HallPlatt's LaneMonday - FridayRoute 33 Effective May 3 2026
34CWMasonville MallCCWMasonville MallNorthridge & AmblesideDailyRoute 34 Effective February 1 2026
35NArgyle MallSTrafalgar HeightsMarconi BoulevardDailyRoute 35 Effective June 25 2023
36WFanshawe CollegeELondon AirportOxford StreetMonday - FridayRoute 36 Effective February 1 2026Schedule adherence concerns due to construction impacts May 3 - September 6. Route 36 is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
36AWFanshawe CollegeELondon AirportHuron and Robins HillMonday - FridayRoute 36 Effective February 1 2026Schedule adherence concerns due to construction impacts May 3 - September 6. Route 36A is on detour until further notice due to BRT work on Oxford blocking the Fanshawe College Terminal entrance.
37NArgyle MallSNeptune CrescentSovereign RoadMonday - Friday Peak Periods onlyRoute 37 Effective April 30 2023
38NArgyle MallSInnovation ParkClarke RoadMonday - Friday Peak Periods and Late Evening service only.Route 38 Effective June 25 2023
111 Temporary Construction ConnectorWFanshawe College Temporary StopSMornington Avenue and Curry StreetHighburyDailySchedule Effective May 3 2026

Express routes

[edit]

These routes are limited-stop service. Buses on Routes 90, 91, 92, 94 and 95 stop only at express bus stops, which have orange bus-stop signs. Buses on Route 93 provide express service (at orange-signed stops only) north of Wharncliffe & Highview and local service (at blue-signed stops) south of Wharncliffe & Highview.

RouteTerminusTerminusViaServiceScheduleNotes
90NMasonville MallSWhite Oaks MallDowntownDailyRoute 90 Effective August 31 2025Schedule adherence concerns due to construction impacts.
91WOxford & WonderlandEFanshawe CollegeOxford StreetDailyRoute 91 Effective June 25 2023Schedule adherence concerns due to construction impacts.
92NMasonville MallSVictoria HospitalAdelaide StreetMonday - Friday, Peak Periods only.Route 92 Effective November 23 2025
93NMasonville MallSWhite Oaks MallWharncliffe/WesternDailyRoute 93 Effective May 3 2026
94WNatural ScienceEArgyle MallDundas StreetMonday - Friday, Peak Periods only.Effective November 23 2025Route 94 is on detour until further notice due to BRT work on Dundas between Egerton and Highbury.
95SWhite Oaks MallNFanshawe CollegeHighburyMonday - Friday, Peak Periods only.Route 95 Effective November 23 2025 - May 2 2026Route 95 Suspended between May 3 - September 5 2026.

Community routes

[edit]

Community routes operate to provide special access to seniors and individuals with impaired mobility to major shopping destinations. They are not designed as an alternative to the Paratransit service. Routes 51 through 55 operate on this schedule. Route 56 operates on this schedule.

RouteTerminusTerminusServiceMajor Destinations
51WWestmount MallECherryhill Village MallMondayCherryhill Circle, Forest Hill
52WOakridge Superstore PlazaECherryhill Village MallTuesdayCherryhill Circle, Forest Hill
53WHyde Park Power CentreECherryhill Village MallWednesdayCherryhill Circle, Forest Hill
54WCostco at Farrah RoadECherryhill Village MallThursdayCherryhill Circle, Forest Hill
55NMasonville MallSCherryhill Village MallFridayCherryhill Circle, Forest Hill
56NWilliam Mercer Wilson CentreSWhite Oaks Mall (east side)WednesdayWonderland at Commissioners, Montgomery at Southdale

Western University and Fanshawe College routes (September - April only)

[edit]
RouteTerminusViaTerminusViaServiceScheduleNotes
102NNatural ScienceWharncliffe RoadSDowntownRichmond StreetDailyRoute 102 Effective August 31 2025 - May 2 2026
104NFanshawe CollegeOxford StreetSDowntownOxford StreetMonday - SaturdayRoute 104 Effective August 31 2025 - May 2 2026
106NNatural ScienceRichmond StreetSDowntownWharncliffe RoadDailyRoute 106 Effective August 2025 - May 2 2026
127ENatural ScienceWestern RoadWCapulet LaneSarnia RoadDailyRoute 127 Effective August 31 2025 - May 2 2026

See also

[edit]

References

[edit]
  1. 1 2 https://www.londontransit.ca/plan-a-trip/schedules/
  2. 1 2 "2025 Conventional Transit Service Performance". London Transit Commission. April 7, 2026. Retrieved 10 April 2026.
  3. "Bus rapid transit: The latest on construction, expected completion date". lfpress. Archived from the original on 2024-12-18.
  4. 1 2 3 4 5 6 7 "LTC History – London Transit Commission".
  5. "London Street Railway streetcars being pulled to barns, London, Ontario".
  6. Wyatt, David. "Transit History of London, Ontario". All-Time List of Canadian Transit Systems. Retrieved 4 May 2016.
  7. Dubinski, Kate (2009-11-18). "UWO shuttle bus service rapped". London Free Press.
  8. "Striking workers reject offer | London | News | London Free Press". Archived from the original on 2009-12-21.
  9. Maloney, Patrick (2009-12-15). "Bus strike's over". London Free Press.
  10. "London Transit partners with MagnusCards to make conventional bus service more accessible - London | Globalnews.ca". 980 CFPL. Retrieved 2021-11-16.
  11. City of London (3 May 2017). "Shift Rapid Transit Public Participation Meeting" (PDF). Retrieved 15 January 2018.
  12. "Rapid Transit | City of London". london.ca.
  13. "London, Ont. hits major milestone with first bus rapid transit shelter - London | Globalnews.ca". Global News.
  14. "Bus rapid transit: The latest on construction, expected completion date". lfpress. Archived from the original on 2024-12-18.
  15. "London Transit Commission outlines service reductions beginning April 19 amid COVID-19 pandemic". 980 CFPL. Retrieved 2021-05-06.
  16. "LTC warns of disruptions as schedules change due to decreased resources amid COVID-19 pandemic". 980 CFPL. Retrieved 2021-05-06.
  17. "Coronavirus: Get on the bus through the rear doors, London, Ont". 980 CFPL. Retrieved 2021-05-06.
  18. "Fare collection, front door boarding to start Aug. 19: London Transit Commission". 980 CFPL. Retrieved 2021-05-06.
  19. "London Transit Commission bringing back fare collection, front door boarding". 980 CFPL. Retrieved 2021-05-06.
  20. "London Transit annual ridership plummets according to annual data". 980 CFPL. Retrieved 2026-04-10.
[edit]