Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a4661f99cbec1b3f

Jump to content

// Workers AI · dad joke modeWhat did Line 7 say to Line 8? You're always one line behind.

From Wikipedia, the free encyclopedia
Line 7
Zilu station platform, towards Feicui Gongyuan
Overview
StatusIn operation
OwnerHefei Metro
LocaleHefei, Anhui, China
Termini
Stations16 (14 in operation) (Phase 1)[2][1]
Service
TypeRapid transit
SystemHefei Metro
OperatorHefei Metro
DepotYicheng depot
History
Opened1 July 2026; 3 months ago (2026-07-01) [2]
Technical
Line length18.85 km (11.71 mi) [3]
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1,500 V DC Overhead catenary contact
Operating speed80 km/h (50 mph) (Maximum design speed)

Line 7 of Hefei Metro (Chinese: 合肥轨道交通7号线) is a metro line in Hefei, Anhui province, China. It commenced operation at 10:00 am on 1 July 2026.[2] In the first phase, 14 stations will be put into operation (except the under construction Hefei Sizhong station and Yicheng station, so are unopened).[1] The estimated construction time is 48 months, with total investment of 5.249 billion RMB.[4]

History

[edit]

On 5 November 2020, Anhui Provincial Development and Reform Commission was approved the feasibility study report for Phase I Line 7.[3]

On 30 November 2020, Line 7 began construction.[4]

On 1 February 2026, Line 7 and Line S1 began trial operation without passengers.[5]

From 19 June to 24 June 2026, Line 7 opened trial ride activity for the public with unlimited rides for free.[6]

Line 7 was opened at 10:00 am on 1 July 2026.[2][1]

Stations

[edit]
Station name Transfer Distance
km
Location
English Chinese
Feicui Gongyuan翡翠公园Shushan District
Fanhua Dadao繁华大道 3 
Huiyuan徽园
Mingzhu Guangchang明珠广场
Tiandu Lu天都路
Nanyanhubei南艳湖北
Yiliuba Zhongxue一六八中学
Hefei Daxue合肥大学
Nanyanhunan南艳湖南
Yaosu Dashichang要素大市场Baohe District
Binhu Yiyuan滨湖医院
Zilu紫庐 1 
Songshan Lu嵩山路
Sheng Wenhuahefeiyiguan省文化和非遗馆
Yicheng义城 5 
Hefei Sizhong合肥四中

References

[edit]
  1. 1 2 3 4 "合肥地铁7号线一期7月1日正式开通初期运营". 30 June 2026.
  2. 1 2 3 4 "合肥轨道7号线一期明日正式开通初期运营!". 30 June 2026.
  3. 1 2 "合肥地铁7号线一期工程可行性研究报告获得批复". Retrieved 6 November 2020.
  4. 1 2 "合肥市轨道交通7号线实现全线洞通". 30 November 2023.
  5. ↑ "合肥轨道7号线一期、新桥机场S1线,今起空载试运行". 1 February 2026.
  6. ↑ "合肥地铁7号线一期免费试乘定了!多条公交接驳专线同步开启". 18 June 2026.