Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a273f7642df63e6e

Jump to content

// Workers AI · dad joke modeWhy did Lied Place Residences go to therapy? It had a lot of lying issues.

From Wikipedia, the free encyclopedia

Lied Place Residences
Lied Place Residences in 2025
Map
Interactive map of the Lied Place Residences area
General information
LocationLincoln, Nebraska, U.S.
Coordinates40°48′57″N 96°42′18″W / 40.81573356870102°N 96.70486572318383°W / 40.81573356870102; -96.70486572318383
Construction started
2019
Completed
2022
Height
Roof257 ft (78 m)
Technical details
Floor count20
Other information
Public transit
Bus transport StarTran

Lied Place Residences (often shortened to Lied Place) is a 257-foot (78 m) residential high-rise in Lincoln, Nebraska, United States. It is the second-tallest building in Lincoln, only surpassed by the Nebraska State Capitol. Originally slated to be completed in early 2021, the building opened in February 2022.

History

[edit]

In October 2018, a residential high-rise building was announced to be built in Downtown Lincoln.[1] The building would succeed a former Applebee's, which closed in December 2013.[2][3] The Lincoln Urban Design Committee approved of the project in 2018.[4] The former Applebee's was demolished in the summer of 2019.[5]

Ground was broken in September 2019, and construction began soon after.[6][7] During construction in December 2019, a man died after metal forms fell onto him.[8] The building was originally intended to open in early 2021. However, due to issues with ordering components during the COVID-19 pandemic. Residents began moving in during February 2022.[9][10]

References

[edit]
  1. "Proposed tower would be Lincoln's 2nd-tallest building". Lincoln Journal Star. October 26, 2018. pp. A1. Retrieved June 19, 2025.
  2. "Plans moving forward for 20-story building in downtown Lincoln". 1011 Now. January 8, 2019. Retrieved April 26, 2022.
  3. Newspapers, MATT OLBERDING Lee. "Proposed Lied Place skyscraper would take lane from Q Street". Fremont Tribune. Retrieved April 26, 2022.
  4. "Plan for Lincoln skyscraper OK'd". Fremont Tribune. November 8, 2018. pp. A6. Retrieved June 19, 2025.
  5. "DEMOLITION BEGINS". Lincoln Journal Star. June 13, 2019. pp. A6. Retrieved June 19, 2025.
  6. "Lied Place will rise rapidly". Lincoln Journal Star. September 26, 2019. pp. A3. Retrieved June 19, 2025.
  7. "Lied Place Residences ground-breaking Wednesday". KLKN-TV. September 25, 2019. Retrieved April 26, 2022.
  8. "Police identify man killed in construction accident". 1011now. December 20, 2019. Retrieved June 19, 2025.
  9. Olberding, Matt. "Directions 2022: Downtown apartment, condo projects nearing completion". JournalStar.com. Retrieved April 26, 2022.
  10. "Lincoln's Second-Tallest Tower Rises on Site of Demolished Restaurant". March 31, 2023.