Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a266bd7a7c34df63

Jump to content

// Workers AI · dad joke modeWhy did Lane Avenue Bridge go to therapy? It had a lot of spanned emotions.

Lane Avenue Bridge
Lane Avenue Bridge in October 2024
Coordinates40°00′23″N 83°01′19″W / 40.006500°N 83.02200°W / 40.006500; -83.02200
CarriesLane Avenue
CrossesOlentangy River
LocaleColumbus, Ohio, USA
Maintained byFranklin County Engineer
Characteristics
DesignCable stayed
Total length370 ft (113 m)
Piers in water
1
No. of lanes4 westbound, 2 eastbound
History
DesignerJones-Stuckey Ltd., Civil Engineering Firm, Columbus, Ohio
Construction start2002
Construction end2003
OpenedNovember 14, 2003
Location
Map
Interactive map outlining the Lane Avenue Bridge

The Lane Avenue Bridge is a cable-stayed bridge over the Olentangy River in the American city of Columbus, Ohio. Designed by Jones-Stuckey Ltd., the construction was completed on November 14, 2003. The bridge is 113 meters (371 feet) in length, carrying six 3.5 meters (11 feet) wide lanes for vehicle traffic, as well as two 3.5 meter sidewalks. The cable stayed design was chosen for aesthetic reasons, as well as having a smaller potential for environmental degradation on the river environment. The anchorages for the cables, at 47 tons (104,000 lbs),[1] are noted as being the heaviest single pieces of steel ever to be galvanized. Total price for the project was US$15.6 million with the following funding sources:

Previously, traffic on Lane Avenue was carried by a three-lane earth-filled arch bridge, which opened in 1919. By 1998, it was determined that the bridge was deteriorating; thus a replacement was needed. Construction on the new bridge started on February 27, 2002, with the old bridge being demolished on November 25 of the same year, after the final home football game at Ohio Stadium, nearby.

References

[edit]

Further reading

[edit]
  • "Lane Avenue Bridge Story". Franklin County Engineer's Office.
  • Sherman, Mark (2001). "Effective Use of Public Involvement to Achieve Aesthetic Quality in Bridge Design". Transportation Research Record. 1770: 181–7. doi:10.3141/1770-23. S2CID 111216701.
[edit]

Wikimedia Commons logo Media related to Lane Avenue Bridge at Wikimedia Commons