Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a4049a4faea0f3c9

Jump to content

Kinects

Kinects
Kinects is located in Downtown Seattle
Kinects
Location within Downtown Seattle
General information
StatusCompleted
TypeResidential
Location1823 Minor Avenue
Seattle, Washington
Coordinates47°37′01.39″N 122°19′53.44″W / 47.6170528°N 122.3315111°W / 47.6170528; -122.3315111
Construction started
2015
Topped-out2016
Completed
July 2017
Cost$150 million[1]
Height
Height440 feet (130 m)
Technical details
Floor count40
Design and construction
Architecture firm
Bumgardner
DeveloperSecurity Properties
Structural engineer
Cary Kopczynski & Company
Main contractorAndersen Construction
Other information
Number of units357 apartments
Parking350 spaces
References
[2][3]

Kinects is a residential building in the Denny Triangle neighborhood of Seattle, Washington. The 440-foot-tall (130 m), 40-story tower has 357 apartments and a 3,500-square-foot (330 m2) restaurant at its base.[2][3][4] It was completed in July 2017, after two years of construction.[5] The building is located along Minor Avenue between Stewart and Howell streets, on the same block as the under construction AMLI Arc and Tilt 49 complex.

The building is wedge-shaped, with the upper floors flaring out on three sides by 6 inches (150 mm) per floor. It features a rooftop swimming pool and other amenities, including a 20-foot (6.1 m) hemlock tree.[6][7]

The tower was originally approved for construction in 2008 and was to break ground the following year,[8] but was put on hold during the Great Recession. Developer Security Properties revived the project in 2014 and began construction in February 2015.[9][10] It was completed in July 2017.

References

[edit]
  1. ↑ Rosenberg, Mike (March 10, 2017). "Record construction frenzy sweeps downtown Seattle; more building to come". The Seattle Times. Retrieved March 27, 2017.
  2. 1 2 "Emporis building ID 304543". Emporis. Archived from the original on April 22, 2016.
  3. 1 2 "Kinects Tower". Bumgardner. Retrieved May 8, 2016.
  4. ↑ Payne, Patti (September 21, 2016). "First look at the $150 million Kinects apartment tower in Denny Triangle". Puget Sound Business Journal. Retrieved September 21, 2016.
  5. ↑ "Kinects tower ready for new residents". Seattle Daily Journal of Commerce. July 14, 2017. Retrieved July 20, 2017.
  6. ↑ Stiles, Marc (June 10, 2015). "What if they built a 40-story tower in Seattle and no one noticed? (slideshow)". Puget Sound Business Journal. Retrieved May 8, 2016.
  7. ↑ Marasco, John; Ferzli, Joe; Simpson, Mark (October 26, 2017). "After 10-year engagement, Kinects inverts 'wedding cake'". Seattle Daily Journal of Commerce. Retrieved October 27, 2017.
  8. ↑ "Denny Triangle tower approved". The Seattle Times. May 16, 2008. Retrieved May 8, 2016.
  9. ↑ Stiles, Marc (October 13, 2014). "That Seattle apartment tower you've never heard of (or had forgotten about) could be revived". Puget Sound Business Journal. Retrieved May 8, 2016.
  10. ↑ "41-story tower starts today on Minor Ave". Seattle Daily Journal of Commerce. February 2, 2015. Retrieved May 8, 2016.