Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23d1f69d89926b9

Jump to content

// Workers AI · dad joke modeWhat did the Heavy Water say? It's a heavy topic.

From Wikipedia, the free encyclopedia
Heavy Water Components Test Reactor
Heavy Water Components Test Reactor
Operating institution
Savannah River Site
LocationAiken, South Carolina
TypeHeavy Water
Power70 (thermal)
Construction and upkeep
Construction began
1958
First criticality1962
Technical specifications
CoolingHeavy water
Heavy water

Heavy Water Components Test Reactor (HWCTR) was an experimental nuclear reactor at the Savannah River Site in Aiken County, South Carolina. It was commonly called "Hector."

History

[edit]

It was constructed in 1958, starting in a temporary construction area, which is now called "B" Area. This is near the intersection of SRS roads "2" and "C." It is identified as Building 770-U. It has a cylindrical structure with a hemispherical dome. Its diameter is 70 ft (21.3 m) with a height of 125 ft (38.1 m). About 60 ft (18.3 m) is located underground. The building was designed to contain an internal pressure of 24 psig (165 kPa). It had a 70 MW thermal output.

It was built to test the concept of a heavy water moderated and cooled reactor for civilian power. It was tested from late 1962 to December 1964.[1] It was not restarted. The fuel was removed and the facility was secured by 1971. All auxiliary buildings were removed. The reactor building awaits its final disposition.[2][3]

During deactivation activities at the HWCTR in 2010, an unanticipated high dose was experienced during the removal of wire flux monitor cabling. On November 2, 2010, when work was in progress to remove the instrumentation, one of three small helium-filled ion chambers was removed from the instrumentation sleeve. A higher than expected dose rate was detected when the lowest of the three ion chambers exited the reactor vessel below the lower axial shield. As a result, three workers received whole body doses of 2.52 mREM, 2.7 mREM, and 5.6 mREM, which is equal to 1.5–3.3 average daily human exposures in the United States.[4]

References

[edit]
  1. Savannah River Site at 50 HWCTR is described on pp. 353–355.
  2. Savannah River Site Long-Term Stewardship Report Archived 2006-09-26 at the Wayback Machine Status of decommissioning.
  3. "SRS Citizen Advisory Board Recommendation No. 44" (PDF). Archived (PDF) from the original on 2017-02-17. Retrieved 2007-03-25.
  4. Unanticipated, High Dose During the Removal of Wire Flux Monitor Cabling from the HWCTR Reactor Vessel (D&D KM-IT Lessons Learned)