Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a40d48642eae22ce

Jump to content

// Workers AI · dad joke modeWhat did Hawaiki Cable say to the ocean? You're hooked on me.

From Wikipedia, the free encyclopedia

Hawaiki Cable
Cable typeFibre-optic
Construction beginningSeptember 2017
Construction finishedApril 2018
First trafficJuly 2018
Design capacity43.8 Tbps
Built byTE SubCom
Landing points
Owner(s)BW Digital

Hawaiki Cable is a 15,000 km fibre-optic submarine communications cable that entered service in July 2018, linking Australia, New Zealand and the United States with branches to American Samoa, New Caledonia and Tonga. The cable has three fibre pairs across its main segments, and had an initial design capacity of 43.8 terabits per second.[1]

Hawaiki Cable is owned and operated by BW Digital.

History

[edit]

Hawaiki Cable was founded by former Alcatel-Lucent executive Remi Galasso, who announced the project at the 2012 Pacific Islands Forum in Rarotonga. The original cable design provided a 30Tbps link from Auckland to Hawaii, with branches to Sydney and seven Pacific Islands including American Samoa, New Caledonia, Norfolk Island, Wallis, and an expected completion in late 2014.[2]

In August 2013, TPG Telecom committed to 3Tbps of capacity on the cable.[3] In October 2013, iiNet also committed to 3Tbps of capacity.[4]

In July 2014, REANNZ signed an 25-year anchor tenancy contract for capacity on the cable.[5]

Despite pre-commitments for capacity, the cable struggled to obtain financing and in September 2015 the project sought US$150million in investment to commence construction. Total construction costs were estimated to be approximately US$300 million.[6]

In April 2016, Hawaiki Cable announced that project funding had been secured and that the construction contract between with TE SubCom had come into force. Construction was expected to be completed by mid-2018.[7][8] The landing point in Sydney would be provided by Equinix and the landing point at Pacific City to be connected to Hillsboro.[9]

Manufacturing of the cable was completed in September 2017. The final design of the cable removed the direct Sydney to Auckland link, with the cable instead originating at Sydney and having a trunk link to Mangawhai Heads. A spur was included to link American Samoa, and branching units were pre-installed to allow for later connections to New Caledonia, Fiji, and Tonga.[10] Marine operations commenced in November 2017 with cable ships CS Responder installing the Southern leg from Sydney to Hawaii, and CS Global Sentinel installing the Northern leg from Hawaii to Oregon.[11][12]

The final landing of the cable was completed on 23 April 2018[13], and commercial operations commenced on 19 July.[1]

By June 2020, the cable design capacity had been increased to 67 Tbps.[14]

On 27 July 2021, Hawaiki Cable was sold to BW Digital.[15] The sale was formally completed on 16 May 2022.[16]

On 10 January 2024, BW Digital and Ciena announced the availability of 400GbE services on the cable.[17]

On 30 May 2025, BW Digital and Ciena announced that the cable had achieved 1.2 Tbit/s of transmission per wavelength between Hawaii and Oregon.[18]

Branches

[edit]

Tomoo Cable

[edit]

On 2 December 2019, Hawaiki signed a contract with Société Calédonienne de Connectivité Internationale (SCCI) to construct and install a 700km branch to New Caledonia. To be operated by SCCI, Tomoo Cable included connections to both Grande Terre and Isle of Pines.[19][20]

Tuʻi Vavaʻu

[edit]

On 21 June 2024, BW Digital announced construction of the 405km Tonga Hawaiki Branch System, which would connect Tonga to the Hawaiki Cable. The new cable would provide a second link to Tonga, in addition to the Tonga Cable System between Tonga and Fuji, with the US$32 million cost being jointly funded by Australian Department of Foreign Affairs and Trade and Government of New Zealand.[21]

The cable was renamed to Tuʻi Vavaʻu and commissioned on 26 May 2026.[22][23]

Landing Points

[edit]
  1. Equinix SY4, Alexandria, Sydney, New South Wales, Australia
  2. Mangawhai Heads, New Zealand
  3. Grande Terre, New Caledonia
  4. Isle of Pines, New Caledonia
  5. Vavaʻu, Tonga
  6. Kapolei, Hawaii
  7. Pacific City, Oregon, United States

See also

[edit]

References

[edit]
  1. 1 2 Reichert, Corinne (19 July 2018). "Hawaiki subsea cable goes live". ZDnet. Retrieved 20 September 2026.
  2. ↑ Reeves, Rachel (30 August 2012). "New fibre optic plan on table for Pacific countries at Forum". Pacific Scoop. Retrieved 20 September 2026.
  3. ↑ Taylor, Josh (19 August 2013). "TPG invests in Australia-US subsea cable capacity". ZDnet. Retrieved 20 September 2026.
  4. ↑ Duckett, Chris (2 October 2013). "iiNet signs up for Hawaiki cable capacity". ZDnet. Retrieved 20 September 2026.
  5. ↑ Adams, Amy; Joyce, Steven (2 July 2014). "Govt signs $65 million contract on new international cable". Beehive.govt.nz. Retrieved 20 September 2026.
  6. ↑ Ramli, David (15 September 2015). "Hawaiki hunts for $US150 million to build submarine cable to the US". The Sydney Morning Herald. Retrieved 20 September 2026.
  7. ↑ Ryan, Sophie (1 April 2016). "Hawaiki Cable secures funding: Could this be the end of data caps?". The New Zealand Herald. Retrieved 20 September 2026.
  8. ↑ Reichert, Corinne (31 March 2016). "Hawaiki 30Tbps trans-pacific subsea cable commences construction". ZDnet. Retrieved 20 September 2026.
  9. ↑ Saarinen, Juha (1 April 2016). "Hawaiki ANZ-US subsea cable gets green light". iTnews. Retrieved 20 September 2026.
  10. ↑ "HAWAIKI TRANSPACIFIC CABLE SYSTEM READY FOR INSTALLATION" (PDF). TE SubCom. 25 September 2017. Retrieved 20 September 2026.
  11. ↑ Qiu, Winston (9 November 2017). "Hawaiki Cable Starts Cable Laying in Sydney". Submarine Cable Networks. Retrieved 20 September 2026.
  12. ↑ Powell, Rob (25 September 2017). "Hawaiki Prepares to Kick Off Installation Phase". Telecom Ramblings. Retrieved 20 September 2026.
  13. ↑ Reichert, Corinne (23 April 2018). "Hawaiki cable rollout completes". ZDnet. Retrieved 20 September 2026.
  14. ↑ Lavalee, Brian (15 June 2020). "Hawaiki: from canoes to connected broadband in the Pacific". Ciena Corporation. Retrieved 20 September 2026.
  15. ↑ "Hawaiki announces the sale of Hawaiki Submarine Cable to BW Group". BW Group. 27 July 2021. Retrieved 20 September 2026.
  16. ↑ "BW Digital completes acquisition of Hawaiki Submarine Cable". BW Group. 16 May 2022. Retrieved 20 September 2026.
  17. ↑ "Hawaiki Offers 400GbE Services Enabled by Ciena". Ciena Corporation. 10 January 2024. Retrieved 20 September 2026.
  18. ↑ "Hawaiki Clocks New Speed Record with Ciena's WaveLogic 6 Extreme". Ciena Corporation. 30 May 2025. Retrieved 20 September 2026.
  19. ↑ "New Caledonia to Link to Hawaiki Cable". Offshore Energy. 2 December 2019. Retrieved 20 September 2026.
  20. ↑ Qiu, Winston (9 December 2019). "Hawaiki Cable Adds Branch to New Caledonia - Tomoo Cable". Submarine Cable Networks. Retrieved 20 September 2026.
  21. ↑ Qiu, Winston (21 June 2024). "Australian and New Zealand Governments to Fund Tonga Hawaiki Branch System". Submarine Cable Networks. Retrieved 20 September 2026.
  22. ↑ "Tonga's second international cable officially launched". Australian Infrastructure Financing Facility for the Pacific. 26 May 2026. Retrieved 20 September 2026.
  23. ↑ "Second international undersea cable, 'Tu'i Vava'u', launched in landmark ceremony". Kaniva Tonga. 28 May 2026. Retrieved 20 September 2026.