Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a43e499d5bcc332c

Jump to content

Greenlink

From Wikipedia, the free encyclopedia
Greenlink Interconnector[1]
Map
County Wexford, Ireland and Pembrokeshire, Wales
Location
CountryIreland, United Kingdom
General directioneast-west
FromIreland
Passes throughSt George's Channel
ToWales
Construction information
Commissioned29 January 2025
Technical information
TypeSubmarine cable
Current typeHVDC
Total length190 km (120 mi)
Capacity500 MW
AC voltage400 kV (UK); 220 kV (Ireland)
DC voltage320 kV

Greenlink is a 190 km long 500 MW high-voltage direct current (HVDC) submarine power cable between County Wexford in Ireland and Pembrokeshire in Wales.[2]

Route

[edit]

The cable runs between EirGrid's Great Island substation in County Wexford, and National Grid's Pembroke substation in Pembrokeshire, with the cable making landfall at Baginbun Beach near Fethard-on-Sea in Ireland and at Freshwater West beach near Castlemartin in Wales. The total length is 200 km (120 miles), of which 160 km (100 miles) is under the sea.[3][1][4]

Specification

[edit]

The HVDC link is configured as a symmetrical monopole, with DC voltages of ±320 kV, and nominal power rating of 500 MW. The project is expected to cost €400 million.[1]

Project history

[edit]

Subsea surveys were undertaken in 2018, and public consultations in 2019.[3]

In 2026 it was widely reported that during the project design phase, the landfall at Freshwater West beach in Pembrokeshire had to be re-routed to avoid the fictional grave of Dobby the House Elf from the Harry Potter films.[5] [6]

In April 2020, the Greenlink Interconnector Limited submitted three planning applications for onshore construction in Wales.[7] The project still required planning permission and marine licences in both the United Kingdom and in Ireland, but the process of procuring construction contracts had started.[8][3]

In March 2021, the project was granted a licence to install the sea cable in UK waters, with a similar licence for Irish waters still pending. As of March 2021, commissioning of the interconnector was planned for the end of 2023.[9]

In January 2022, construction work on converter stations started.[10] In March 2022, the company announced that it had reached financial close,[11] and offshore construction commenced in May 2022.[10] Construction and trial operation was completed in August 2024,[12] with testing of the link commencing in December 2024 and full operations beginning on 29 January 2025.[13] The link was officially launched in April 2025.[14]

See also

[edit]

References

[edit]
  1. 1 2 3 "Greenlink Interconnector". 4Coffshore. Retrieved 24 October 2019.
  2. ↑ "Greenlink Interconnector reaches financial close". greenlink.ie (Press release). 2022-03-21. Retrieved 2023-09-07.
  3. ↑ "TEN-E Regulation Information Brochure Issue 3" (PDF). Greenlink. June 2019. Retrieved 11 November 2019.
  4. ↑ Andy Gourlay; Paul Pigott (9 August 2026). "Harry Potter fans force diversion of UK-Ireland power link to avoid Dobby's grave". BBC News - Wales. BBC. Retrieved 10 August 2026.
  5. ↑ Helena Horton (10 August 2026). "Harry Potter fans force relocation of £430m undersea cable to avoid Dobby's 'grave'". News. The Guardian. Retrieved 13 August 2026.
  6. ↑ Connolly, Philip (17 March 2019). "Element Power's Greenlink interconnector energises Partners Group". The Sunday Times. London. Retrieved 24 October 2019.
  7. ↑ Russell, Tom (2021-03-03). "Greenlink gets the greenlight from Natural Resources Wales". coffshore.com. Retrieved 2021-03-04.
  8. 1 2 "Construction begins on converter station for €400m Greenlink Interconnector". 2022-02-02. Retrieved 2022-03-19.
  9. ↑ "James O'Reilly on LinkedIn: #greenlink #siemensenergy #sumitomoelectric #wsp | 95 comments". www.linkedin.com. Retrieved 2025-02-02.
  10. ↑ Lee, George (2025-04-16). "Ireland-Wales electricity interconnector up and running". RTÉ. Retrieved 2025-04-27.