Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a240d1332ce06102

Jump to content

// Workers AI · dad joke modeWhat did Green Jade say? "I'm jade-ing you.

From Wikipedia, the free encyclopedia

Green Jade is a crane vessel built to support the offshore wind industry.

Design

[edit]

Green Jade is 216.5 metres (710 ft 4 in) long, 49 metres (160 ft 9 in) wide. Its main crane capacity is 4,000 tonnes (3,900 long tons; 4,400 short tons). Crew accommodations are for up to 160.[1] The main crane was made by Huisman Equipment.[2]

Naming

[edit]

Green Jade is named after Yu Shan, the tallest mountain in Taiwan.[3]

History

[edit]

Green Jade was built at CSBC Corporation, Taiwan's Kaohsiung yard.[1] First steel was cut in September 2020[4] and the keel was laid in March 2021.[5]

Green Jade's launching in April 2022 was attended by Taiwanese Premier Su Tseng-chang. At the time of its launching it was the second largest vessel of its kind in the world.[1] Green Jade is owned by CSBC-DEME Wind Engineering Co.[1]

Green Jade was involved in the installation of the Hai Long offshore wind farm.[6]

In 2024 multinational Wärtsilä entered into an operating agreement for the Green Jade with its owners.[7]

See also

[edit]

References

[edit]
  1. 1 2 3 4 Cheng-hui, Chen. "Taiwan launches giant wind power installation ship". taipeitimes.com. Taipei Times. Retrieved 4 April 2022.
  2. Durakovic, Adnan. "Green Jade Launches in Taiwan, Delivery Pushed to 2023". offshorewind.biz. Offshore Wind. Retrieved 4 April 2022.
  3. yi-ning, Tseng; Lo, James. "First Taiwan-built offshore wind installation vessel launched". focustaiwan.tw. Focus Taiwan. Retrieved 4 April 2022.
  4. "First steel cut for Green Jade". offshore-mag.com. Offshore Magazine. Retrieved 4 April 2022.
  5. "Back to overview Keel Laid for Green Jade". offshorewind.biz. Offshore Wind. Retrieved 4 April 2022.
  6. Buljan, Adrijana. "TWD, Seatools Outfit Green Jade for Hai Long Piling Work". offshorewind.biz. Offshore Wind Magazine. Retrieved 26 July 2024.
  7. "Wärtsilä Lifecycle Agreement for Installation Vessel Green Jade". oedigital.com. Offshore Engineer. Retrieved 26 July 2024.