Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a405c77d3cd570f3

Jump to content

Gary Works

From Wikipedia, the free encyclopedia

Gary Works
Aerial view of the Gary Works in 1973
Map
Built1906 (1906)
OperatedJune 28, 1908 (1908-06-28)
Location
Coordinates41°36′26.1468″N 87°20′15.2664″W / 41.607263000°N 87.337574000°W / 41.607263000; -87.337574000
IndustrySteel
Employees2,256 (2023)

The Gary Works is a steel mill in Gary, Indiana, on the shore of Lake Michigan. For many years[which?], the Gary Works was the world's largest steel mill, and it remains the largest integrated mill in North America.[1] It is operated by U.S. Steel.

The Gary Works includes both steelmaking and finishing facilities as an integrated mill, and has an annual capacity of 8.2 million tons.[2] It contains:[3]

  • Four blast furnaces
  • Three top-blown basic oxygen process (BOP) vessels
  • Three bottom-blown BOP (Q-BOP) vessels
  • Vacuum degasser
  • Three ladle metallurgy facilities
  • Four continuous slab casters
  • An 84-inch hot strip mill
  • Hot-rolled temper mill
  • 80- and 84-inch pickle lines
  • A 52-inch six-stand and an 80-inch five-stand cold-reduction mills
  • Electrolytic cleaning line
  • Three batch annealing facilities
  • A 38-inch continuous annealing line
  • An 80-inch one-stand, a 48-inch two-stand, and an 84-inch two-stand temper mills
  • A 48-inch two-stand double cold-reduction mill
  • A 37-inch and a 46-inch electrolytic tinning lines
  • Pig iron caster

The Gary Works was under construction from 1906 to 1908, and the first shipment of iron ore was unloaded on June 23, 1908.[4] About 11 million cubic feet (310,000 m3) of sand were moved in the process of constructing the plant.[5]

The Gary Works remains Gary's largest single employer and a key element of the city's tax base,[6] but employment levels have fallen substantially since the mid-20th century; the plant and allied facilities employed over 30,000 people in the early 1970s, but only 6,000 in 1990,[7] 5,000 in 2015,[8] 2,500 in 2021,[9] and 2,246 in 2023.[10] The plant is also a central part of the city's geography; its main entrance is at the northern end of Broadway, the city's main thoroughfare.[citation needed]

References

[edit]
  1. ↑ NiSource, Inc. (October 14, 1999). "U.S. Steel - Primary Energy Cogeneration Plant at Gary Works Wins National Recognition". Archived from the original on October 22, 2007. Retrieved June 10, 2011.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  2. ↑ U.S. Steel. "Gary Works". Retrieved June 10, 2011.[permanent dead link]
  3. ↑ "About Us - Locations - www.ussteel.com". www.ussteel.com. Retrieved August 26, 2021.
  4. ↑ Schoon 2003, p. 156.
  5. ↑ Schoon 2003, p. 155.
  6. ↑ "Gary gets a reprieve as DUAB rules against tax cap". Chicago Crusader. April 16, 2011. Archived from the original on March 10, 2012. Retrieved June 10, 2011.{{cite news}}: CS1 maint: bot: original URL status unknown (link)
  7. ↑ Catlin 1993, p. 90.
  8. ↑ Pete, Joseph S. (April 24, 2015). "U.S. Steel starts layoffs of up to 323 workers at Gary Works". NWI Times.
  9. ↑ Bonior, Jeffrey (October 26, 2021). "How Trade Action Helped Secure the Future for Steelworkers Like Mike Lohse". Alliance for American Manufacturing.
  10. ↑ Pete, Joseph S. (December 29, 2022). "U.S. Steel to lay off 244 workers when it idles tin operations at Gary Works". NWI Times.