Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25ae9764f078cc1

Jump to content

// Workers AI · dad joke modeWhat did Engineers Registration Board say to the train? You're on the right track.

From Wikipedia, the free encyclopedia

Engineers Registration Board
Formation1 December 1969; 56 years ago (1969-12-01)
TypeStatutory Authority
Location
Members842 (2018)[1]
Key people
Michael Odongo
Chairman
Henry Francis Okinyal
Vice Chairman
Websitehttp://www.erb.go.ug

The Engineers Registration Board (ERB), is a statutory authority established in 1969, under the Engineers Registration Act (ERA) Cap 271,[2] whose mission is to regulate and supervise the profession of engineering in Uganda.[3]

Location

[edit]

As of March 2018, the headquarters and offices of the ERB are temporarily housed at the offices of the Uganda Ministry of Works and Transport at Kyambogo, while efforts to secure a permanent location are ongoing, with the help of the Uganda Investment Authority.[4] The geographical coordinate of the ERB headquarters are: 00°20'24.0"N, 32°37'37.0"E (Latitude:0.339999; Longitude:32.626949).[5]

Overview

[edit]

Under its mandate, the ERB is authorized to (a) register (b) de-register (c) restore registration (d) suspend registration (e) hold inquiries (f) hear appeals and (f) appear as respondents against a case brought against it in the High Court. It is also mandated to advise the government regarding the engineering sector.[3]

The board is appointed by the Ugandan Minister of Works and Transport in consultation with the Uganda Institute of Professional Engineers (UIPE), the professional body of engineers in the country, who are guaranteed for positions on the board.[6]

The 17th Board was named on 15 March 2018, by the Ugandan Minister of Works and Transport, Engineer Monica Azuba Ntege. The ERB members named are:[4]

  1. Michael Odongo: Chairman
  2. Henry Francis Okinyal: Vice Chairman
  3. Andrew Kitaka: Member
  4. Elias Bahanda
  5. Michael Pande
  6. Florence Lubwama Kiyimba
  7. Peter Balimunsi
  8. Ronald Namugera: Board Registrar[1]

Registered engineers in Uganda, enjoy cross-border reciprocity of recognition of credentials in the countries of the countries of the East African Community (Burundi, Kenya, Rwanda, Tanzania and South Sudan).[6]

As of 25 January 2018, there were 842 registered engineers, of whom 774 were Uganda nationals with full operational licences and 68 were foreigners with temporary registration. 720 of the registered engineers are concentrated in Kampala, with only 105 scattered across the remaining 120 districts.[1]

Governance

[edit]

The current board is haired by Engineer Michael Odongo, who id deputized by Engineer Henry Francis Okinyal.[4]

See also

[edit]

Ministry of Works and Transport (Uganda)

References

[edit]
  1. 1 2 3 Misairi Thembo Kahungu (30 March 2018). "Ninety five districts have no registered engineers - Board". Daily Monitor. Kampala. Retrieved 30 March 2018.
  2. ULII (1 December 1969). "Engineers Registration Act 1969: Chapter number 271". Kampala: Uganda Legal Information Institute (ULII). Retrieved 22 March 2018.
  3. 1 2 ERB (31 December 2016). "About the Engineers Registration Board". Kampala: Engineers Registration Board (ERB). Archived from the original on 24 March 2018. Retrieved 22 March 2018.
  4. 1 2 3 Misairi Thembo Kahungu (15 March 2018). "Engineers decry quacks in the profession". Daily Monitor. Kampala. Retrieved 22 March 2018.
  5. "Location of the Temporary Headquarters of the Engineers Registration Board" (Map). Google Maps. Retrieved 22 March 2018.
  6. 1 2 Michael Moses Odongo (14 April 2015). "Why Engineers are still in short supply in Uganda". New Vision. Kampala. Retrieved 22 March 2018.
[edit]