Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a225e9a5bec6fa14

Jump to content

// Workers AI · dad joke modeWhat did Enerca say to its date? You energize me.

From Wikipedia, the free encyclopedia
Energie Centrafricaine
TypePublic utility
IndustryEnergy
Founded1963
HeadquartersRue de l'Industrie, ,
Area served
Greater Bangui Area
ProductsElectricity
ServicesElectricity Generation, Electricity transmission, Electricity Distribution
OwnerCAR Government (100%)

Energie Centrafricaine also known as Enerca is the principal energy utility company of the Central African Republic. The company was founded in 1963 and is the primary company in the country operating in the generation, transmission and distribution of electricity.[1] The company is owned by the government under the mandate of the Ministry of Development of Energy and Water Resources.[2]

Enerca operates two hydropower plants at Boali and a diesel power station in Bangui. The main center of electricity consumption is the capital city of Bangui. High voltage transmission lines link Boali's Mbali River hydroelectric area to the capital. Outside the capital, diesel generators are used to provide power.[3] The company has been looking for foreign investment from the World Bank and various European development agencies to upgrade its aging infrastructure.[4]

Operations

[edit]

The total installed capacity of the company is around 28 MW of which only 18 MW is operational.[5] Due to poor management, high operational costs, very high distribution losses and poor bill collection, ENERCA has struggled to raise capital to maintain its infrastructure. Bill collection rate stands at 60% and cost recovery of production is at 55%.

The company has a market penetration of only 18% in Bangui and 4% nationwide. As of 2016, the company has about 30,000 active customers.[2] The poor quality of services has forced consumers to either use personal diesel generators or solar systems for their electricity needs.

See also

[edit]

References

[edit]
  1. OECD; Bank, African Development; Africa, United Nations Economic Commission for (2009-12-04). African Economic Outlook 2009 Country Notes: Volumes 1 and 2: Country Notes: Volumes 1 and 2. OECD Publishing. ISBN 978-92-64-07618-1.
  2. 1 2 "Water and Electricity Upgrading Project | Projektmeldung | Zentralafrikanische Republik | Wasser und Umwelt". www.gtai.de (in German). Retrieved 2020-05-24.[dead link]
  3. "CAR - Emergency Power Response Project" (PDF). World Bank. 29 January 2009. Retrieved 24 May 2020.
  4. "CAR: World Bank allocates $54 million for 25 MW solar project in Bangui". Afrik 21. 2019-04-23. Retrieved 2020-05-24.
  5. "REEEP - Central African Republic (2012)". REEEP. Retrieved 2020-05-24.[dead link]
[edit]