Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a40017a69b68cf63

Jump to content

E-Com Centers

E-Com Centers
Project
Construction started
2006
Opening date2008 (first building)
StatusIn progress
ArchitectArquitectonica
OperatorSM Prime Commercial Properties Group
Physical features
Major buildings
    • One E-com Center
    • Two E-com Center
    • Three E-com Center
    • Four E-com Center
    • Five E-com Center
Location
E-Com Centers is located in Metro Manila
E-Com Centers
Location in Metro Manila, Philippines
Coordinates: 14°32′22″N 120°58′55″E / 14.5394°N 120.9819°E / 14.5394; 120.9819
CountryPhilippines
LocationCentral Business Park I-A, Pasay, Metro Manila

The E-Com Centers[a] are a complex of office buildings that are part of the Mall of Asia Complex at the Central Business Park I-A in Pasay, Metro Manila, Philippines.

History

[edit]

The SM Group had the groundbreaking of the first structure, the One E-Com Center on March 8, 2006 near the nearly complete SM Mall of Asia in an area the company then refer to as the "SM Central Business Park" (renamed as the Mall of Asia Complex in 2007[1]) The office building was meant to house business process outsourcing and other technology-oriented companies.[2][3] One E-Com Center was completed in 2008.[4]

The E-Com Center complex was reportedly planned to contain six buildings as early as 2014.[5]

Two E-Com Center, the second building in the complex, was completed in December 2011. Five E-Com Center, the third structure, was launched in May 2012.[6]

This was followed by the Three E-Com Center which broke ground in 2014 and opened in 2018, and the launch of the Four E-Com in 2023.[5][7][8]

As of 2026, Six E-Com Center is under construction as the latest addition to the E-Com development.[9][10]

Architecture and design

[edit]

The E-Com Centers was designed by Arquitectonica.[11][12] The developers of the complex is restricted by the building height restrictions imposed on the area due to proximity to the Ninoy Aquino International Airport. The complex's plan includes six main buildings, each built on roughly 10,000 square meters (110,000 sq ft) of land.[12]

As of 2026, the Three E-com Center, Four E-com Center and Five E-com Center have LEED Gold certification.[13]

Buildings

[edit]
Building Picture Opened Storeys Gross floor area[8] Ref.
One E-Com Center 2008 10 105,857 m2 (1,139,440 sq ft) [14]
Two E-Com Center 2012 15 104,000 m2 (1,120,000 sq ft) [8][6]
Five E-Com Center 2015 15 138,000 m2 (1,490,000 sq ft) [8][12]
Three E-Com Center 2018 15 121,000 m2 (1,300,000 sq ft) [8][15]
Four E-Com Center 2022–2023 15 174,000 m2 (1,870,000 sq ft) [8][16]
Six E-Com Center Under construction

Incidents

[edit]
  • September 11, 2025: A video circulated online showing security personnel apprehending a stray dog in front of the One E-Com Center. The incident, which showed the dog visibly distressed, drew significant public criticism and sparked a debate on the mall's policies regarding stray animals. The video's uploader and many online commentators questioned the mall's approach, comparing it unfavorably to the practices of other establishments, such as other malls, which are often praised for their animal welfare initiatives. The incident reignited a broader conversation about corporate responsibility towards strays in public spaces. After the backlash, the dog was brought to the Pasay City Veterinary Office and was declared safe.[17]
  • December 21, 2025: A fire was reported at the 6th floor of the Three E-Com Center. It was declared under control at 11:16 pm.[18]

Notes

[edit]
  1. Names of the buildings are stylized as OneE-com Center, TwoE-com Center, ThreeE-com Center, FourE-com Center, and FiveE-com Center

References

[edit]
  1. "SM Renames Business District as Mall of Asia Complex". SM Prime. September 28, 2007. Retrieved August 15, 2026.
  2. "One E-com Center unveiled". The Philippine Star. March 17, 2006. Retrieved August 16, 2026.
  3. Dela Peña, Zinnia B. "SM eyes BPO hub at Mall of Asia complex". The Philippine Star. Retrieved August 16, 2026.
  4. "SM Prime to spend P9 B for 3 MOA office towers". The Philippine Star. November 11, 2015. Retrieved August 16, 2026.
  5. 1 2 Camus, Miguel. (September 27, 2014). "SM breaks ground for upscale BPO tower". Philippine Daily Inquirer. Retrieved August 16, 2026.
  6. 1 2 "SM's Two E-Com named best office dev't in Philippines". Philippine Daily Inquirer. May 23, 2012. Retrieved August 16, 2026.
  7. "SM Prime launches FourE-Com Center". BusinessWorld. March 27, 2023. Retrieved August 16, 2026.
  8. 1 2 3 4 5 6 "Offer Supplement" (PDF). SM Prime Holdings, Inc. September 15, 2025. p. 67. Retrieved August 14, 2026.
  9. Loyola, James (March 17, 2026). "SMIC, SM Prime eye overseas bond market to fund expansion plans". Manila Bulletin. Retrieved August 16, 2026.
  10. "Credit Rating Report: SM Prime Holdings, INC" (PDF). Philratings. April 27, 2026. Retrieved August 16, 2026.
  11. "SM Prime targets 2026 completion for SixE-com Center in Pasay". BusinessWorld. March 20, 2025. Retrieved August 16, 2026.
  12. 1 2 3 "The future of office buildings has arrived". BusinessMirror. May 24, 2016. Retrieved August 16, 2026.
  13. Mercurio, Richmond (February 3, 2026). "SM Prime boosts green office portfolio". The Philippine Star. Retrieved August 16, 2026.
  14. "SM sets safety standards at OneE-com Center". The Philippine Star. March 1, 2009. Retrieved August 16, 2026.
  15. "ThreeE-com Center". SMCPG. Retrieved August 16, 2026.
  16. Abad, Roderick (April 5, 2023). "SM Offices debut certified green tower in Pasa". BusinessMirror. Retrieved August 16, 2026.
  17. "When the video of a stray dog being taken at MOA complex went viral, many of us worried "Where was he brought?" and more importantly, "Is he safe?"". Facebook.
  18. "Firefighters rushed to extinguish the fire at 6th floor office of Alorica, located at the Three E-Com Center, Mall of Asia complex in Pasay City". Facebook.