Draft:Kallang Bus Interchange
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL Last edited by George13lol2 (talk | contribs) 4 months ago. (Update)
Finished drafting? |
| An editor has marked this as a promising draft because the notability is unprovable as of 23 March 2026, but may become provable upon the interchange's opening, and requests that, should it go unedited for six months, G13 deletion be postponed, either by making a dummy edit to the page, or by improving it and submitting it for review. Last edited by George13lol2 (talk | contribs) 4 months ago. (Update) |
Kallang Bus Interchange 加冷巴士转换站 Pertukaran Bas Kallang | |
|---|---|
| General information | |
| Location | 7 Lorong 1 Geylang |
| System | Public Bus Interchange |
| Owned by | Land Transport Authority |
| Connections | EW10 Kallang |
| Construction | |
| Accessible | Accessible alighting/boarding points Accessible public toilets Graduated kerb edges Tactile guidance system |
Kallang Bus Interchange is an upcoming air-conditioned bus interchange currently under construction in Kallang, Singapore. Located beside Kallang MRT station, it will form part of the Kallang Integrated Transport Hub (ITH) within the HDB Kallang Horizon mixed-use development. The development comprises 477 Build-To-Order (BTO) flats and a range of community amenities, creating a seamless blend of residential and transport facilities.
History
[edit]In August 2022, the Housing Development Board released a map showing the location of an upcoming housing project right beside Kallang MRT station, which indicates a proposed bus interchange within the site.[1] The project was launched in November under the name Kallang Horizon.[2] The following year, an artist's impression of the exterior of an "urban transport hub" within the Kallang Horizon development was unveiled.[3] An infographic released by the Land Transport Authority for the nearby Kallang Breeze housing development that same year indicates a "Future Kallang Bus Interchange".[4] Kallang Bus Interchange was mentioned again in the Urban Redevelopment Authority's Master Plan 2025, as one of the four upcoming Integrated Transport Hubs.[5]
References
[edit]- ^ "townmap_kwn_n3c23a.jpg". August 2022. Archived from the original on 6 May 2025. Retrieved 24 March 2026 – via Housing Development Board.
- ^ "HDB to launch 9,500 BTO flats in November, with 3 new projects under prime location model". CNA. 17 November 2022. Archived from the original on 17 November 2022. Retrieved 24 March 2026.
- ^ "HDBPW23_01 Design Award_11" (PDF). Housing and Development Board. Archived from the original (PDF) on 5 January 2025. Retrieved 25 May 2025.
- ^ "Kallang Breeze Mobile" (PDF). Land Transport Authority. Archived (PDF) from the original on 1 August 2023. Retrieved 27 April 2025.
- ^ "Convenient & People-Centric Journeys". Urban Redevelopment Authority. Archived from the original on 15 July 2025. Retrieved 24 March 2026.