Draft:Interstate 81 Business
Review waiting, please be patient.
This may take 5 weeks or more, since drafts are reviewed in no specific order. There are 2,574 pending submissions waiting for review.
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
Reviewer tools
|
Submission declined on 18 August 2026 by Z. Patterson (talk).
Where to get help
How to improve a draft
You can also browse Wikipedia:Featured articles and Wikipedia:Good articles to find examples of Wikipedia's best writing on topics similar to your proposed article. Improving your odds of a speedy review To improve your odds of a faster review, tag your draft with relevant WikiProject tags using the button below. This will let reviewers know a new draft has been submitted in their area of interest. For instance, if you wrote about a female astronomer, you would want to add the Biography, Astronomy, and Women scientists tags. Editor resources
This draft has been resubmitted and is currently awaiting re-review. |
This draft is not adequately supported by reliable sources. Wikipedia's verifiability policy requires that all content be supported by reliable sources.
This draft's references do not show that the subject meets Wikipedia's criteria for inclusion. The draft requires multiple published secondary sources that:
Declined by Valorrr 11 months ago.
|
Comment: Entire paragraphs are uncited and probably do not fall under WP:SKYBLUE. Z. Patterson (talk) 02:02, 18 August 2026 (UTC)
Comment: Not only what Bulldog1979 said, but it I agree it is WP:TOOSOON for I-81 Business to be created. When I last visited in August (and again in April), the highway wasn't even near completion. Bryce M - 08:47, 26 February 2026
Comment: I would say that it's a bit premature to submit this topic as an article. I would disagree on notability from the reviewer, but I would probably hold off until the designation is put in use before putting an article on it out there. Imzadi 1979 → 04:06, 31 October 2025 (UTC)
Comment: Not only what Bulldog1979 said, but it I agree it is WP:TOOSOON for I-81 Business to be created. When I last visited in August (and again in April), the highway wasn't even near completion. Bryce M - 08:47, 26 February 2026
| Business Loop 81 | |
| Route information | |
| Maintained by NYSDOT | |
| Length | 11.8 mi (19.0 km) |
| Existed | September 22, 2026–present |
| Major junctions | |
| South end | |
| North end | |
| Location | |
| Country | United States |
| State | New York |
| County | Onondaga |
| Highway system | |
Interstate 81 Business (I-81 Bus. or I-81 BL), more commonly known as Business Loop 81 (BL 81), is a business route of I-81 that runs through Syracuse, New York, and some of its northern suburbs.
It replaced the former routing of I-81 through Syracuse, which includes an elevated viaduct built in the late 1950s, as the aging downtown viaduct is replaced by a street-level boulevard. The rest of I-81 Bus./BL 81 will remain a freeway. The mainline I-81 was rerouted outside the city, replacing the former I-481.
When commissioned, I-81 Bus. will be the first Interstate business route for both I-81 and New York state.[citation needed] The new route was designated in 2026 as construction concluded on the northern and southern termini designed to reroute I-81. The viaduct will be demolished around 2027, and Almond Street will be rebuilt to take the I-81 Bus. routing as a boulevard.
Route description
[edit]The majority of I-81 Bus./BL 81 will remain a freeway, save for a section in downtown Syracuse that is currently the viaduct but will be converted into a street-level boulevard. Murals will be installed along the retainer walls of the highway, highlighting the city's history and heritage, alongside that of the Onondaga Nation.[1]
I-81 Bus. begins at exit 81 on its parent route in a recently rebuilt interchange near the Southside, Eastside, and Valley neighborhoods of Syracuse. It will then have an immediate exit on East Glenn Street, complete with traffic circles above the highway and other ramps that connect back to I-81.[2] After two exits it is to go underneath a railroad bridge as a pedestrian path from Martin Luther King Boulevard straddles the roadway.[3] I-81 Bus. will then enter a traffic circle with Van Buren Street, then continue north as Almond Street.[4] After 1.5 miles (2.4 km) of street intersections, including one with NY 92, I-81 Bus. will turn left on Erie Boulevard (also known as NY 5) before emerging back into a freeway under I-690. Ramps connecting I-690 westbound to I-81 Bus. northbound and I-81 Bus. southbound and I-690 eastbound will be renovated and maintained, ensuring high-speed access between the highways.[citation needed]
Turning north, the BL 81 freeway will have newly rebuilt interchanges with Court Street, Bear Street (NY 298), and others before a large intersection with NY 370, which becomes the Onondaga Lake Parkway, in addition to other streets serving NBT Bank Stadium and the William F. Walsh Regional Transportation Center. It will then interchange with 7th Street, the New York State Thruway, and US 11 before serving the Syracuse Hancock International Airport.[2]
A few miles north in Cicero, I-81 Bus. has an interchange with NY 481 shortly before merging back with I-81 and ending. The series of interchanges with NY 481 and I-81 was formerly a complete cloverleaf interchange between I-81 and I-481/NY 481 - the latter two highways having once shared the same right-of-way - but has been reconstructed as a three-quarters cloverleaf interchange between BL 81 and NY 481, while I-81 passes by on the northeast corner, serving as the terminus of the two other highways at two respectively separate spots.[2] Like the intersection between I-81 and I-81 Bus. near Southside, this interchange in Cicero has been rebuilt to allow I-81 to flow seamlessly into its new configuration on the decommissioned I-481.[5]
History
[edit]Original routing of I-81
[edit]I-81, first designated in New York State in 1957, was built in several stages and completed for the most part in the mid-1960s. In Syracuse, part of I-81 was built on an elevated highway, intended to make travel from Downtown Syracuse to Syracuse University faster.[6] Extensions of the North Syracuse–Brewerton segment south into Downtown Syracuse (now exit 3B) and north to Parish (now exit 114) were completed c. 1961.[7]
The construction of the I-81 came with much controversy. After the freeway was completed, many neighborhoods were disrupted by the presence of the freeway. One neighborhood in particular, the 15th Ward in Syracuse, was largely replaced by the freeway. This decimated a close-knit Black-American community.[8] The New York Civil Liberties Union states that 1,300 familes were displaced by the viaduct when it was constructed.[9] When the displaced community attempted to disperse out into the city, white residents fled, reducing the population of the city by 30 percent over 60 years, while the population of the county grew 55 percent.[10]
Proposal to remove the viaduct
[edit]This section needs expansion. You can help by adding missing information. (March 2026) |
Replacing or removing the viaduct was a point of discussion during the 2010s, especially as the viaduct deteriorated while exceeding its expected useful life.[6] After deliberating between three options, including a full rebuild of the viaduct and a "no-build" option, in 2019, the state chose the "community grid" option that would tear down the viaduct and replace it with an urban boulevard complete with traffic circles and stoplights.[11]
Reconstruction of highways
[edit]The I-81 viaduct project, billed as the largest infrastructure project in the NYSDOT's history, began work on phase I in 2023, with $2.25 billion initially allocated to the project by the state.[12] The project also received $180 million federally from the Neighborhood Access and Equity Program in 2024.[13] By 2025, the NYSDOT awarded its fifth contract, which was to prepare the viaduct for closure and demolition, in addition to providing environmental remediations to the downtown community.[9]
The northern intersection reopened in stages in 2025, with two new flyover ramps carrying I-481/future I-81 in its new configuration opening in May and July, respectively.[14] In March 2026, the first stage of the revamped southern interchange between I-81 and I-481 was completed, allowing drivers from I-481/future I-81 southbound to seamlessly connect to I-81 southbound in its new configuration, while new exits and traffic circles connecting to I-81/future BL 81 northbound, as well as Brighton Ave. and East Glen St., were completed earlier that year.[15] Both the north and south interchanges were completed and opened by June.[5]
Construction on a new roadway for BL 81 to reach a new roundabout with Van Buren St. and Almond St. also began that year next to the existing I-81 roadway leading to the viaduct, which is set to be closed and prepared for demoliton once the new approach and roundabout are completed.[16] In addition, Interstate 690 will be widened to accommodate thru-traffic that once used the I-81 viaduct.
On September 23, 2026, governor Kathy Hochul announced that Business Loop 81 had been federally designated and that I-81 had been rerouted onto the former I-481. This was a major milestone before the demolition of the viaduct could commence.[17][18]
Also in 2026, a contractor for one segment of the project was placed under investigation by the district attorney for alleged misuse of funds.[19]
Feedback
[edit]This section needs expansion. You can help by adding missing information. (March 2026) |
Despite receiving praise from the NYCLU, urban planners and public officials, namely in the plan to redirect heavy traffic outside of downtown, the decision to remove the viaduct and downgrade the full Interstate designation was not without criticism from some in the Syracuse area. Some local residents worried the removal would accelerate gentrification, while many other residents did not have such fears. Some business owners in varying locations worried about a loss of revenue from the changes to vehicle traffic patterns, while many business owners were excited for increased foot traffic.[20]
Others were worried about the release of toxic gases dust during the demolition of the viaduct, with the "Renew 81 for All" group arguing the project's "environmental impacts would exacerbate rather than resolve issues related to environmental racism that the highway already causes."[21] Court challenges to the removal produced only temporary delays.[22] In particular, one ruling that sided with "Renew 81 for All", namely that the environmental study on traffic needed to also take into account the future Micron complex in Cicero, was reversed in 2024 by the state appeals court.[23]
The New York State Department of Transportation held several open houses open to the public in 2025,[24] in addition to running informational booths at the New York State Fair and other festivals in Syracuse,[25] with the aim of educating residents and receiving feedback.
Exit list
[edit]The entire route is in Onondaga County. [26]
| Location[26] | mi[26][27] | km | Old exit | New exit | Destinations | Notes | |
|---|---|---|---|---|---|---|---|
| Syracuse | 0.00 | 0.00 | Continuation south | ||||
| 0.2 | 0.32 | 16A | 1A | East Glenn Street | Left exit southbound; access from I-81 southbound to BL 81 via East Glenn Street from exit 81 to Brighton Avenue; signed as East Glenn Street northbound and as I-81 southbound | ||
| 0.3– 0.9 | 0.48– 1.4 | 17 | 1B | East Glen Street, South State Street, South Salina Street, Brighton Avenue, East Colvin Street | South State Street not signed northbound; access to JMA Wireless Dome; signed as exit 1C southbound | ||
| 84.07 | 135.30 | 18 | – | Adams Street, Harrison Street | Access to Oncenter and Syracuse University; exit will be demolished when the elevated highway is downgraded to a boulevard | ||
| 84.71 | 136.33 | — | 3A | No southbound access to I-690 west; exit will be remodeled once elevated highway is downgraded to a boulevard | |||
| 85.25 | 137.20 | 19 | 3B | Clinton Street, Salina Street | Southbound exit and northbound entrance | ||
| 85.37 | 137.39 | 20 | – | Franklin Street, West Street | Southbound exit and northbound entrance | ||
| 85.81 | 138.10 | 21 | – | Spencer Street, Catawba Street | Former I-81 Southbound exit and entrance; permanently closed December, 20, 2025[28] | ||
| 85.95 | 138.32 | - | 4A | North Clinton Street | Southbound exit and entrance; opened December 20, 2025; replaces the former I-81 exit 21 Spencer Street/Catawba Street exit | ||
| 86.23– 87.45 | 138.77– 140.74 | 22 | 4B | I-690 not signed northbound | |||
| 23 | 5 | Hiawatha Boulevard, Destiny USA Drive | Southbound exit only; signed as exits 5A (Hiawatha) and 5B (Destiny) | ||||
| 86.90 | 139.85 | 23–24 | 5A-C | Northbound exit and southbound entrance; signed as exits 5A (NY 370 east), 5B (NY 370 west; closed indefinitely due to truck safety issues at the Onondaga Lake Parkway Bridge), and 5C (Old Liverpool) | |||
| Salina | 88.02 | 141.65 | 25 | 6 | 7th North Street – Liverpool | ||
| 88.30 | 142.11 | 25A | 7 | Exit 36 on I-90 / Thruway | |||
| 89.85 | 144.60 | 26 | 8 | ||||
| 90.46 | 145.58 | 27 | 9A | Combined with exit 9B northbound and exit 8 southbound | |||
| Cicero | 91.28 | 146.90 | 28 | 9B | Taft Road – North Syracuse | ||
| 11.3 | 18.2 | 29 | 11A-B | Exits 96N-S on I-81 and exits 1A-B on NY 481; no access from BL 81 southbound back to I-81; signed as I-81 northbound and NY 481 southbound | |||
| 11.8 | 19.0 | Continuation north | |||||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi | |||||||
See also
[edit]- List of business routes of the Interstate Highway System
- Interstate 80 Business (Sacramento, California), a former alignment of Interstate 80
- West Side Highway, formerly the West Side Elevated Highway
- Inner Loop (Rochester)
- New York State Route 895, formerly Interstate 895
References
[edit]- ↑ "State Department of Transportation Introduces Mural Design Concepts as Part of the Transformative Interstate 81 Project". New York State Department of Transportation. August 13, 2025. Archived from the original on July 3, 2026. Retrieved August 20, 2026.
- 1 2 3 "Overview Map of I-81 Bus./BL 81" (Map). Google Maps. Retrieved September 11, 2026.
- ↑ Breidenbach, Michelle (August 13, 2025). "What will Business Loop 81 look like as drivers approach Syracuse? See new drawing". Syracuse.com. Retrieved September 2, 2025.
- ↑ Deryn, Alexandra (April 13, 2026). "Downtown Syracuse traffic changed as part of I-81 Viaduct Project". WSYR.
- 1 2 "I-481 and I-81 interchange work complete as part of Syracuse's I-81 project". spectrumlocalnews.com. June 11, 2026. Retrieved August 20, 2026.
- 1 2 The Post-Standard Editorial Board (May 14, 2010). "Tear Down I-81?" (Editorial). The Post-Standard. Syracuse, NY. Archived from the original on August 17, 2011. Retrieved April 4, 2011.
- ↑ H.M. Gousha Company (1961). New York and Metropolitan New York (Map) (1961–62 ed.). Sunoco.
- ↑ Moore, Julie (June 25, 2013). "Freeways, Suburbanization and Segregation". Wordpress. Archived from the original on February 24, 2017. Retrieved February 15, 2017.[self-published source]
- 1 2 "NYSDOT Readies for Syracuse Viaduct Removal with Demolition Contract, Community Health Strategy | Engineering News-Record". www.enr.com. Retrieved May 24, 2026.
- ↑ Semuels, Alana. "The Role of Highways in American Poverty". The Atlantic. Archived from the original on February 21, 2017. Retrieved February 11, 2017.
- ↑ "I-81 Viaduct Project". New York State Department of Transportation. Retrieved August 6, 2025.
- ↑ "Syracuse I-81 Viaduct Project underway to reach goals for 2025". Equipment World. March 31, 2025. Retrieved March 5, 2026.
- ↑ "Syracuse gets $180 million in federal funds for I-81 project". spectrumlocalnews.com. Retrieved May 2, 2026.
- ↑ "Second flyover ramp in Cicero completed as part of I-81 project". spectrumlocalnews.com. Retrieved May 2, 2026.
- ↑ Fox, Renee (March 5, 2026). "A key piece of I-81 project in Syracuse is now open for traffic". syracuse. Retrieved March 6, 2026.
- ↑ Breidenbach, Michelle (January 20, 2026). "Closing part of Syracuse's elevated viaduct forever: What to expect on the I-81 project in 2026". syracuse. Retrieved May 24, 2026.
- ↑ NewsChannel 9 WSYR Syracuse (September 22, 2026). I-481 formally renamed I-81 in major step for removing viaduct. Retrieved September 23, 2026 – via YouTube.
{{cite AV media}}: CS1 maint: numeric names: authors list (link) - ↑ Staff, CNY Central (September 22, 2026). "I-481 becomes new I-81, clearing path for Syracuse viaduct removal and Community Grid". WSTM. Retrieved September 23, 2026.
- ↑ Kirk, Rylee (September 24, 2026). "DA investigating criminal charges in spat between I-81 contractors". syracuse. Retrieved September 24, 2026.
- ↑ Zarroli, Jim (June 3, 2023). "Why It's So Hard to Tear Down a Crumbling Highway Nearly Everyone Hates". The New York Times. Retrieved July 17, 2023.
- ↑ "Residents express concerns over I-81 viaduct removal". spectrumlocalnews.com. Retrieved May 2, 2026.
- ↑ Wright, Stephanie (November 17, 2022). "'It makes no sense': New York judge halts I-81 demolition, reconstruction plan". The Daily Orange. Retrieved July 17, 2023.
- ↑ Breiden, Michelle (February 18, 2023). "After a mixed decision in court, NY sticks to plan to remove I-81 through Syracuse". syracuse. Retrieved July 17, 2023.
- ↑ "Next steps of I-81 viaduct project showcased at open house". spectrumlocalnews.com. Retrieved December 12, 2025.
- ↑ Misiaszek, Emma (August 20, 2024). "NYSDOT to showcase replica of future Business Loop 81 at upcoming NYS Fair". WSTM. Retrieved December 12, 2025.
- 1 2 3 Office of Technical Services (2014). "Inventory Listing". Engineering Division, New York State Department of Transportation. Archived from the original on April 19, 2014. Retrieved July 22, 2015.
- Onondaga County Archived July 23, 2015, at the Wayback Machine
- ↑ "New York State Roadway Inventory System Viewer". New York State Department of Transportation. Archived from the original on January 16, 2017. Retrieved April 14, 2017.
- ↑ Devanny, Hannah (December 20, 2025). "Updates on the I-81 Viaduct Project". WSTM-TV.


- Reliable sources include: reputable newspapers, magazines, academic journals, and books from respected publishers.
- Unacceptable sources include: personal blogs, social media, predatory publishers, most tabloids, and websites where anyone can contribute.
Replace any unreliable sources with high-quality sources. If you cannot find a reliable source for the material, it should be removed.