Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a44da99f7b8c6069

Jump to content

Draft:Famfa Office Towers

From Wikipedia, the free encyclopedia



Central Point Tower
Central Point Tower in Ikoyi, Lagos
Former namesFAMFA Office Tower
General information
StatusCompleted
TypeOffice
LocationIkoyi, Lagos, Nigeria, Alfred Rewane Road and Olawale Dawodu Road
Completed
2022
Height
Height107 m (351 ft)
Technical details
Floor count20 plus basement
Floor area55,000 m2 (590,000 sq ft)
Design and construction
Main contractorJulius Berger Nigeria
Other information
Parking266 spaces

Central Point Tower, formerly known as the FAMFA Office Tower, is a high-rise office building in Ikoyi, Lagos, Nigeria. The building is 107 m (351 ft) tall and has 20 floors plus a basement.[1]

The tower is located at the intersection of Alfred Rewane Road and Olawale Dawodu Road. It has a gross floor area of approximately 55,000 m2 (590,000 sq ft) and occupies a site of approximately 5,695 m2 (61,300 sq ft).[1]

The owner of the building is Folorunsho Alakija.[2]

History

[edit]

Construction of the FAMFA Office Tower was underway by 2018, when it was listed among the ongoing projects of Julius Berger Nigeria.[3]

Julius Berger served as the main contractor and carried out the main civil works, finishing works, façade, mechanical, electrical and plumbing installations, and lift installations. Its work on the building was completed in November 2022.[1] The building costed around 60 billion naira,[4] with a net worth of 3 billion dollars as of 2018.[5][6]

The building was subsequently renamed Central Point Tower.[1] It was formally inaugurated in Lagos in October 2023.[7]

Design and construction

[edit]

Central Point Tower contains commercial office space, owner-occupied office accommodation and a multipurpose hall.[1] Nine floors combine lettable office accommodation with split-level parking facilities, while six floors contain lettable offices capable of being divided into four self-contained units.[1]

The development provides 266 parking spaces.[1]

Because of the proximity of surrounding buildings, a secant pile wall was used as an excavation retaining structure during construction.[1]

According to Julius Berger, approximately 72,000 m3 (2,500,000 cu ft) of concrete and 9,700 t (21,400,000 lb) of steel were used in the project.[1]

See also

[edit]

References

[edit]
  1. 1 2 3 4 5 6 7 8 9 "FAMFA Office Tower". Julius Berger Nigeria Plc. Retrieved 24 August 2026.
  2. ↑ "Is Kingsway Road the preferred office location for Nigeria's billionaires?". Nairametrics. 15 July 2021. Retrieved 15 September 2026.
  3. ↑ "Julius Berger grows profit by 142.4% to N6.1bn". The Punch. 21 June 2019. Retrieved 24 August 2026.
  4. ↑ NSEHE, MFONOBONG (22 May 2022). "Nigeria's richest woman Folorunsho Alakija completes $145-million office complex". Billionaires Africa. Retrieved 15 September 2026.
  5. ↑ "Who Owns Famfa Towers, West Africa's Most Expensive Building And Where Is It Located?". 1 November 2018. Retrieved 15 September 2026.
  6. ↑ "Famfa Towers: Folorunsho Alakija builds West Africa's most expensive tower in Ikoyi (photos)". 1 November 2018. Retrieved 15 September 2026.
  7. ↑ "Folorunsho Alakija's FAMFA Head Office Commissioned". THEWILL. 29 October 2023. Retrieved 24 August 2026.