Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a40fe80ade901528

Jump to content

Draft:Bluecore Energy

From Wikipedia, the free encyclopedia

Bluecore Energy is an American nuclear energy startup developing small modular reactors (SMRs) intended for installation on floating barges. The company was founded in 2026 by Kofi Asante and is based at the Port of Long Beach in Long Beach, California. Its proposed systems are intended for electricity generation for ports and other infrastructure.[1][2][3]

Bluecore Energy
TypePrivate
IndustryNuclear energy
Founded2026
FounderKofi Asante
ProductsSmall modular reactors
Websitewww.bluecore.energy

The company emerged from stealth in July 2026 with a reported US$10 million pre-seed financing round led by Slauson & Co. In September 2026, it announced a US$50 million seed financing round led by Silverton Partners. The financing was reported as supporting engineering and hardware development, testing, regulatory and classification work, manufacturing and hiring.[4][5]

History

[edit]

Founding

[edit]

Bluecore Energy was founded in 2026 by Kofi Asante, who became the company's founder and chief executive officer. Before establishing Bluecore, Asante worked in technology, transportation and aerospace-related ventures, including roles associated with Uber, Elroy Air and electric boat company Arc.[6][7]

Asante has described the company's focus as a response to growing electricity requirements in ports and other infrastructure. Bluecore was established with a focus on applying small modular reactor technology to maritime environments.[8]

Emergence from stealth

[edit]

Bluecore publicly launched in July 2026. At the time, the company announced a US$10 million pre-seed financing round led by Slauson & Co.. Reporting on the launch described the company's plan to develop compact reactors mounted on floating barges. The company established a facility at the Port of Long Beach for engineering and testing work. The initial equipment included a barge and a non-nuclear test pressure vessel.[9]

Port of Long Beach

[edit]

Bluecore's headquarters and development facility are located within the Port of Long Beach. The company's presence at the port is connected with the port's interest in meeting future electricity demand associated with electrification and zero-emission operations. In 2026, the Port of Long Beach and the U.S. Maritime Administration established a cooperation framework concerning advanced maritime energy systems and possible applications of small modular reactors. The cooperation does not constitute regulatory approval of a Bluecore reactor or a commitment to purchase the company's technology. Bluecore proposed system has been described as potentially being located offshore or near port infrastructure and connected to electricity users through subsea cables. Any commercial deployment would require additional technical, regulatory and safety approvals.[10][11]

Technology

[edit]

Reactor concept

[edit]

Bluecore is developing a compact, water-cooled small modular reactor with a stated target electrical output of approximately 10 megawatts electric (MWe). The reactor is intended to be mounted on a floating platform rather than installed as a conventional fixed-site nuclear power plant. The proposed system uses nuclear fission to generate heat, which is converted into electricity through a conventional thermal power cycle. Bluecore describes its design as incorporating multiple physical barriers and passive safety features. The company's stated design includes fuel, cladding, a reactor vessel, steel containment and water shielding as layers of protection. These features are part of the proposed design and remain subject to engineering and regulatory review.[12]

Floating deployment

[edit]

A principal feature of Bluecore's concept is the use of floating platforms. The company proposes that a reactor could be transported by water and deployed near an electricity user, potentially reducing the need to construct a permanent power-generation site at each location. Potential applications identified in company and media reports include ports, industrial facilities, data centers, coastal communities and other large electricity users. Cargo-ship propulsion has also been discussed as a possible future application, rather than an existing commercial use.[13]

Safety and regulation

[edit]

The proposed technology is subject to both nuclear and maritime regulatory requirements. Bluecore has reported engagement with the U.S. Nuclear Regulatory Commission and the United States Coast Guard concerning its reactor and floating-platform design. The company has also been working with maritime classification organizations and other technical specialists. Regulatory engagement is part of the development process and does not indicate that the proposed reactor has been approved for commercial operation. As of September 2026, the equipment demonstrated at Bluecore's Port of Long Beach facility was described as a non-nuclear prototype and did not contain nuclear fuel or radioactive material.[14]

Testing and development

[edit]

Bluecore has established testing infrastructure at the Port of Long Beach. A test pressure vessel has been used for engineering, instrumentation and safety-related development. The company has reported plans to obtain nuclear fuel and continue testing in cooperation with a national nuclear laboratory. In September 2026, U.S. Maritime Administrator Capt. Steve Carmel visited Bluecore's facility at the Port of Long Beach. The visit included a demonstration of the company's non-nuclear test pressure vessel and discussions concerning engineering, design and safety studies for maritime applications of small modular reactors.[15]

Funding

[edit]

Pre-seed financing

[edit]

Bluecore announced a US$10 million pre-seed financing round in July 2026. The round was led by Slauson & Co. and included several venture capital firms and individual investors. The financing was used to support the development and testing of Bluecore's floating nuclear system and the establishment of its operations at the Port of Long Beach.[16][17]

Seed financing

[edit]

In September 2026, Bluecore announced a US$50 million seed financing round led by Silverton Partners. The round was reported as oversubscribed and brought the company's publicly announced financing to approximately US$60 million. The new financing is intended to support product development, testing, regulatory and classification work, manufacturing, hiring and nuclear-fuel procurement.[18]

Leadership

[edit]

Kofi Asante

[edit]

Kofi Asante is the founder and chief executive officer of Bluecore Energy. His previous professional experience includes work in technology, transportation and aerospace-related companies and ventures. Asante has stated that Bluecore's objective is to develop nuclear power systems that can be deployed in maritime environments. His public statements have focused on the potential role of movable nuclear generation in supplying electricity to locations with growing power requirements.[19]

Engineering team

[edit]

Bluecore's team includes personnel with backgrounds in nuclear engineering, aerospace, maritime transportation and automotive technology. The company identifies Kwadwo Adutwum as its nuclear core design lead and Megan Moyette as its licensing and safety lead.

Public and regulatory context

[edit]

Bluecore's proposed technology has received coverage because of its planned location at the Port of Long Beach and its proposed use of floating nuclear reactors. The Los Angeles Times reported that the project remains several years from potential deployment and that federal regulatory approval and public consideration of safety issues would be required. Public discussion has included questions about nuclear safety, regulation, maritime security, emergency response and the suitability of floating reactors near a major port. These issues remain part of the regulatory and development process.[20]

Current status

[edit]

As of September 2026, Bluecore Energy was developing and testing components for a proposed floating small modular reactor. Its Port of Long Beach prototype was non-nuclear, and the company had not yet deployed or commercially operated a nuclear reactor. Future commercial deployment depends on successful engineering development, testing, regulatory approval, nuclear-fuel arrangements, manufacturing and compliance with applicable nuclear and maritime safety requirements.[21]

References

[edit]
  1. ↑ FinSMEs (2026-09-09). "Bluecore Energy Raises USD50M in Seed Funding". FinSMEs. Retrieved 2026-09-14.
  2. ↑ Fine, Howard (2026-09-14). "Bluecore Lands $50M Round". Los Angeles Business Journal. Retrieved 2026-09-14.
  3. ↑ Rak, Matko (2026-09-13). "Bluecore Energy closes US$50m financing". WorldCargo News ‣ Leading site for cargo handling industry. Retrieved 2026-09-14.
  4. ↑ Kuuire, Labari AI, Joseph-Albert (2026-09-09). "Bluecore Energy Raised $50 Million, Betting that Floating Reactors Can Bring Clean Energy Anywhere a Ship Can Go". Tech Labari. Retrieved 2026-09-14.{{cite web}}: CS1 maint: multiple names: authors list (link)
  5. ↑ Ports, Splash (2026-09-10). "Bluecore raises $50m for floating nuclear power at ports". Splash247. Retrieved 2026-09-14.
  6. ↑ Segal, Mark (2026-09-08). "Bluecore Energy Raises $50 Million to Build Floating Nuclear Power Plants". ESG Today. Retrieved 2026-09-14.
  7. ↑ Garsten, Ed. "Bluecore Floating Nuclear Power Plant A First For Black Entrepreneur". Forbes. Archived from the original on 2026-08-30. Retrieved 2026-09-14.
  8. ↑ Davis, Dominic-Madori (2026-09-08). "Nuclear startup Bluecore Energy raises $50M seed round, just two months after launch". TechCrunch. Retrieved 2026-09-14.
  9. ↑ Garsten, Ed. "Bluecore Floating Nuclear Power Plant A First For Black Entrepreneur". Forbes. Archived from the original on 2026-08-30. Retrieved 2026-09-14.
  10. ↑ "Bluecore Energy developing nuclear power barge at Port of Long Beach". www.workboat.com. Retrieved 2026-09-14.
  11. ↑ "Is Long Beach ready for a floating nuclear power plant? Here's what to know". Los Angeles Times. 2026-08-28. Retrieved 2026-09-14.
  12. ↑ Ports, Splash (2026-09-10). "Bluecore raises $50m for floating nuclear power at ports". Splash247. Retrieved 2026-09-14.
  13. ↑ https://finance.yahoo.com/energy/articles/nuclear-startup-bluecore-energy-raises-141017394.html
  14. ↑ Robinson, Dan (2026-09-08). "Floating nuclear startup Bluecore lands $50M funding before setting sail". theregister. Retrieved 2026-09-14.
  15. ↑ "US maritime nuclear energy company raises USD50 million". World Nuclear News. 2026-09-08. Retrieved 2026-09-14.
  16. ↑ https://finance.yahoo.com/energy/articles/bluecore-energy-raises-50m-seed-161458812.html
  17. ↑ Cohen, Trace (2026-09-08). "Bluecore Energy Raises $50M Seed For Floating Nuclear". Value Add Pulse. Retrieved 2026-09-14.
  18. ↑ DataPortuaria (2026-09-09). "Bluecore Energy Secures $50M Funding for Floating Nuclear Reactor System". DataPortuaria. Retrieved 2026-09-14.
  19. ↑ Fehrenbacher, Katie (2026-07-21). "Nuclear barge startup Bluecore Energy came out of stealth with $10M". Axios. Retrieved 2026-09-14.
  20. ↑ Dixit, Mrigakshi. "New floating nuclear powerhouse aims to power 15,000 coastal homes". Interesting Engineering. Retrieved 2026-09-14.
  21. ↑ Davis, Dominic-Madori (2026-09-08). "Nuclear startup Bluecore Energy raises $50M seed round, just two months after launch". TechCrunch. Retrieved 2026-09-14.