// Workers AI · dad joke modeWhy did the Domain Highway go to therapy? It had a lot of "site" issues.
This article needs more citations. (June 2014) |
Domain Highway | |
|---|---|
![]() | |
| General information | |
| Type | Highway |
| Location | Queens Domain |
| Length | 2.0 km (1.2 mi)[1] |
| Opened | 1943 |
| Route number(s) | |
| Major junctions | |
| Northwest end | |
| |
| Southeast end | |
| Location(s) | |
| Region | Hobart |
| Highway system | |
The Domain Highway[2] is a highway in Tasmania, Australia. The highway acts as a link road connecting traffic between Hobart's two busiest highways; The Tasman Highway and the Brooker Highway while also bypassing the Hobart city centre. With recorded annual average daily traffic of 25,000,[3] the single carriageway road is busier than some of Hobart's dual carriageway highways. Commencing at the Brooker Highway at Cornelian Bay and heading southeast between the banks of the River Derwent and the Domain and Botanical Gardens. The highway ends at the Tasman Highway, on the western approach of the Tasman Bridge.
In 2025, the highway was closed for two months to install sewerage pipelines.[4] In 2026, the Tasmanian Government announced that they will be fixing and improving the highway.[5]
Exits
[edit]The entire highway is in the City of Hobart local government area.
| Location | km[1] | mi | Destinations | Notes | |
|---|---|---|---|---|---|
| New Town | 0 | 0.0 | North-western highway terminus; trumpet interchange | ||
| Queens Domain | 0.55 | 0.34 | Queens Walk – Cornelian Bay | T junction | |
| 0.85 | 0.53 | Lower Domain Road – Botanical Gardens | T junction | ||
| 2.0 | 1.2 | South-eastern highway terminus; semi-directional T interchange | |||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi | |||||
See also
[edit]References
[edit]- 1 2 "Domain Highway" (Map). Google Maps. Retrieved 3 June 2014.
- ↑ "Ozroads: Tasmanian route B36". www.ozroads.com.au. Retrieved 29 August 2026.
- ↑ "Domain Highway Planning" (PDF). Department of Infrastructure, Energy and Resources. 2012. Archived from the original (PDF) on 3 March 2014. Retrieved 14 February 2014.
- ↑ "Busy Hobart road to close for two months during sewer pipeline install". Pulse Tasmania. 28 February 2025. Retrieved 29 August 2026.
- ↑ "Domain and Brooker Highway planning study – Transport Services". www.transport.tas.gov.au. Retrieved 29 August 2026.
