Devon Metro
| Devon Metro | |||
|---|---|---|---|
Okehampton Station was reopened in 2021 as part of the Devon Metro project | |||
| Overview | |||
| Area served | Greater Exeter (Exeter travel to work area) | ||
| Locale | Devon, United Kingdom | ||
| Transit type | Suburban rail, commuter rail | ||
Number of lines | 5 | ||
Number of stations | 41 | ||
Daily ridership | |||
| Operation | |||
| Operators | Great Western Railway, South Western Railway | ||
Infrastructure manager | Network Rail | ||
| Train length | 2–6 cars | ||
| Technical | |||
| System length | 112.5 miles (181.1 km) | ||
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
| |||
The Devon Metro is a Devon County Council strategy to increase passenger rail usage and reduce overcrowding on the regional rail network in and around the city of Exeter in Devon.[2][3] It includes five lines with a total of 41 stations.
The strategy was initiated in 2011.[4][5][6] It has resulted in increasing the frequency of trains on existing lines,[7] new lines and stations opening,[8][9] and improved integration between trains and other modes of transport.[10] The intention is to see a portion of the regional rail network become a "turn-up-and-go" service without the need to refer to a timetable[11]
History
[edit]Background
[edit]Due to the historical development of railways by competing companies in Exeter, which acts as the gateway to the rest of the South West Peninsula, the city has enjoyed an unusually extensive railway network for its size, being the meeting point of various lines.[12] Despite substantial sections of Exeter's railway infrastructure being selected for closure as a part of the Beeching Axe, such as St Thomas station and the Avocet and East Devon Lines,[13] most of the network survived, but underwent significant economies to justify their retention, including the singling of previously double-tracked routes.[14]
In the years since, Exeter has gone through substantial expansion and has become one of the fastest-growing cities in the country,[15] with growth particularly in the eastern suburbs of the city. This has led to Exeter becoming one of the most congested cities in the UK.[16] The need to reduce congestion on the roads led to the reopening of Pinhoe and Digby & Sowton[17] stations in 1983 and 1995 respectively, and the construction of a new passing loop at Axminster in 2009 to increase the frequency on the East Devon Line.[18] These enhancements in the east of the city were intended to attract more commuters to travel to and from the city centre by train instead of car. The local rail routes subsequently experienced rapid growth in passenger numbers, forcing them to operate near or at maximum track capacity with the limitations of the single-track lines left after Beeching.[12] This impacted reliability, due to the lack of leeway available if a train was slightly delayed. This caused problems to cascade, often requiring trains to be cancelled to regulate the service. Compounded with the continuing high levels of congestion and population growth, this led Devon County Council to submit an expression of interest to the government for funding towards what it dubbed the "Devon Metro scheme" in 2010.[19]
Initial proposals
[edit]Initial proposals of the Devon Metro scheme were laid out as part of the Future of Transport in Exeter consultation in March and April 2010.[20] This set out short to medium term plans for new stations "related to areas of new development or existing employment sites in the city". New stations at Marsh Barton, Newcourt and Monkerton were explicitly mentioned. The proposal also included longer term goals such as a new station at Cullompton and increased train frequencies; however it also mentioned that increased train frequency would depend on the construction of new passing loops on single track lines.[21]
In the final report written at the conclusion of the consultation, 84% of respondents indicated support for the rail enhancements under the Devon Metro scheme, with only 5% expressing opposition.[22]
A further briefing was published in 2011 outlining the scheme in more detail, including an implementation plan for 2011-2026.[2] In the short term they included:
- Increased frequency on the Riviera Line to 2tph to ease overcrowding
- Introduction of longer four-car trains by reallocating surplus rolling stock from other lines
- New Riviera line stations in Exeter at Marsh Barton and Newcourt, as well as at Edginswell in Torquay.
- New East Devon line station at Cranbrook.
The briefing also included longer term plans, including:
- Increased frequency on the Avocet line to 4tph, reliant on new passing loops being installed at Lympstone and Digby & Sowton.
- New Avocet line station at Monkerton to serve the Met Office headquarters at Exeter Business Park, reliant on an extra passing loop being installed.
- New station at Cullompton on the Bristol–Exeter line, reliant on a new local train service being introduced, as it is located on the main line.
- Increased frequency on the East Devon line to 2tph, reliant on a new passing loop being installed at either Cranbrook or Whimple.
Several improvements were also ruled out at this stage:
- A new station at Exminster just south of Exeter was deemed not possible as the high levels of traffic on the South Devon main line, which overlaps with the majority of the Riviera line, only made a single additional station practical without further infrastructure improvements. (Marsh Barton was chosen instead as the station to be prioritised, eventually opening in 2023.)
- Reactivating the Dartmoor line was not considered viable due to the high capital cost of the re-opening and the revenue cost of the operation. (Despite this the Dartmoor line was later reopened as a part of the Devon Metro in 2021, with funding from the Restoring Your Railway programme.)
- Realigning the section of railway from Dawlish to Teignmouth to prevent disruption from sea water and weather damage was said not to justify the large costs.
Completed enhancements
[edit]Some of the enhancements completed since Devon Metro started:
- The frequency on the Riviera Line was increased to two trains per hour in 2014.[7]
- Cranbrook railway station opened in 2015.[23]
- Newcourt railway station opened in 2015.[24]
- Marsh Barton railway station opened in 2023.[25]
- The Dartmoor Line reopened in 2021.[26]
- Okehampton Interchange railway station opened in 2026.[27]
Future plans
[edit]Plans to create a Devon Metro also include a proposed new station at Edginswell on the Riviera Line. The council also wishes for the Dartmoor Line to be extended to serve the town of Tavistock, which would revive a connection provided until 1968 by the Exeter to Plymouth railway of the LSWR. A Tavistock rail link to Bere Alston was funded by the Restoring Your Railway fund until that was scrapped by the incoming Labour government in 2024.
Funding for stations in Wellington and Cullompton on the Bristol–Exeter line, which line was included in the Devon Metro plan but is yet to receive service enhancements, has been secured by new Spending Review settlement funding.[28] Work on the new Wellington station commenced in early 2026.[29]
Passenger volume
[edit]2024/25 data shows that journeys to/from Exeter Central constitute the largest passenger flow forNewton Abbot (72,706 journeys), Exmouth (182,175 journeys), and Paignton (52,399 journeys).[30][31][32]
Routes
[edit]The network has five operational lines with a total of 41 stations across Exeter, East Devon, Mid Devon and Teignbridge.[2][33] All routes serve the two principal stations in Exeter, Exeter Central and Exeter St Davids.
- The Avocet Line serves Exmouth; most services continue from Exeter along the Riviera Line.[34][35]
- The Dartmoor Line serves Crediton and Okehampton.[36][37]
- The East Devon Line is the part of the Exeter–London Waterloo line between Exeter and Axminster.[38][39]
- The Riviera Line serves Newton Abbot and Paignton; most services continue from Exeter along the Avocet Line.[34][40]
- The Tarka Line serves Crediton and Barnstaple.[36][41]
References
[edit]- ↑ Taylor, Caitlin (13 February 2026). "Exeter rail journeys surge council pushes public transport to meet Net Zero goals". North Devon Gazette. Retrieved 22 July 2026.
- 1 2 3 "Devon Metro Briefing - fulfilling the potential of rail" (PDF). Devon County Council Website. Archived from the original (PDF) on 29 May 2013. Retrieved 16 July 2024.
- ↑ "Background - Marsh Barton railway station". Devon County Council. Retrieved 11 August 2022.
- ↑ Clark, Daniel (5 August 2019). "The Devon Metro proposals - eight years after they were launched". Devon Live. Retrieved 30 March 2022.
- ↑ "Devon Metro – a summary" (PDF). Avocet Line Rail Users Group. Retrieved 30 March 2022.
- ↑ Thompson, Bruce; Tozer, Dave; Abbott, James (23 February 2021). "Devon Metro moves forward". Modern Railways. Retrieved 30 March 2022.
- 1 2 "Half hourly Paignton services to be restored" (Press release). Great Western Railway. 21 February 2014.
- ↑ "Dartmoor Line". Network Rail. Retrieved 16 July 2024.
- ↑ Clark, Daniel (5 February 2023). "Devon plan for new 'fast-track' train stations". Devon Live. Retrieved 16 July 2024.
- ↑ "Devon's integrated vision". www.modernrailways.com. 30 September 2022. Retrieved 16 July 2024.
- ↑ "Budget 2021: Funding backs reopening of Cullompton Railway Station". BBC News. 28 October 2021. Retrieved 16 July 2024.
- 1 2 "Devon Metro – A Summary" (PDF). Avocet Line Rail Users Group. Archived (PDF) from the original on 5 February 2024. Retrieved 16 July 2024.
- ↑ The Reshaping of British Railways (PDF). London: British Railways Board. 1963. p. 113.
- ↑ "History". Avocet Line Rail Users Group. Retrieved 16 July 2024.
- ↑ "Exeter: Consultations held over city's 20-year future". BBC News. 5 December 2023. Retrieved 16 July 2024.
- ↑ "Highway Issues in Exeter". Exeter Civic Society. Retrieved 16 July 2024.
- ↑ Abbott, James, ed. (July 1995). "Three new stations in summer timetable". Modern Railways. 52 (562): 388.
- ↑ Network Rail (2 February 2009). "Redoubling at Axminster Begins" (Press release). Archived from the original on 7 August 2011.
- ↑ "The future of transport in Exeter" (PDF). Devon County Council. Archived from the original (PDF) on 12 November 2011. Retrieved 16 July 2024.
- ↑ "Future of Transport in Exeter Consultation". 23 March 2010. Archived from the original on 23 March 2010. Retrieved 17 July 2024.
- ↑ "Future of Transport in Exeter Display Panels" (PDF). Devon County Council. Archived from the original (PDF) on 18 October 2015. Retrieved 17 July 2024.
- ↑ "Future of Transport in Exeter Consultation and Discussion Final Report" (PDF). Devon County Council. Archived from the original (PDF) on 12 November 2011. Retrieved 17 July 2024.
- ↑ "Cranbrook train station opens today". Express & Echo. Exeter. 13 December 2015. Archived from the original on 14 December 2015. Retrieved 16 December 2015.
- ↑ "Newcourt: First train will stop at brand new Exeter railway station tomorrow". Exeter Express and Echo. Local World. 3 June 2015. Retrieved 4 June 2015.
- ↑ "Minister opens station and unveils sea wall plaque". BBC News Online. 3 July 2023. Retrieved 4 July 2023.
- ↑ "Trains restart on Dartmoor rail line after 49 years". BBC News. 20 November 2021. Retrieved 20 November 2021.
- ↑ "Okehampton Interchange passenger services to begin this weekend". The Okehampton Times. 28 July 2026. Retrieved 31 July 2026.
- ↑ "Green light for over 50 road and rail upgrades supporting over 39,000 new homes and 42,000 jobs". GOV.UK. 8 July 2025. Retrieved 15 July 2025.
- ↑ "Work begins on spine road which will serve new railway station". Somerset County Gazette. 6 March 2026. Retrieved 5 August 2026.
- ↑ "Origin destination matrix report". railwaydata.co.uk. Retrieved 15 September 2026.
ODM results for Exmouth
- ↑ "Origin destination matrix report". railwaydata.co.uk. Retrieved 15 September 2026.
ODM results for Paignton
- ↑ "Origin destination matrix report". railwaydata.co.uk. Retrieved 15 September 2026.
ODM results for Newton Abbot
- ↑ "Greater Exeter Strategic Plan" (PDF). Mid Devon District Council. Archived (PDF) from the original on 5 July 2022. Retrieved 16 July 2024.
- 1 2 "D1 train times (May 2026)" (PDF). Great Western Railway. Retrieved 25 July 2026.
- ↑ "About the line". Avocet Line Rail Users Group. Retrieved 14 September 2026.
- 1 2 "GWR D2 Train Times - 17 May to 12 December 2026" (PDF). Great Western Railway. Retrieved 1 August 2026.
- ↑ "Dartmoor Line". Devon and Cornwall Rail Partnership. Retrieved 14 September 2026.
- ↑ "Exeter, Yeovil and Salisbury to London Waterloo - Timetable 20 (May 2026)" (PDF). South Western Railway. Retrieved 25 July 2026.
- ↑ "East Devon Line". Devon and Cornwall Rail Partnership. Retrieved 14 September 2026.
- ↑ "Riviera Line". Devon and Cornwall Rail Partnership. Retrieved 14 September 2026.
- ↑ "Tarka Line". Devon and Cornwall Rail Partnership. Retrieved 14 September 2026.