Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a24e88583af6e6b0

Jump to content

// Workers AI · dad joke modeWhat did contingency allowance say? "I'm allowed to happen

From Wikipedia, the free encyclopedia

The contingency allowance is the time allocated during planning for unscheduled events. Technical and personal disruptions result in changes in the indirect production costs. The contingency allowance is calculated in special contingency time studies, the results of which yield rates for indirect production costs.[1] The time is usually added to the pure operations time to form a standard time in manufacturing.

The concept was developed by Charles Bedaux.

References

[edit]
  1. Poeschel, Frank: Verteilzeit. In: Landau, Kurt (Hrsg.): Lexikon Arbeitsgestaltung : Best Practise im Arbeitsprozess. Stuttgart: Genter, 2007. - ISBN 978-3-87247-655-5. P. 1292.