Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a23a89cefec65b65

Jump to content

Colnic mine

Colnic
Colnic Gold Mine is located in Romania
Colnic Gold Mine
Colnic Gold Mine
Location in Romania
Location
Productionapprox 113,000
Financial year2009
CompanyEuro Sun Mining
Website
Acquired2005

The Colnic mine is a large open pit mine in the west of Romania in Hunedoara County, 30 km north of Deva and 400 km north of the capital, Bucharest. Colnic represents a large gold and copper deposit with estimated reserves of 2.15 million oz of gold and 135,000 tonnes of copper.[1] The project is owned by the Toronto-based company Euro Sun Mining.

The project will involve the mining and processing of 14.4 million tonnes of ore per annum over an open pit life of 19 years. The open pit is expected to yield approximately 113,000 oz of gold and 7,100 tonnes of copper per year in doré, reflecting an average total process recovery of 68% for gold and approximately 91% for copper.[2]

References

[edit]
  1. "Colnic mine" (in Romanian). Carpathian Gold. 2009. Retrieved 2010-09-09.[permanent dead link]
  2. "RVP Project Parameters" (PDF). Carpathian Gold. 2009. Retrieved 2010-09-09.
[edit]