Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a248f1fd198c7089

Jump to content

// Workers AI · dad joke modeWhy did Chandni Chowk Flyover go to therapy? It had high anxiety.

Chandni Chowk Flyover
Map
Interactive map of Chandni Chowk Flyover
Location
Rawalpindi, Pakistan
Coordinates33°37′51″N 73°04′20″E / 33.630844507644206°N 73.07230454039046°E / 33.630844507644206; 73.07230454039046
Roads at
junction
Murree Road
Rawal Road
Construction
TypeFlyover
Lanes3 x 3
Constructedby NLC and Habib Construction Services
Opened11 March 2012 (2012-03-11)

Chandni Chowk Flyover is a flyover located in Rawalpindi in Punjab, Pakistan.

The construction of the flyover was started at a busy locality of Rawalpindi on 3 November 2011. Chandni Chowk is considered one of the most central locations of the city of Rawalpindi. On average, 128,900 vehicles pass through this junction daily, which causes traffic congestion issues, necessitating the flyover. The construction of the flyover at the junction ensures a smooth flow of traffic at the Murree Road and particularly at Chandni Chowk. The flyover was completed in 127 days at a cost of Rs. 1.25 billion.[1][2][3]

The length of the flyover is 403 metres, and it has three lanes each side. On an average, 128,900 vehicles pass through this junction daily and the flyover was planned to help solve the traffic mess on Benazir Bhutto Road (Murree Road), particularly at Chandni Chowk, which had been a great concern for motorists, transporters and commuters.

It opened on 11 March 2012.[3] Chandni Chowk is also famous due to food corner situated on its right side while entering from Islamabad

Construction details

[edit]
TypeDescription
Construction costPKR 1.25 billion[3]
Length403 meters
Construction period127 days
OwnerCommunication and Works Department Govt. of Punjab[4]
ConsultantEngineering Associates, Karachi
ContractorNLC and Habib Construction Services

See also

[edit]

References

[edit]
  1. Pakistani Newspaper Archived March 12, 2012, at the Wayback Machine
  2. Khattak, Inamullah (2012-03-10). "Chandni Chowk flyover opens: Much-hyped scheme seems a fiasco". Dawn. Retrieved 2025-12-25.
  3. 1 2 3 Raja, Mudassir (2012-03-11). "City uplift: Chandni Chowk Flyover opens to traffic". The Express Tribune. Retrieved 2025-12-25.
  4. Punjab Government