Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a458b4133e0bb965

Jump to content

Central Business Tower

From Wikipedia, the free encyclopedia
Central Business Tower under construction in June 2026

Central Business Tower is an under construction office skyscraper in Frankfurt, Germany. At a planned height of 205 metres (673 feet) and 52 storeys, the building will become the fifth-tallest building in Frankfurt upon its completion in 2027.[1] Construction on the building began in 2024.[2]

The high-rise was designed by architectural firm KSP Engel and features a twin-tower structure connected by a glass section. The building comprises a total of approximately 66,000 square meters of office space. It incorporates the heritage-listed building at the base—originally constructed between 1889 and 1892 by Ludwig Neher and Aage von Kauffmann—which is slated to house a branch of the Museum of World Cultures.[3] The anchor tenant is Commerzbank, which has leased the entire office space within the tower.[4]

See also

[edit]

References

[edit]

  1. ↑ "Frankfurt am Main - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2026-08-31.
  2. ↑ "Central Business Tower". SKYLINE ATLAS. Retrieved 2026-08-31.
  3. ↑ "Frankfurter Skyline wächst: Central Business Tower soll 2028 fertig sein". FAZ.NET (in German). 2021-11-09. Retrieved 2026-08-31.
  4. ↑ "Helaba vermietet Büroturm in Frankfurt vollständig an die Commerzbank". helaba.com (in German). Retrieved 2026-08-31.