Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a41bc1331f37b36e

Jump to content

Cannonball Path

From Wikipedia, the free encyclopedia
Cannonball Path
Length4 mi (6.4 km)
LocationDane County, Wisconsin
TrailheadsFish Hatchery Rd, Madison, Wisconsin
Arrowhead Park, Fitchburg, Wisconsin

Cannonball Path is a 4-mile long shared-use trail in Madison, Wisconsin. It runs on a former Chicago and North Western railway line. The trail begins at a junction with the Military Ridge State Trail, Southwest Bike Path, Badger State Trail, and Capital City State Trail. It ends at Fish Hatchery Road and will eventually connect to the existing Wingra Creek Bike Trail.[1][2]

The first phase of the Cannonball Path was completed in 2011.[3] It was cited as having the first bicycle roundabout in the Madison area.[4] The path also includes a bridge that goes over the Beltline.[5]

In 2014, Adams Outdoor Advertising sued the city of Madison alleging the path's infrastructure blocked the view of one of its billboards. The case was dismissed, with the Wisconsin Court of Appeals upholding the dismissal in 2017.[6] The Wisconsin Supreme Court further upheld the dismissal in 2018.[7]

The path, which connects Fitchburg with Madison, has had multiple proposed plans to connect further to the Wingra Creek Path. The Wisconsin Office of the Commissioner of Railroads rejected the first plan for the extension, as they would have involved railroad crossings. In 2024, it was reported that the city would not be proceeding with an appeal of the decision.[8] In 2026, plans were approved with alternate route which connects along Fish Hatchery Road instead of along the railroad.[9] Construction work to connect the two paths began in August 2026.[10][11]

References

[edit]
  1. ↑ "Cannonball Path | Wisconsin Trails | TrailLink".
  2. ↑ Elbow, Steven (2014-01-15). "Fish Hatchery, bike path link set this year, completion in 2015". The Capital Times. p. 10. Retrieved 2025-05-02.
  3. ↑ Novak, Bill (2011-12-08). "A safer link to Fish Hatchery". Wisconsin State Journal. p. 3. Retrieved 2025-05-02.
  4. ↑ Elbow, Steven (2014-07-23). "Cannonball Path to have first bike roundabout". The Capital Times. p. 11. Retrieved 2025-05-02.
  5. ↑ Novak, Bill (2013-08-28). "Beltline to close overnight for bridge work". Wisconsin State Journal. pp. 17. Retrieved 2025-05-02.
  6. ↑ Mosimon, Dean (2017-07-22). "Wis. Court of Appeals affirms case dismissal". Wisconsin State Journal. pp. C1. Retrieved 2025-05-02.
  7. ↑ Treleven, Ed (2018-06-20). "Court sides with Madison over sign". Wisconsin State Journal. pp. A1A6. Retrieved 2025-05-02.
  8. ↑ Beran, Liam (2024-08-16). "Madison won't appeal decision against Cannonball bike path extension". Isthmus Magazine. Retrieved 2025-05-02.
  9. ↑ Peek, Jenny (2 January 2026). "Madison plans to connect 2 major bike paths to improve safety". WPR.
  10. ↑ "Cannonball Path Phase 6". www.cityofmadison.com. 14 April 2016.
  11. ↑ Wiebe, George (17 August 2026). "Fish Hatchery Road to be reduced to 2 lanes starting Monday". Wisconsin State Journal.