// Workers AI · dad joke modeIs Aeolos Kenteris II a fast runner? He's a breeze.
Aeolos Kenteris II underway in 2007 | |
| History | |
|---|---|
| Name |
|
| Owner |
|
| Operator |
|
| Port of registry | Mytilene, |
| Route |
|
| Ordered | 1999 |
| Builder | Alstom Leroux Naval (Lorient/Saint-Malo, France) |
| Yard number | 826 |
| Launched | 4 March 2001 |
| Completed | 11 July 2001 |
| Acquired | 2001 |
| Maiden voyage | 2001 |
| In service | 2001 |
| Out of service | 2011 |
| Identification |
|
| Fate | Seized by port authorities; laid-up; scrapped in Aliağa, 2026 |
| Notes | Named after Aeolus and Kostas Kenteris |
| General characteristics | |
| Class & type | Corsaire 11500 (STX Alstom Leroux Naval) |
| Tonnage |
|
| Length | 103.0 m (337 ft 11 in) |
| Beam | 15.7 m (51 ft 6 in) |
| Draft | 2.7 m (8 ft 10 in) |
| Installed power |
|
| Propulsion | 4x Waterjets (Kamewa) |
| Speed |
|
| Capacity |
|
Aeolos Kenteris II was a ferry, owned by the Greek shipping company NEL Lines. Built in France in 2001, the vessel was part of a trio of highspeed sister ships commissioned by NEL Lines to operate in the Aegean.
Service
[edit]The ferry, the second high-speed vessel commissioned by NEL Lines, was launched on 4 March 2001 at the Chantiers Alstom Leroux Naval shipyards in Saint-Malo with the name Aeolos Express II and delivered on 23 July to the Greek company, for which it began service two days later on the connections between Piraeus and the islands of Kea, Paros, Naxos, Ios and Santorini and those of Syros, Tinos, Mykonos and Amorgos. However, after just three years of service, at the end of the 2004 summer season the ferry was already laid up together with Aeolos Express in Lavrion due to excessive operating costs and some engine problems, and was then transferred back on 11 May 2006 to the Perama shipyards, where she remained until 2007, when she was re-engined and renamed Aeolos Kenteris II on 31 March 2007.[1] After the technical stop, the ferry then returned to service for the summer season on the routes between Piraeus, Paros and Naxos, where she had been missing for three years.[2]
On 22 April 2008, while undergoing evolution manoeuvres in Piraeus during sea trials in preparation for her return to service in the summer, the ferry collided with Rodanthi, suffering minor damage to the waterjets, which were quickly repaired, allowing the vessel to return to service in May on the routes between Piraeus, Syros, Tinos and Mykonos, where she operated until July, when she was chartered to the Egyptian Namma Lines and used on the routes between Safaga and Jeddah. At the end of the summer season she returned to the Aegean, where she replaced Panagia Tinou on the inter-Cycladic routes between Lavrion, Kea, Kythnos, Andros, Tinos, Syros, Paros, Naxos, Donoussa, Amorgos, Koufonisia, Schoinoussa, Irakleia, Folegandros, Sikinos, Ios, Thirasia, Santorini and Anafi.[3] On 29 August 2011, when she was transferred to the route of her fleetmate Aqua Spirit, the ferry was decommissioned in Ampelakia[4][5] and shortly thereafter seized due to the failure to pay off debts at the time of the bankruptcy of NEL Lines in 2015.[6] On 26 June 2026, after eleven years in a state of abandonment, the ferry was sold for demolition to the Aliağa shipyards. On 10 July 2026 the vessel arrived at the breakers yard.[7]
References
[edit]- ↑ "HSC Aeolos Kenteris II — The Ferry Site". www.ferry-site.dk. Retrieved 2026-07-13.
- ↑ "Aeolos Kenteris II". greekpassengerships. Retrieved 2026-07-13.
- ↑ "Aeolos Express II (2001-2007), IMO 9234757". www.faergelejet.dk. Retrieved 2026-07-13.
- ↑ "HSC AEOLOS EXPRESS II (2001)". faktaomfartyg.se. Retrieved 2026-07-13.
- ↑ Lila (2017-07-16). "Αίολος Κεντέρης Ι και ΙΙ. Δείτε από ψηλά που κατέληξαν τα πιο γρήγορα πλοία του Αιγαίου. Στιγματίστηκαν από καταγγελίες για ατυχήματα που προκαλούσαν τα απόνερα στις ακτές". ΜΗΧΑΝΗ ΤΟΥ ΧΡΟΝΟΥ (in Greek). Retrieved 2026-07-13.
- ↑ "Πού βρίσκονται σήμερα τα δύο «αδερφάκια» του «Αίολος Κεντέρης»". www.agriniopress.gr/ (in Greek). 2024-09-23. Retrieved 2026-07-13.
- ↑ "Weekly Vessel Scrapping Report 2026: Week 26". Ship & Bunker. Archived from the original on 2026-07-03. Retrieved 2026-07-13.