Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25ed9710bac64c2

Jump to content

// Workers AI · dad joke modeWhat did ATLO say to its date? "You're at low odds of resisting me".

From Wikipedia, the free encyclopedia
Mars Science Laboratory Assembly, Test and Launch Operations (ATLO) at JPL

In aerospace, Assembly, Test, and Launch Operations (ATLO), also known as Mission System Integration and Test (MSIT) is the phase of a spacecraft project that comprises building the spacecraft, testing it, and getting it launched.[1]

Project Manager John Wirth with Flight Technician Kieran McKay with NASA's ISS-RapidScat.

Pictured to the right is John Wirth (left) and Kieran McKay (right) at Kennedy Space Center with ISS-RapidScat, the radar scatterometer which was built at JPL. Specifically, they were testing the rotating radar's capabilities at the Space Station Processing Facility.[2]

References

[edit]
  1. Steven W. Squyres (2005). ROVING MARS: SPIRIT, OPPORTUNITY, AND THE EXPLORATION OF THE RED PLANET. Hyperion. pp. 142. ISBN 1-4013-0149-5.
  2. "NASA Image and Video Library". NASA Image and Video Library. Retrieved 2024-02-14.