Edge Rewrite
// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a29d8175eda4b5b3

Jump to content

Kembangan MRT station

(Redirected from Kembangan station)

Kembangan
EW6
景万岸[1]
கெம்பாங்கான்[2]
Platform level of Kembangan MRT station
General information
Location55 Sims Avenue East
Singapore 416551[3]
Coordinates1°19′16″N 103°54′48″E / 1.32111°N 103.91333°E / 1.32111; 103.91333[3]
SystemMass Rapid Transit (MRT) station
OwnerLand Transport Authority (LTA)[4]
OperatorSMRT Trains
Line
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, taxi[5]
Construction
Structure type
Elevated
Platform levels
1
Cycle facilities
Yes
AccessibleYes
History
Opened4 November 1989; 36 years ago (1989-11-04)
Closed21 and 28 January 2018; 8 years ago (2018-01-28)[a]
Former namesFrankel
Passengers
June 20249762 per day[6]
Services
Preceding station Mass Rapid Transit Following station
Bedok
towards Pasir Ris
East–West Line Eunos
towards Tuas Link
Location
Kembangan is located in Singapore Rail
Kembangan
Kembangan
Location within Singapore Rail

Kembangan MRT station (/kəmˈbɑːŋɑːn/ kəm-BAHNG-ahn) is an elevated Mass Rapid Transit (MRT) station on the East–West Line (EWL) in Bedok, Singapore. Operated by SMRT Trains, the station serves the eponymous Kembangan subzone of Bedok. Other nearby landmarks include the Kembangan Community Club and the Masjid Kassim.

First announced in May 1982 as Frankel, the station was constructed as part of Phase II of the MRT system. The name was later changed in 1983. Kampongs Kembangan and Pachitan were acquired for the station's construction. It commenced operations on 17 December 1988 along with the other stations on the Tanah MerahPasir Ris Stations stretch. Half-height platform screen doors and high-volume low-speed fans were installed by August 2011 and the first quarter of 2013, respectively.

Like many stations of the EWL eastern stretch, the station has a dome-shaped segmented roof. As a part of a heritage-themed art exhibition, there are two murals by students from St. Joseph's Institution displayed in the station, which details the history of nearby landmarks.

History

[edit]
The exterior of Kembangan station

The Mass Rapid Transit (MRT) system was conceptualised in a 1971 study conducted by the Singapore Government and the United Nations Development Programme. The study – which assessed land-use transportation needs – concluded that Singapore would need a rail transit system by 1992.[7] Further studies and debates on the feasibility of building a rapid transit system took place from 1972 to 1980,[8] with Chai Chee station appearing in initial plans by May 1982.[9] Frankel was proposed to be constructed as part of the 32.6 kilometres (20.3 mi) East–West Line (EWL), which was to have 22 stations and run from Jurong West to Bedok.[9][10] On 30 May 1982, communications minister Ong Teng Cheong confirmed that the government approved construction of the MRT;[11] Frankel station was renamed to Kembangan by October 1983.[12] The system was planned to be constructed in three phases,[13] with Kembangan part of "Phase II", which was 32.6 kilometres (20.3 mi) long and composed of 22 stations.[12][b] Phase II would be constructed in different sections, with Kembangan specifically part of "Phase IIA", which consisted of 13 stations from City Hall to Pasir Ris.[15] Stations under Phase II were planned to start construction while Phase I stations are under construction to ensure that the MRT would be fully open by the early 1990s.[12]

From May to June 1984, the Mass Rapid Transit Corporation (MRTC) called for the prequalification of consultants to design the civil, architectural, and structural works for Phase IIA stations.[16] Ten companies were shortlisted by July,[17] and the contract was awarded to an American–Singapore consortium between De Leuw Cather, Wilbur Smith & Associates, Skidmore Owings Merrill, and Singaporean firm RSP Architects in October for S$11.5 million (1984) (US$5.39 million).[18] The Straits Times reported in November that Phase II was ahead of schedule by two years due to the successful timing for Phase I.[19] By May 1985, there were several tenderers shortlisted for Contracts 303 and 304: seven prequalified for Contract 303, which covered the construction of viaducts from Eunos station to Kembangan station, while seven were prequalified for Contract 304, which covered the construction of Kembangan and Bedok stations.[20][21] Ultimately, Contract 303 was awarded to a Japanese–Singaporean joint venture between Okumura Corporation and Oh Teck Thye for S$60 million (1985) (US$27.27 million) in December 1985 while Contract 304 was awarded to a partnership between Obayashi Corporation and Resources Development Pte Ltd for S$70 million (1986) (US$32.15 million) in January 1986.[22][23]

Construction of Kembangan station began in March 1986.[24] To construct the station, Kampongs Kembangan and Pachitan were acquired.[25] The subcontract for the supply of post-tension cables and pre-cast beams for the viaducts was awarded to Swiss company VSL Systems in July 1986.[26] On 30 December 1986, the joint venture for Contract 303 was terminated, with Okumura taking over the project.[27] It was later disclosed that Oh Teck Thye was placed under receivership when it failed to repay its debts.[28][29] Although stations in the City Hall–Changi stretch were initially expected to commence operations by December 1989,[30] The Straits Times reported in February 1989 that Phase IIA was ahead of schedule and could commence operations in the last quarter of the year.[31] Civil works for Kembangan station were fully completed by April 1989 and from August, test runs were conducted on the City Hall–Tanah Merah[c] stretch to check the trains and tracks.[33][34] By then, communications minister Yeo Ning Hong announced that stations within the City Hall–Tanah Merah stretch would open on 18 November,[35] though the opening date was moved to 4 November in September as the test runs were ahead of schedule.[36] Kembangan, along with other stations between Marina Bay and Tanah Merah, opened on 4 November 1989.[37][38]

On 22 March 1997, a man jumped in front of an oncoming west-bound train, where he sustained head, arm, and foot injuries. The man was pronounced dead afterwards. Train services between Eunos and Tanah Merah stations were disrupted for two hours.[39] Following an increase in track intrusions, the Land Transport Authority (LTA) and SMRT decided to install platform screen doors at all elevated MRT stations.[40] After several successful tests at different stations, works to install half-height platform screen doors were expected to start in 2010;[41] they were installed at Kembangan station by August 2011.[42] High-volume low-speed fans were installed in the station by the first quarter of 2013.[43]

Details

[edit]

Kembangan station is on the EWL with the station code of EW6, situated between Bedok and Eunos station.[44] Under the New Rail Financing Framework, it is owned by the Land Transport Authority.[45] The station had the code E6 at opening[46] and received its current station code in August 2001 as part of a system-wide campaign to cater to the expanding MRT system.[47][48] The station is elevated and like many stations on the initial MRT network, has an island platform configuration.[49][50] As part of the EWL, Eunos is operated by SMRT Trains.[51] The station operates around 5:40 am to 12:30 am daily, with train frequencies varying from 2 to 5 minutes.[52][53]

Kembangan is a two-story, elevated station.[54] The station's concourse, 1 metre (3.3 ft) above ground, has a ticketing office and the electrical and mechanical plant rooms whilst its platforms are 8.5 metres (28 ft) above the concourse and are built in the island platform configuration.[55][54] Both floors are column-free, with the platforms intended to give commuters ease of movement.[54] The station runs alongside Sims Avenue East and has two exits serving amenities in the area such as Kampong Kembangan Community Club (Kembangan CC), Masjid Kassim, and Bethesda Chapel.[56][5] It is also wheelchair-accessible and has bicycle facilities.[5][57]

Similar to most Phase IIA stations, Bedok has a dome-shaped roof.[58][54][d] The roof – which spans 23 metres (75 ft) across the platform and tracks – is made of a 7 metres (23 ft) high parabolic arched canopy supported by 25 precast concrete ribs at 6.25 metres (20.5 ft) centres, with a 150 millimetres (5.9 in) thick roof slab between the ribs.[60] The design was an attempt by the MRT Corporation (MRTC) to give the stations on the EWL an "attractive look",[61] with The Straits Times comparing it to a caterpillar in one article and a rib cage in another article.[62][63] Additionally, as a part of SMRT's heritage-themed artwork showcase Comic Connect, the station features two murals created by students from St. Joseph's Institution.[64] The first mural depicts the Church of Our Lady of Perpetual Succour (OLPS) and Kembangan CC while the second mural depicts Masjid Kassim and the site of the Buddhist Union.[65][66] The creation process took 10 months, with the mural unveiled in February 2024.[66][67]

Notes

[edit]
  1. Track works and testing for a new signalling system.
  2. Although previous studies concluded that the EWL should be constructed first, the government chose to construct the North–South Line (NSL) first, another line proposed in those studies, though The Straits Times noted that this would not imply that the NSL would have to be built first before the EWL can begin construction.[14]
  3. Changi station was renamed to Tanah Merah in March 1987.[32]
  4. The exception is Eunos, which has a traditional Malay-style roof.[59]

References

[edit]
  1. "System Map" (PDF). LTA (in Chinese). Archived (PDF) from the original on 10 December 2024. Retrieved 20 December 2024.
  2. "System Map" (PDF). LTA (in Tamil). Archived (PDF) from the original on 13 December 2024. Retrieved 20 December 2024.
  3. 1 2 "Kembangan MRT Station". Onemap. Singapore Land Authority (SLA). Archived from the original on 12 June 2025. Retrieved 11 June 2025.
  4. "New Rail Financing Framework". Land Transport Authority. 1 January 2022. Retrieved 29 March 2025.
  5. 1 2 3 "Kembangan–Map". SMRT Journeys. Archived from the original on 15 October 2024. Retrieved 21 February 2025.
  6. "Land Transport DataMall". mytransport.sg. Land Transport Authority. Retrieved 14 August 2024.{{cite web}}: CS1 maint: deprecated archival service (link)
  7. Richmond 2008, pp. 364–365.
  8. Richmond 2008, pp. 365–367.
  9. 1 2 "Proposed MRT Stations". The Straits Times. 23 May 1982. p. 1. Retrieved 23 September 2024 via NewspaperSG.
  10. "You May Be Able to Ride on a Train as Early as 1988". The Straits Times. 26 May 1982. p. 14. Retrieved 4 July 2026 via NewspaperSG.
  11. "Go-Ahead For MRT: Work Starts in '84". The Straits Times. 30 May 1982. p. 1. Retrieved 2 July 2026 via NewspaperSG.
  12. 1 2 3 "From Kembangan to Pasir Ris". The Straits Times. 27 October 1983. p. 21. Retrieved 14 September 2024 via NewspaperSG.
  13. "Project to Go on Line in Three Stages". The Straits Times. 8 July 1986. p. 8. Retrieved 19 December 2020 via NewspaperSG.
  14. Dhaliwal, Rav (29 August 1982). "North–South Line off First". The Straits Times. p. 1. Retrieved 4 July 2026 via NewspaperSG.
  15. Dhaliwal, Rav (13 November 1984). "Earlier Target Date for Phase II MRT". The Straits Times. p. 48. Retrieved 4 July 2026 via NewspaperSG.
  16. "MRT Seeks Design Advice for Next Two Phases". The Business Times. 19 May 1984. p. 1. Retrieved 3 July 2026 via NewspaperSG.
  17. Lee, Lisa (6 July 1984). "MRTC to Offer Three More Contracts to Pre-Qualified Groups". The Business Times. p. 16 via NewspaperSG.
  18. "Singapore-Us Consortium Clinches $11m MRT Design Contract". The Business Times. 3 October 1984. p. 1. Retrieved 3 July 2026 via NewspaperSG.
  19. Loh, Hui Yin (13 November 1984). "Work on Second Phase of MRT System Ahead of Schedule". The Business Times. p. 1. Retrieved 3 July 2026 via NewspaperSG.
  20. Yap, Boh Hoon (13 May 1985). "MRTC prequalifies 37 for 11 engineering contracts". The Business Times. p. 1. Retrieved 7 October 2024 via NewspaperSG.
  21. "List of pre-qualified contractors — MRT Phase IIA, IIB". The Business Times. 14 May 1985. p. 3. Retrieved 6 October 2024 via NewspaperSG.
  22. Lim, Soon Neo (17 December 1985). "Japanese-local venture wins $60m MRT deal". The Business Times. p. 3. Retrieved 6 October 2024 via NewspaperSG.
  23. "MRTC awards two jobs on eastern line". The Business Times. 14 January 1986. p. 2. Retrieved 27 June 2024 via NewspaperSG.
  24. Lim, Edward (18 December 1987). "MRT will only come to the East in 1990". Weekend East. p. 12. Retrieved 6 October 2024 via NewspaperSG.
  25. Osman, Ahmad (7 April 1985). "No tears as residents say goodbye to their kampung". The Straits Times. p. 11. Retrieved 3 July 2025 via NewspaperSG.
  26. "VSL Systems clinches MRT supply deals". The Business Times (Singapore). 8 July 1986. p. 2. Retrieved 20 September 2024 via NewspaperSG.
  27. "Page 12 Advertisements Column 1". The Business Times (Notice). 28 January 1987. p. 12. Retrieved 6 October 2024 via NewspaperSG.
  28. Raj, Conrad (13 February 1987). "Oh Teck Thye placed in the hands of receivers". The Straits Times. p. 24. Retrieved 6 October 2024 via NewspaperSG.
  29. Lim, Soon Neo (5 February 1987). "Parting of the ways for two MRT venture partners". The Business Times. p. 1. Retrieved 6 October 2024 via NewspaperSG.
  30. Dhaliwal, Rav (28 April 1987). "Getting to Know the Network and How It Will Work". The Straits Times. p. 19. Retrieved 19 December 2020 via NewspaperSG.
  31. "Eastern MRT Line May Open Before Xmas". The Straits Times. 15 February 1989. p. 1. Retrieved 3 July 2026 via NewspaperSG.
  32. Dhaliwal, Rav (27 March 1987). "Five MRT Stations Renamed to Better Reflect the Locality". The Straits Times. p. 19. Retrieved 10 July 2026 via NewspaperSG.
  33. "SMRT Optimistic Despite $30 Million Loss Last Year". The Straits Times. 27 April 1989. p. 17. Retrieved 3 July 2026 via NewspaperSG.
  34. "Tests on MRT Eastern Line". The Straits Times. 1 August 1989. p. 20. Retrieved 10 July 2026 via NewspaperSG.
  35. Dhaliwal, Rav (4 August 1989). "MRT's Eastern Line May Start Nov 18". The Straits Times. p. 1. Retrieved 10 July 2026 via NewspaperSG.
  36. Nathan, Dominic (10 September 1989). "MRT Trains Will Roll to Tanah Merah on Nov 4". The Straits Times. p. 3. Retrieved 10 July 2026 via NewspaperSG.
  37. "East-Enders Get Ticket to Ride as MRT Opens Line". The Straits Times. 4 November 1989. p. 23. Retrieved 10 October 2024 via NewspaperSG.
  38. "Enthusiastic Commuters Keep New Eastern Line Busy". The Straits Times. 5 November 1989. p. 14. Retrieved 4 July 2026 via NewspaperSG.
  39. "Man dies after jumping in front of MRT train". The Straits Times: Weekly Overseas Edition. 22 March 1997. p. 7. Retrieved 22 February 2025 via NewspaperSG.
  40. Wong, Siew Ying (26 January 2008). "Above-Ground MRT Stations to Have Platform Screen Doors by 2012". Channel NewsAsia. Archived from the original on 28 January 2008. Retrieved 1 February 2012.
  41. "Installation of Half Height Platform Screen Doors Pasir Ris Station". Land Transport Authority. 12 August 2009. Archived from the original on 30 November 2009. Retrieved 30 November 2009.
  42. "Completion of Half Height Platform Screen Doors on East West Line". Land Transport Authority. 31 August 2011. Archived from the original on 26 July 2018. Retrieved 4 October 2024.
  43. "Enhancing Connectivity and Comfort for Commuters". LTA. 13 October 2011. Retrieved 14 September 2024.{{cite web}}: CS1 maint: deprecated archival service (link)
  44. "System Map" (PDF). Land Transport Authority. Archived (PDF) from the original on 25 June 2024. Retrieved 23 June 2024.
  45. "New Rail Financing Framework". Land Transport Authority. 1 January 2022. Archived from the original on 3 July 2026. Retrieved 29 March 2025.
  46. "Going to N1, B3, W11, El2, Anyone?". The Straits Times. 25 October 1985. p. 21. Retrieved 19 November 2024 via NewspaperSG.
  47. Salim, Shazalina (3 August 2001). "Red, Green and Grey". Today. p. 9. Retrieved 15 December 2024 via NewspaperSG.
  48. "New Signage System for MRT and LRT Network". Land Transport Authority. Archived from the original on 1 August 2003. Retrieved 15 December 2024.
  49. Dhaliwal, Rav (28 April 1987). "Getting to know the network and how it will work". The Straits Times. p. 19. Retrieved 19 December 2020 via NewspaperSG.
  50. "MRT will only come to the East in 1990". Weekend East. 18 December 1987. p. 12. Retrieved 6 October 2024 via NewspaperSG.
  51. "Rail Network – This is the Rail Life". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 27 April 2021.
  52. "Kembangan – First & Last Train". SMRT Journeys. Archived from the original on 26 April 2025. Retrieved 21 February 2025.
  53. "LTA | Transport Tools | MRT/LRT". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 11 May 2020.
  54. 1 2 3 4 Hulme et al. 1989, p. 764.
  55. Dhaliwal, Rav (28 April 1987). "Getting to Know the Network and How It Will Work". The Straits Times. p. 19. Retrieved 19 December 2020 via NewspaperSG.
  56. "Kembangan – Exits". SMRT Journeys. 9 October 2024. Archived from the original on 21 February 2025. Retrieved 9 October 2024.
  57. "Kembangan – Amenities". SMRT Journeys. Archived from the original on 21 February 2025. Retrieved 21 February 2025.
  58. "Roof to make heads turn". The Straits Times. 20 April 1986. Retrieved 12 December 2020.
  59. Hulme, Potter & Shirlaw 1989, p. 766.
  60. Hulme et al. 1989, pp. 764–765.
  61. "Roof to make heads turn". The Straits Times. 20 April 1986. Archived from the original on 12 December 2020. Retrieved 12 December 2020.
  62. "Roof to make heads turn". The Straits Times. 20 April 1986. Archived from the original on 12 December 2020. Retrieved 12 December 2020.
  63. "Residents get sneak preview of three new MRT stations". The Straits Times. 15 December 1989. p. 32. Retrieved 9 October 2024 via NewspaperSG.
  64. "Commuters & Communities – Comic Connect". SMRT. Archived from the original on 6 October 2024. Retrieved 6 October 2024.
  65. "Life in Kembangan" (PDF). SMRT (File). Archived (PDF) from the original on 8 October 2024. Retrieved 6 October 2024. Our Lady of Perpetual Succour (OLPS) and Kembangan Community Centre (KCC) are part of the surrounding environs of Kembangan station... within walking distance of Kembangan station are two faith landmarks that serve the community. This mural is a visual celebration of both the geometric architectural motifs found within Masjid Kassim, as well as the iconography that distinguishes the main template space of the Buddhist Union
  66. 1 2 Tushara, Elisha (17 November 2024). "Art on the Go: Singapore's Rich Heritage on Display at MRT Stations". The Straits Times (Interactive graphic). Archived from the original on 11 July 2026. Retrieved 16 July 2026.
  67. Deng, Weiting (7 February 2024). 景万岸地铁站壁画 展现区内多元和谐氛围. Lianhe Zaobao. Archived from the original on 16 July 2026. Retrieved 16 July 2026.

Sources

[edit]
[edit]

Wikimedia Commons logo Media related to Kembangan MRT Station at Wikimedia Commons