Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2234d56eb653a24

Jump to content

// Workers AI · dad joke modeWhat did the WAP-7 say to its train car? "You're on the right track.

From Wikipedia, the free encyclopedia
(Redirected from WAP 7)

WAP-7
Vijayawada based WAP-7 at BZA ELS.
Type and origin
Power typeElectric
Builder
Build date1999–2023 (CLW)

2016–present (BLW)

2017–present (PLW)
Total produced2288 as of July 2026
Specifications
Gauge5 ft 6 in (1,676 mm)
BogiesCo-Co, Fabricated Flexicoil Mark IV bogies; bogie wheelbase 1,850 mm (72+78 in) + 1,850 mm (72+78 in)
Wheel diameter1,092 mm (43 in) new, 1,016 mm (40 in) worn
Wheelbase15,700 mm (51 ft 6+18 in)
Length:
  Over beams20,562 mm (67 ft 5+12 in)
Width3,152 mm (10 ft 4+18 in)
Height:
  Pantograph4,255 mm (13 ft 11+12 in)
Axle loadWAP 7

20.5 t (20.2 long tons; 22.6 short tons)[1]

WAP 7HS 18.08 t (17.79 long tons; 19.93 short tons)[citation needed]

WAP 7AD

20.5 t (20.2 long tons; 22.6 short tons)[1]
Loco weight123 t (121 long tons; 136 short tons)[1]
Power supply3-phase 2180 V 50 Hz
Electric system/s25 kV 50 Hz AC Overhead
Current pickupPantograph
Traction motors6FRA 6068 3-phase squirrel-cage induction motors
850 kW (1,140 hp), 2180 V, 1283/2484 rpm, 270/310A;
Weight-2,100 kg (4,600 lb), forced-air ventilation, axle-hung, nose-suspended;
Torque 6,330–7,140 N⋅m (4,670–5,270 lbf⋅ft)
~88% efficiency.
TransmissionElectric
Gear ratioWAP 7
72:20
WAP 7HS
70:22
WAP 7AD
175:20
Loco brakeAir and regenerative
Train brakesAir
Performance figures
Maximum speed140 km/h (87 mph) (WAP-7)

160 km/h (99 mph) (WAP-7HS) 180 km/h (110 mph) (WAP-7AD)

Potential speed: 200 km/h (120 mph) (WAP-7AD) 180 km/h (110 mph) (WAP-7HS)

155 km/h (96 mph) (WAP-7)
Power outputMax Power : 6,350 hp (4,740 kW)
Continuous: 6,120 hp (4,563.68 kW)
Tractive effortStarting: 322.4 kN (72,500 lbf)
Continuous: 228 kN (51,000 lbf) at 71 km/h
Career
OperatorsIndian Railways
Numbers
  • 30201-30829 CLW
  • 37001-37999 & 45000+ BLW
  • 39000+ PLW
LocaleAll over India
First run19 May 2000

The Indian locomotive class WAP-7 is a class of 25 kV AC electric locomotives that was developed in 1999 by Chittaranjan Locomotive Works (CLW) for Indian Railways. Its class designation denotes a broad gauge (W) alternating current (A) passenger (P) locomotive of the 7th generation (7). They entered service in 2000. WAP-7 locomotives are being built at CLW, Banaras Locomotive Works (BLW) and Patiala Locomotive Works (PLW).

The WAP-7 has been serving passengers for Indian Railways since their introduction in 1999. It is a passenger variant of the WAG-9 freight locomotive with a modified gear ratio to pull lighter loads at higher speeds. With an output of 6,125 hp, it is the most powerful passenger locomotive in the Indian Railways fleet, and the most numerous passenger locomotive in India. The WAP-7 is capable of hauling 24 coach trains at speeds of 130 km/h.

History

[edit]

The WAP-7 is largely used by most regional zones of Indian Railways. As of October 2021, all of these are fitted with H-type transition couplers which are compatible with both screw coupling and centre-buffer coupling.[original research?] In February 2017, Banaras Locomotive Works built their first WAP 7 class locomotive.[2]

In 2019, a variant of the WAP-7, designated the WAP-7HS, was introduced for higher speeds. The WAP-7HS has a max speed of 180 km/h (110 mph), and is capable of hauling a 24-car train at 160 km/h (99 mph) as opposed to the 140 km/h (87 mph) of the original. Indian Railways plans to use the WAP-7HS for Shatabdi, Rajdhani, and Duronto express trains. However, as of September 2022, it has not been confirmed[according to whom?] if any others have been built, and the single completed WAP-7HS has remained[as of?] restricted to 130 km/h (81 mph) operation.[This paragraph needs citation(s)]

In 2025, a variant of the WAP-7, designated the WAP-7AD, was introduced with an aerodynamic design. The WAP-7AD has a maximum speed of 180 km/h (110 mph), and is capable of hauling a 24-car train at 160 km/h (99 mph), as opposed to the 140 km/h (87 mph) of the original. Indian Railways plans to use the WAP-7AD for Amrit Bharat Express and other Express trains. The first WAP-7AD 37873 entered service on September, 2025 hauling 12284 Ernakulam Duronto express. A pair of WAP-7AD, painted with Amrit Bharat livery are currently[as of?] parked at ICF, Chennai waiting for rake and route allotment.

A Tughlakabad based WAP-7AD #37873 at Thrissur.
A Sealdah based WAP-7 #39207 pulling Uttar Banga Express.

Head-on Generation (HOG)

[edit]
The HOG ports are equipped on loco's right side upper and left side down on Erode based WAP-7 at White Field railway station (Bengaluru).

Many locomotives of this class are fitted with head-on generation (HOG), eliminating the need for separate End-on Generation (EOG) sets or DG (Diesel Generator) sets to supply power to the train, thereby resulting in significant savings in maintenance and operating costs. HOG transfers electric power from the locomotive's pantograph to the coaches, unlike EOG, in which a power car equipped with a diesel generator capable of generating sufficient three-phase 50 Hz 415 V / 750 V AC (called 'head-end power') is provided at either end of the train rake to supply power.[3][4][5]

Locomotive sheds

[edit]
Zone Name Shed Code Quantity Introduction Year
WAP-7 WAP-7AB
Central RailwayAjniAQE732010
KalyanKYNE852019
PunePADX682023
Eastern RailwayHowrahHWHE1042012
SealdahSDAD502020
East Central RailwayGomohGMOE472000
BarauniBJUE62021
SamastipurSPJD5782022
East Coast Railway AngulANGE42026
Northern RailwayGhaziabadGZBE1622000
LudhianaLDHE462022
North Central RailwayKanpurCNBE1052019
North Eastern RailwayGondaGDDE202021
GorakhpurGKPL212024
IzzatnagarIZNE112024
Northeast Frontier RailwaySiliguriSGUD532024
New GuwahatiNGCD5182026
North Western RailwayBhagat Ki KothiBGKD782023
Southern RailwayErodeEDE1062017
RoyapuramRPME1262011
South Central RailwayLallagudaLGDE1602008
South Coast Railway VisakhapatnamWATE902016
VijayawadaBZAE832021
South Eastern RailwayTatanagarTATE542017
BondamundaBNDL192018
SantragachiSRCE542017
South East Central RailwayBhilaiBIAE262012
South Western RailwayKrishnarajapuramKJMD912019
HubballiUBLD302024
Western RailwayVadodaraBRCE1192016
ValsadBLEE922024
SabarmatiSBTD92026
West Central RailwayTughlakabadTKDE872013
ItarsiETE972018
Total227216
Total Locomotives Active as of July 2026[6]2299

See also

[edit]

References

[edit]
  1. 1 2 3 "[IRFCA] Indian Railways FAQ - AC Electric Locomotives".
  2. "Brief History of DLW". Ministry of Railways, Government of India. Archived from the original on 2 April 2019. Retrieved 30 December 2017.
  3. "Train had WAP-7 engine, 'black box' may reveal cause". The Indian Express. 9 August 2010. Retrieved 25 August 2012.[dead link]
  4. "Recent Developments". Chittaranjan Locomotive Works. Archived from the original on 10 May 2012. Retrieved 25 August 2012.
  5. Development of Electric locomotive with Head On Generation (HOG) facility (PDF) (Technical report). Research Design and Standards Organisation. Archived from the original (PDF) on 19 February 2018. Retrieved 1 May 2025.
  6. "e-Locos".
[edit]