Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a24ae0720e7e8043

Jump to content

// Workers AI · dad joke modeWhat did the South Link line say to its friend? You're a connected person.

From Wikipedia, the free encyclopedia
(Redirected from South-Link Line)

South Link line
Overview
Native name南迴線
Termini
Stations32
Service
TypeConventional railway
OperatorTaiwan Railway Corporation
History
Opened16 December 1991
Technical
Line length138.5 km (86.1 mi)
Number of tracks1 (predominantly)
Track gauge3 ft 6 in (1,067 mm)
Electrificationyes
Operating speed130 km/h (81 mph)
Route map

km
Station
(Up arrow Western Trunk line)
0.0
Pingtung
2.6
Guilai
4.9
Linluo
7.3
Xishi
11.0
Zhutian
15.1
Chaozhou
19.9
Kanding
22.3
Nanzhou
25.9
Zhen'an
29.1
Linbian
33.1
Jiadong
36.2
Donghai
40.3
Fangliao
45.6
Jialu
49.0
Neishi
53.9
Fangshan
84.1
Dawu
95.8
Longxi
104.2
Jinlun
115.2
Taimali
126.9
Zhiben
133.9
Kangle
138.5
Taitung
(Down arrow Eastern Trunk line)

The South Link line (Chinese: 南迴線; pinyin: Nánhuí Xiàn) is a line of the Taiwan Railway running across the southern tip of the island of Taiwan, connecting the eastern and western coasts. It is 98.2 km long, of which 81.4 km is single-track.[1]

The section between Nanzhou and Linbian railway stations was upgraded from a single-track railway to a dual-track railway while the other sections remains in single-track.[2] In conjunction with electrification works on the line, train platforms are being lengthened and upgraded with better facilities.

History

[edit]
A section of track on the South Link line

Japanese authorities had planned for a railway running between Pingtung and Taitung, but were unable to complete it before World War II ended. After the Kuomintang-led ROC government took control, surveys were completed in 1947, 1958, 1963, 1968, and 1976, delineating ten possible routes for the South Link Line. Construction began in July 1980, and was completed in November 1991. Upon its inauguration on 16 December 1991, the South Link line became the newest standard rail line operated by the TRA, and created an around-the-island railway network. The line began became accessible for public use in February 1992.[3]

In August 2009, sections of the line were badly damaged by floods triggered by Typhoon Morakot.[4] The line was reopened on 30 December 2009.[citation needed]

In September 2010, service was temporarily suspended due to Typhoon Fanapi.[5] The Taimali River (Chinese: 太麻里溪) had risen substantially and washed away 100 m (330 ft) of railway embankment. The line was reopened on 29 September 2010.[5] The Taiwan Railway Administration plans to spend an additional NT$240 million on a double-tracked, 520 m (1,710 ft) bridge over the Taimali River to avoid future problems with flooding.[5]

Electrification works on the final unelectrified section from Fangliao Station to Zhiben Station was completed in December 2020, with the first passenger services operating on 20 December 2020.[6]

Stations

[edit]
NameChineseTaiwaneseHakkaTransfers and notesLocation
Fangliao枋寮Pang-liâuPiông-liàu Taiwan Railway Pingtung Line FangliaoFangliaoPingtung
County
Jialu加祿Ka-lo̍kKâ-luk JialuFangshan
Neishi內獅Lāi-saiNui-sṳ̂ Least used station in Taiwan (2019)
Fangshan枋山Pang-soaⁿPiông-sân Southernmost railway station in Taiwan NeishiShizi
Fangye枋野Pang-iáPiông-yâ
Central Signal中央號誌Tiong-iong Hō-chìTûng-ông Ho-chì
Guzhuang Signal古莊號誌Kó͘-chng Hō-chìKú-chông Hō-chì ShangwuDawu Taitung
County
Dawu大武Tāi-búThai-vú Dawu
Longxi瀧溪Liông-kheLùng-hâi DuoliangTaimali
Jinlun金崙Kim-lunKîm-lûn Jinlun
Taimali太麻里Thài-mâ-líThai-mà-lî Dawang
Zhiben知本Ti-púnTî-pún ZhibenTaitung
Kangle康樂Khong-lo̍kKhông-lo̍k Kangle
Taitung臺東Tâi-tangThòi-tûng Taiwan Railway Taitung Line Yanwan

Note: Central Signal Station - Guzhuang Station passes through Daren of Taitung County, original set Pu'an Signal Station, now stop working.[clarification needed]

See also

[edit]

References

[edit]
  1. "Route Kilometers". Taiwan Railways Administration. 18 May 2009. Archived from the original on 2 May 2010.
  2. Shelley Shan (29 October 2019). "Railways to be fully electrified in 2020". Taipei Times. Archived from the original on 29 October 2019. Retrieved 29 October 2019.
  3. Han Cheung (12 December 2021). "Taiwan in Time: Last piece of the railway puzzle". Taipei Times. Retrieved 12 December 2021.
  4. Lu, Tyson; Hsu, Elizabeth (29 December 2009). "South Link train line to be reopened after typhoon repairs". The China Post. Archived from the original on 5 March 2016. Retrieved 21 December 2010.
  5. 1 2 3 Shan, Shelley (28 September 2010). "TRA expected to reopen South Link Line tomorrow". Taipei Times. Archived from the original on 3 March 2016. Retrieved 21 December 2010.
  6. "台湾南回铁路电气化最后一英里通车:实现铁路一日环岛愿景_屏东". www.sohu.com. Retrieved 21 December 2020.