Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a28ad28ebd1baddf

Jump to content

// Workers AI · dad joke modeWhy did the railway test track go to therapy? It had a lot of track records.

From Wikipedia, the free encyclopedia
(Redirected from Railway test track)

Railway test tracks and their facilities are used for rolling stock testing and certification. Railway test tracks around the world include:

China

[edit]

Czech Republic

[edit]

France

[edit]
  • Centre d'essais ferroviaires – Near Alstom Valenciennes factory site in Raismes, includes 2.75 km for testing at 100 km/h, a 1.85 km loop for endurance testing at 80 km/h, and a loop for testing driverless trains.

Germany

[edit]

India

[edit]

Italy

[edit]

Japan

[edit]

Poland

[edit]

Romania

[edit]

Russia

[edit]

Singapore

[edit]

Spain

[edit]

The test track is built on the site of a closed broad gauge (1,668 mm (5 ft 5+2132 in)) line.

United Kingdom

[edit]

United States

[edit]
  • Maglev – AMT Test Track, Powder Springs, Georgia
  • Transportation Technology Center – Four test tracks, total length 48 miles (77 km), max speed (one of the tracks) 165 mph (266 km/h), Pueblo, Colorado[7]
  • Miner Enterprises – Incline test track used for dynamic impacts, with a maximum drop speed of 16 mph (26 km/h), Geneva, Illinois[8]

References

[edit]
  1. https://web.archive.org/web/20161202150026/https://www.ndr.de/nachrichten/niedersachsen/osnabrueck_emsland/Transrapid-Teststrecke-vor-dem-Abriss,transrapid295.html
  2. "Indian Railways' New High-Speed Test Track Near Phulera To Be Ready By 2023 End". railpost.in. 13 March 2022.
  3. "Substantial Enhancement & Utilization of "MIHARA(Multipurpose Integrated Highly-Advanced Railway Applications) Test Center"" (PDF). Mitsubishi Heavy Industries.
  4. "New test track at NEWAG". Newag. 26 November 2020.
  5. Phillips, Lauren (8 June 2022). "Global rail test hub is all set for 2025 completion". Western Mail. p. 26. ISSN 0307-5214.
  6. Sherratt, Philip (September 2022). "A test centre with a view". Modern Railways. Vol. 79, no. 888. Stamford: Key Publishing. p. 68. ISSN 0026-8356.
  7. "On-Site Track at TTCI". TTCI.
  8. "Railcar Impact Test Track". Minerent.