Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a262aca77da2b40c

Jump to content

// Workers AI · dad joke modeWhat did Markland Locks and Dam say? "I'm locked into helping you dam up some fun

(Redirected from Markland Dam Bridge)

Markland Locks and Dam
Markland Locks and Dam in 2024
Map
Interactive map of Markland Locks and Dam
LocationGallatin County, Kentucky /
York Township, Switzerland County, Indiana, United States
Coordinates38°46′29″N 84°57′51″W / 38.77472°N 84.96417°W / 38.77472; -84.96417
Construction beganMarch 1956
Opening dateJune 1964
Operators United States Army Corps of Engineers Louisville District,
Duke Energy Indiana
Dam and spillways
ImpoundsOhio River
Length1395 ft (425.2 m)
Power Station
OperatorDuke Energy[1]
Installed capacity81 Mva

The Markland Locks and Dam is a concrete dam bridge and locks that span the Ohio River. The dam is 1,395 feet (425.2 m) long, and connects Gallatin County, Kentucky, and Switzerland County, Indiana.

The locks and dam were reviewed by the Board of Engineers for River and Harbours to replace the Ohio River locks and dams numbers 35, 36, 37, 38 and 39. The project was approved by the Secretary of the Army on March 11, 1953. Construction on the locks began in March 1956 and they were placed in operation in May 1959. Dam construction began in April 1959 and was finished in June 1964.

The Federal Power Commission granted a license for Cinergy to operate a hydroelectric power plant at the dam. Cinergy was later bought by Duke Energy. The plant has a capacity of 81,000 kilovolt-amperes.[2]

On September 27, 2009, the lower miter gate failed on the 1,200-foot (370 m) lock due to a solenoid malfunction. The lock chamber remained closed for 155 days, but the 600-foot (180 m) lock continued to lock traffic, albeit with delays.[3] The 1,200-foot lock was repaired and reopened on March 1, 2010.

See also

[edit]

References

[edit]
  1. "Louisville District > Missions > Civil Works > Navigation > Locks and Dams > Markland Locks and Dam". United States Army Corps of Engineers: Louisville District. Archived from the original on February 22, 2013.
  2. "Markland". United States Army Corps of Engineers: Louisville District.{{cite web}}: CS1 maint: deprecated archival service (link)
  3. "Markland Locks & Dam". United States Army Corps of Engineers: Louisville District. Archived from the original on February 9, 2012.
[edit]
The Steven J Mason (Ingram Barge Co.) locking through
Markland Lock and dam aerial