Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a299abcabee91dfc

Jump to content

// Workers AI · dad joke modeWhy did the Green Line go to therapy? It had a lot of track issues.

From Wikipedia, the free encyclopedia
(Redirected from Line 5 (Delhi Metro))

Green Line
(Line 5)
A Mitsubishi-Rotem-BEML train at the Rajdhani Park metro station
Overview
StatusOperational
LocaleDelhi, Bahadurgarh
Termini
Stations24
Service
TypeRapid transit
SystemDelhi Metro
OperatorDMRC
Depots
Rolling stockMitsubishi-Rotem-BEML
History
Opened3 April 2010; 16 years ago (3 April 2010)
Last extension24 June 2018
Technical
Line length28.79 km (17.89 mi)
CharacterElevated and at-grade
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC from overhead catenary
SignalingBombardier Transportation: CITYFLO 350[1]
Route map

Brigadier Hoshiyar Singh
Bahadurgarh City
Bahadurgarh Depot
Pandit Shree Ram Sharma
Delhi
Haryana
border
Tikri Border
Tikri Kalan
Ghevra
Najafgarh Road
Mundka Industrial Area (MIA)
Mundka Depot
Mundka
Rajdhani Park
Nangloi Railway Station
Nangloi railway station
Nangloi
Najafgarh Road (towards Dhansa)
Maharaja Surajmal Stadium
Udyog Nagar
Peeragarhi
Outer Ring Road
Paschim Vihar West
Paschim Vihar East
Madipur
Shivaji Park
Punjabi Bagh West
Ring Road
Punjabi Bagh
Ashok Park Main
Inderlok

The Green Line (Line 5) is a rapid transit metro line of the Delhi Metro in Delhi, India. It consists of 24 stations covering a total length of 28.79 km (17.89 mi). It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[2]

The line is almost fully elevated (except for Kirti Nagar Metro Station, which is at-grade) and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to 5 ft 6 in (1,676 mm) broad gauge, prevalent in the Red, Yellow and Blue Lines.

History

[edit]

The line was opened in two stages, with the 15.1 km (9.38 mi) Inderlok – Mundka section opening on 3 April 2010[3] and the 3.5 km (2.17 mi) Kirti Nagar – Ashok Park Main branch line opening on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines because it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.

On 6 August 2012, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km (6.95 mi) metro stretch comprises seven stations, with four of them in Delhi and the remaining three in Bahadurgarh – Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).[4] Construction work of this extension began in 2013 and was completed by the second half of 2018 as part of Delhi Metro's Phase III expansion. The inauguration of the Mundka – Bahadurgarh stretch took place on 24 June 2018.

In late October 2019, it was decided to construct steel platforms on the viaduct of the Green Line between Punjabi Bagh and Shivaji Park stations to provide a seamless interchange between the Green Line and Pink Line.[5] Construction began in that year itself and the new halt platform of the Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022 after multiple delays.[6]

The new halt platform of the Green Line is connected by a foot over bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres (696 ft) long. The new platforms are 155 metres (509 ft) in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[6]

Extension to Indraprastha

[edit]

Under Phase-IV, six new lines covering a length of about 104 km (64.62 mi) were planned to be added to the metro network, out of which the extension of the Green Line would connect Inderlok with Indraprastha, at a length of 12.57 km (7.81 mi). The plans were finalized for implementation by the Government of Delhi in December 2018.[7]

A 12.37 km (7.69 mi) extension of the Green Line with ten stations was approved by the Union Government in March 2024. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[8][9][10]

As of 11 February 2026, it was decided that the Inderlok-Indraprastha corridor under the Green Line's extension for Phase 4 will be implemented as an extension for the Magenta Line instead, which will bring the total corridor length from Botanical Garden to Inderlok to about 89 km, making it the longest metro line in Delhi. Consequently, the line will form an interchange with itself at Nabi Karim.[11]

Stations

[edit]

Main line

[edit]
Green Line
# Station name Phase Opening Interchange connection Station layout Platform level type
English Hindi
1 Inderlok इंद्रलोक II 3 April 2010 Red Line
Magenta Line
(Phase IV - under construction)
Elevated Island
2 Ashok Park Main अशोक पार्क मेन Green Line Side
3 Punjabi Bagh पंजाबी बाग़ None
4 Punjabi Bagh West पंजाबी बाग़ पश्चिम 29 March 2022 Pink Line
5 Shivaji Park शिवाजी पार्क 3 April 2010 up Shakurbasti
6 Madipur मादीपुर None
7 Paschim Vihar East पश्चिम विहार पूर्व
8 Paschim Vihar West पश्चिम विहार पश्चिम
9 Peeragarhi पीरागढ़ी Magenta Line
(Phase IV - under construction)
10 Udyog Nagar उद्योग नगर None
11 Maharaja Surajmal Stadium महाराजा सूरजमल स्टेडियम
12 Nangloi नांगलोई Grey Line Phase V(B) Dhansa Bus Stand
13 Nangloi Railway Station नांगलोई रेलवे स्टेशन up Nangloi
14 Rajdhani Park राजधानी पार्क None
15 Mundka मुण्डका
16 Mundka Industrial Area (MIA) मुण्डका इंडस्ट्रियल एरिया (एमआईए) III 24 June 2018
17 Ghevra Metro Station घेवरा मेट्रो स्टेशन
18 Tikri Kalan टीकरी कलाँ
19 Tikri Border टीकरी बॉर्डर
20 Pandit Shree Ram Sharma
(Modern Industrial Estate)
पंडित श्री राम शर्मा
(मॉर्डन इंडस्ट्रियल एस्टेट)
21 Bahadurgarh City
(Bus Stand)
बहादुरगढ़ सिटी
(बस स्टैंड)
22 Brigadier Hoshiyar Singh
(Bahadurgarh City Park)
ब्रिगेडियर होशियार सिंह
(बहादुरगढ़ सिटी पार्क)

Branch line

[edit]
Green Line Branch
# Station name Phase Opening Interchange connection Station layout Platform level type
EnglishHindi
1 Ashok Park Main* अशोक पार्क मेन* II 3 April 2010 Green Line Elevated Side
2 Satguru Ram Singh Marg सतगुरु राम सिंह मार्ग 27 August 2011 up Patel Nagar
3 Kirti Nagar कीर्ति नगर Blue Line At-grade

Train info

[edit]
Green Line
Rakes Mitsubishi Hyundai Rotem BEML
Train length 4
Train gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 25 kV 50 Hz AC (nominal) from overhead catenary
Train's maximum speed 100 km/h
Train operation Inderlok - Mundka

Kirti Nagar - Brig. Hoshiyar Singh

Infrastructure

[edit]

The Green Line is equipped with Bombardier CITYFLO 350 signalling.[1][3]

Rolling stock

[edit]

The Green Line uses standard-gauge trains that were manufactured by a consortium of Mitsubishi, Hyundai Rotem, and BEML. A total of 196 cars for the Green Line and the Violet Line were ordered in both four-car configurations (46 trains) and six-car configurations (two trains). One train was manufactured at Changwon in South Korea, while the remaining trains were manufactured at BEML's facility in Bangalore. The width of these trains is 2.9 meters as compared to 3.2 meters on broad gauge trains.[12]

Future extensions

[edit]

  • Rohtak: Green Line (Delhi Metro) will be extended from existing metro station in Bahadurgarh to Rohtak in the following phases:
    • Delhi Green Line Metro: Bahadurgarh to Asaudha extension: The Bahadurgarh (Brigadier Hoshiyar Singh metro station) to Asaudha extension to Asaudha railway station has been approved, where it will interchange with Haryana Orbital Rail Corridor at Asaudha railway station.[14] From the existing Brigadier Hoshiar Singh metro station, it will extended east to Western Peripheral Expressway (WPE) with 5 new stations, namely Sankhol, Udhyog Vihar Sector 16 (near Somany Ceramics and Parle-G biscuit factory), HSIDC Sector 17, Jakhoda (eastern intersection of Delhi Road and Bahadurgarh Southern Bypass), HPCL Plant, and Asaudha near WPE (integrate with Asaudha railway station of Delhi-Rohtak-Hisar line and Haryana Orbital Rail Corridor (HORC)). Physical survey was completed in November 2025, DPR will be ready in 6 months by May 2026, after which tenders will be issued once the budget is approved.[15]
    • Delhi Green Line Metro: Asaudha to Rohtak extension: It will be further extended from Asaudha to Rohtak city.[14]

See also

[edit]

References

[edit]
  1. 1 2 "Bombardier Signalling Technology Used on New Delhi Metro Line". railwaytechnology.com. March 2018. Archived from the original on 21 June 2025. Retrieved 22 February 2026. Bombardier has been delivering rail signalling in India for over 30 years and is DMRC's largest signalling supplier. Delhi Metro Lines 5 and 6 are equipped with its CITYFLO 350 semi-automatic solution.
  2. "PM Narendra Modi inaugurates Mundka-Bahardurgarh metro network". The Times of India. 24 June 2018.
  3. 1 2 "Delhi metro opens first standard gauge line". Railway Gazette. 6 April 2010. Archived from the original on 29 June 2010. Retrieved 5 September 2010.
  4. Krar, Prashant (7 August 2012). "Centre approves Delhi-Bahadurgarh metro link". The Economic Times. ISSN 0013-0389. Retrieved 5 April 2024.
  5. "Delhi: When changing stations means you have to get down in the middle of the metro track". The Times of India. 18 October 2019. Retrieved 9 April 2021.
  6. 1 2 "Delhi metro's first interchange station inaugurated at Punjabi Bagh, connects Green line to Pink line". Mint. 29 March 2022. Retrieved 31 March 2022.
  7. "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
  8. "Delhi to get two new Metro lines: Lajpat Nagar-Saket, Inderlok-Indraprastha". The Indian Express. 13 March 2024. Retrieved 5 April 2024.
  9. "Delhi Metro Phase-IV: Union Cabinet approves two corridors of Delhi Metro Projects". The Hindu. 13 March 2024. ISSN 0971-751X. Retrieved 5 April 2024.
  10. "Union Cabinet approves two new Metro lines in Delhi; check routes, stations". Business Today. 13 March 2024. Retrieved 5 April 2024.
  11. "Indraprastha-Inderlok corridor to be extension of Magenta Line". Times of India. 30 January 2026. Retrieved 17 February 2026.
  12. "Delhi Metro gets standard gauge train". Hindu Business Line. 18 March 2009. Archived from the original on 23 June 2009. Retrieved 5 September 2010.
  13. Daily, Keralakaumudi. "New Delhi underground metro aims to transform Central Vista by 2026". Keralakaumudi Daily. Retrieved 10 June 2026.
  14. 1 2 Team, DNA Web. "NCR news: New Metro link from Gurugram's Rezang La Chowk to Delhi IGI Airport, two more proposed". DNA India. Retrieved 10 June 2026.
  15. "खुशखबरी: बहादुरगढ़ से आसौदा तक मेट्रो विस्तार प्रोजेक्ट पर काम शुरू, इन जगहों पर बनेंगे स्टेशन". Haryana E Khabar (in Hindi). 17 October 2025. Retrieved 10 June 2026.
[edit]