Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22627a68fbcdfff

Jump to content

Double junction

From Wikipedia, the free encyclopedia
(Redirected from Ladder crossing)
Double junction, or level junction (left hand running)

A double junction is a railway junction where a double-track railway splits into two double track lines. Often, one line is the main line and carries traffic through the junction at normal speed, while the other track is a branch line that carries traffic through the junction at reduced speed.

A number of configurations are possible.

Types

[edit]
Principal double junction configurations with right-hand running
  • Diamond – Most double junctions are of this type. Consists of two switches, and a diamond crossing where the opposite tracks meet. Because the switches in this arrangement are close together, the entire junction can be controlled by the mechanical point rodding of a single signal box.
  • Ladder – Instead of a diamond, two switches are used. This can improve speed, as the intersecting tracks are able to meet at a finer angle. This type may also be built when adding a second track to a single lead junction.
  • Single-lead – The branching line merges into a single track for the duration of the junction, before returning to double track. This type may be chosen over a ladder type due to having fewer switches on the mainline, saving on maintenance.
  • Grade separated – Instead of a diamond, a bridge or tunnel is used to eliminate the crossing altogether. This removes unnecessary merging conflicts, improving both safety and throughput.

Safety

[edit]

Because double junctions contain a merging conflict as well as a crossing conflict, there is risk of a collision if train runs a red signal. This risk can be partially mitigated by never having both switches point towards the crossing at the same time, but collisions are still possible.

Single lead junctions are higher risk than other types due to the possibility of two trains colliding head-on on the branching line.

Grade separated junctions contain fewer conflicts, and are thus lower risk than other types.

Systems independent of the junction design can also be implemented, such as ATP and Train stop.

See also

[edit]

References

[edit]

Sources

[edit]
  • Hall, Stanley (1999). Hidden Dangers: Railway Safety in the Era of Privatisation. Sheperton: Ian Allan. ISBN 0-7110-2679-3.