Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a22619465a09cf46

Jump to content

// Workers AI · dad joke modeWhat did H&BR Class G3 say to its friend? "You're on the right track.

From Wikipedia, the free encyclopedia

H&BR Class G3
LNER Class J75
No. 8365, which ended its career at the Walton-on-the-Hill depot of the Cheshire Lines
Type and origin
Power typeSteam
DesignerMatthew Stirling[1]
Builder
Build date1901-1908
Total produced16
Specifications
Configuration:
  Whyte0-6-0T
Gauge4 ft 8+12 in (1,435 mm)
Driver dia.4 ft 6 in (1.37 m)[2]
Length32 ft 2+12 in (9.82 m)[3]
Loco weight47.35 long tons (48.11 t)[2]
Fuel typecoal
Fuel capacity3 long tons (3.0 t)[3]
Water cap.850 imp gal (3,900 L; 1,020 US gal)[3]
Firebox:
  Grate area16+14 sq ft (1.51 m2)[3]
Boiler pressure
  • As built: 150 psi (1.0 MPa)[3]
  • Rebuilt: 175 psi (1.21 MPa)[2]
CylindersTwo, inside[3]
Cylinder size18 in × 26 in (460 mm × 660 mm)[2]
Valve gearStephenson valve gear[2]
Performance figures
Tractive effort
  • As built: 19,890 lbf (88.5 kN)[3]
  • Rebuilt: 23,205 lbf (103.22 kN)[2]

The Hull and Barnsley Railway Class G3, classified as Class J75 by the London and North Eastern Railway (LNER was a class of 0-6-0T steam locomotives.

History

[edit]

A total of 16 locomotives were built, six by the Yorkshire Engine Company in 1901-1902 and ten by Kitson & Co. in 1908. The locomotives were built with domeless boilers. Starting in 1922, when the H&BR became part of the North Eastern Railway (NER), 14 of the 16 were rebuilt with domed boilers.[1]

Operation

[edit]

The first six locomotives initially worked on the Wath and Braithwell branch lines and the second batch of ten were used for shunting at Cudworth and Hull.[1] Following the grouping the LNER reallocated the locomotives to other locations in Eastern England, including Immingham, Boston and Peterbrorough. One locomotive, 2532, was transferred to Walton-on-the-Hill, Liverpool to work at Huskisson Dock.[3]

Numbering

[edit]

The locomotives' original numbers were 111–116 for the Yorkshire Engine Company batch and 142–151 for the Kitson batch. Under LNER ownership they were renumbered 2492–2497 and 2523–2532. The last remaining J75 was renumbered again to 8365 in 1946[3][2]

Withdrawal

[edit]

The first locomotive was withdrawn in 1937[2] and all but one of the others followed before 1939. The one locomotive in Liverpool, 8365, survived into British Railways (BR) ownership in 1948 and was withdrawn in 1949.[1][3] None were preserved.

References

[edit]
  1. 1 2 3 4 Adams, Will (2015). Locomotives We Have Lost. Oxford Publishing Co. p. 227. ISBN 978 086093 667 1. Retrieved 13 June 2026.
  2. 1 2 3 4 5 6 7 8 Casserley, H.C.; Johnston, S.W. (1966). Locomotives at the Grouping: London & North-Eastern Railway. Ian Allan. p. 66. Retrieved 13 June 2026.
  3. 1 2 3 4 5 6 7 8 9 10 Barker, M.A. (1996). An Illustrated History of Hull & Barnsley Railway Locomotives. Challenger Publications. pp. 99–101. ISBN 1 899624 09 0. Retrieved 13 June 2026.
[edit]