Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a424e4e92bf018aa

Jump to content

Burj Azizi

Burj Azizi
برج عزيزي
3D rendering of Burj Azizi
Map
Interactive map of the Burj Azizi area
Former namesEntisar Tower
General information
StatusUnder construction[1]
TypeResidential, hotel, retail, observation, restaurant
LocationSheikh Zayed Road, Dubai, United Arab Emirates
Coordinates25°13′27″N 55°16′57″E / 25.224056°N 55.282611°E / 25.224056; 55.282611
Construction started
29 August 2016; 10 years ago (29 August 2016) (restarted construction in August 21, 2024)
Estimated completion
2030[2]
OwnerAzizi Developments
Height
Architectural725 m (2,379 ft)
Roof665 m (2,182 ft)
Top floor627 m (2,057 ft)
Observatory649 m (2,129 ft)
Technical details
Floor count133
Floor area279,200 m2 (3,005,000 sq ft)
Lifts/elevators44
Design and construction
ArchitectAE7[3]
DeveloperAzizi Developments
Other designersQualiconsult International, DSGN, Eversendai Corporation, International Foundations Group
Main contractorGardinia Contracting

Burj Azizi (Arabic: برج عزيزي) is an under construction skyscraper and a centrepiece of Sheikh Zayed Road, in Dubai, United Arab Emirates.[4] It will have 133 floors for various purposes.[5] Burj Azizi could be the world's second-tallest building once completed, if it reaches its proposed height of 725 meters (2,379 feet); this is 103 metres (338 ft) shorter than the Burj Khalifa, located 2 kilometres (1.2 mi) away.[6][7]

History

[edit]
Entisar Tower's logo

In 2012, Meydan Group announced the Entisar Tower as a 570 m (1,870 ft) tower and 122-story skyscraper. Groundbreaking occurred in 2016. Construction was halted in 2017 due to Dubai's civic building proposals department issuing a stop-work order due to a payment dispute with the developers, with the ensuing property bust making the projects abandoned.

In 2018, Azizi Developments acquired the long-stalled Entisar Tower. In January 2024, the tower was rebranded, redesigned and renamed as Burj Azizi, and construction restarted in 2025.[citation needed] The building is named after Mirwais Azizi, the chairman of Azizi Bank and Afghanistan's richest man.[8] As of May 2026, works were progressing on the tower's raft foundation and its nine-basement-level automated car park building, with around 750 workers on site daily.[9]

See also

[edit]

References

[edit]
  1. ↑ "Burj Azizi". Retrieved 2026-02-01.
  2. ↑ "Burj Azizi, Trade Center 1: off-plan prices and project data". dataHabibi. Retrieved 2026-07-04.
  3. ↑ "AE7 Home Page".
  4. ↑ Cairns, Rebecca (September 5, 2024). "Dubai is home to world's tallest skyscraper. Now it's building the second-tallest, too". CNN.
  5. ↑ "Entisar Tower - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2020-02-19.
  6. ↑ "Burj Azizi in Dubai to be world's second tallest building when built". Time Out Dubai. 2024-11-25. Retrieved 2024-12-06.
  7. ↑ "Burj Azizi, Dubai - SkyscraperPage.com". skyscraperpage.com. Retrieved 2025-11-05.
  8. ↑ "A Dubai property tycoon's $10 billion plan to save Afghanistan". The National. Retrieved 2026-07-04.
  9. ↑ "Azizi ramps up construction on 725-metre Burj Azizi tower". Zawya. 8 May 2026. Retrieved 2026-07-04.
[edit]