Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a425336d0b782f31

Jump to content

Barbur Boulevard Transit Center

Barbur Boulevard Transit Center
Barbur Boulevard Transit Center in 2026
General information
Location9750 SW Barbur Boulevard
Portland, Oregon
USA
Coordinates45°27′16″N 122°43′03″W / 45.454550°N 122.717394°W / 45.454550; -122.717394
SystemBus transit center
OwnerTriMet
Construction
Parking368 spaces
Cycle facilities
Bike racks and lockers
AccessibleAccessible to people with mobility devices
History
Opened1977[1]
Location
Map

The Barbur Boulevard Transit Center is a TriMet transit center located at 9750 SW Barbur Boulevard, near the intersection with Capitol Highway in southwest Portland, Oregon.[2] In the late 2010s and early 2020s, Barbur TC was proposed to be a future stop on the MAX Light Rail system as part of the Southwest Corridor MAX Project,[3] before that project was mothballed.[4] In 2022, a portion of the transit center's roof was torn off during a wind storm on December 27.[5]

Bus line connections

[edit]
Barbur Blvd Transit Center in 1982 with an articulated bus

The following bus routes currently serve the transit center as of August 2026:[2]

Previously, the SMART bus 2X route served the transit center,[6] but service was reduced to only go as far north as the Tualatin Park & Ride in September 2019.[7][8]

See also

[edit]

References

[edit]
  1. ↑ "Transit station to open Monday". The Sunday Oregonian, August 14, 1977, p. D1.
  2. 1 2 "Barbur Blvd. Transit Center". TriMet. Retrieved December 6, 2023.
  3. ↑ Theen, Andrew (June 12, 2019). "7 things to know about TriMet's proposed Southwest Portland MAX line". The Oregonian. Retrieved September 20, 2026.
  4. ↑ "Southwest Corridor Light Rail Project". TriMet. Archived from the original on June 30, 2025. Retrieved September 20, 2026.
  5. ↑ Mock, Eric; KATU Staff (December 27, 2022). "Winds rip the roof off Barbur Transit Center, down trees; rain causes flooding". KATU. Archived from the original on December 30, 2022. Retrieved September 25, 2026.
  6. ↑ "Routes: 2X - Barbur". South Metro Area Regional Transit. 2014. Archived from the original on October 6, 2014. Retrieved June 21, 2021.
  7. ↑ Buchanan, Corey (June 5, 2019). "Wilsonville's transit provider alters route, adds frequency". Wilsonville Spokesman. Archived from the original on June 8, 2019.
  8. ↑ "SMART System Map". South Metro Area Regional Transit. Retrieved October 29, 2019.
[edit]