Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a24d8c868deccdd8

Jump to content

// Workers AI · dad joke modeIs Bonifacio Global City station a train stop? It's a terminal decision.

From Wikipedia, the free encyclopedia
(Redirected from BGC station)

Bonifacio Global City
 MMS 
General information
LocationMcKinley Parkway, Bonifacio Global City, Taguig
Owned byDepartment of Transportation (DOTr)
Line     Metro Manila Subway
Platforms1 island platform
Tracks2
Construction
Structure typeUnderground (cut-and-cover)
Platform levels4
Other information
StatusUnder construction
Station code BL12 
History
Opened2032 (2032) (expected)
Services
Preceding station Manila MRT Following station
Kalayaan Metro Manila Subway
Lawton
towards FTI or NAIA Terminal 3

Bonifacio Global City station (also known as BGC station) is an underground rapid transit station under construction on the Metro Manila Subway (Line 9). Located along McKinley Parkway between Serendra and the Market! Market! commercial complex in Bonifacio Global City (BGC), Taguig, the station is designed as a core high-density transportation nexus for the central BGC business district.

History

[edit]

The station is part of Contract Package 105 (CP 105), which was formally awarded by the Department of Transportation (DOTr) to the joint venture of Nishimatsu Construction Co., Ltd. and D.M. Consunji, Inc. (DMCI) on October 29, 2025.[1] The contract spans a total route segment of 1.33 kilometers (0.83 mi) encompassing both the Kalayaan and BGC underground structures. President Bongbong Marcos led the formal groundbreaking ceremony for the station on February 13, 2026, initializing the site excavation phase using heavy cut-and-cover setups and tunnel boring machines (TBM).[2]

Market! Market! Transit-Oriented Development

[edit]

The station footprint is integrated into a multi-stage, 10-hectare (25-acre) master plan spearheaded by the Bases Conversion and Development Authority (BCDA) to transform the current Market! Market! estate into a massive high-density Transit-Oriented Development (TOD).[3] Assisted by a structural grant from the Japan International Cooperation Agency (JICA) and master-planned by Almec Corporation, the ₱100-billion multi-firm initiative will roll out across three sequential phases to promote a high-density, walkable environment:[4]

  • Phase 1: Development of the open-space zones immediately flanking the subway terminal to establish a central station plaza. This setup features connected mixed-use towers, retail avenues, and initial residential units.
  • Phase 2: Expansion of multi-tier corporate office networks, international hotels, and residential blocks.
  • Phase 3: Phase-out and structural redevelopment of the main Market! Market! mall building. While the lease held by current operator Ayala Land expires in 2027, the BCDA has stated intentions to phase structural replacement incrementally to avoid commercial disruptions during the subway's baseline construction period.

References

[edit]
  1. Rosales, Elijah Felice (November 21, 2025). "Taguig subway deal awarded to DMCI, partner". The Philippine Star. Retrieved June 21, 2026.
  2. "Groundbreaking Ceremony of the Metro Manila Subway Project - Kalayaan Ave & BGC Stations". Radio Television Malacañang. February 13, 2026. Retrieved June 21, 2026.
  3. Desiderio, Louella (February 9, 2026). "Market! Market! up for redevelopment". The Philippine Star. Retrieved June 21, 2026.
  4. "Japan firms, ALI eye Market! Market! project". Philippine Daily Inquirer. February 10, 2026. Retrieved June 21, 2026.